ETM 1040 Technical Management Fundamentals | UPDATED Questions
with 100% Verified Answers
Question:
Question 3 TO2.EO4: A Systems Engineering Plan (SEP) should
cover: (Select three answers)
Answer:
**Validation and verification test scenarios
-Systems Engineering Processes
**The Key Performance Parameters (KPPs), as well as statutory and regulatory
requirements the program must meet
**How configuration Management will be used to control the program's technical
baseline
INCORRECT
**important design considerations
-which measures will be used and how they will be used to asses technical progress
**systems engineering processes
**detailed validation and verification procedures
INCORRECT
Question:
Question 8 TO4.EO2: A good requirement contains which of
the following?
Answer:
**A single shall statement
Question:
Question 23 TO8.EO3: Interface Management problems can
account for up to ___% of project costs, and it is critical to
establish work processes for managing interface related
issues. Failure to have an established interface Management
plan poses a significant risk of schedule delays, cost over runs
and failure to meet performance objectives.
Answer:
,**20
Question:
Question 4 TO2.EO3: A technical management plan which
provides top-level details of the planned technical effort is
the:
Answer:
**Systems Engineering plan (SEP)
Question:
Question 5 TO6.EO1: In traditional acquisition programs, what
must be done before modifying an operation system?
Answer:
-an operation system can only be modified to meet any approved baseline and/or
variance
-maintainers must approve the modification
**change in approved Engineering Change proposal (ECP) must be verified and
validation
Question:
Question 6 TO5.EO2: From the mitigation step in the DoD Risk
management process, what are the four mitigation options?
Answer:
**accept, avoid, transfer, or control
Question:
Question 7 TO4.EO3: You should ____________ the requirements for
the system model between baselines, especially those
requirements that are considered critical
Answer:
**track
-guide
Question:
, Question 26 TO1.EO5: Modeling and Simulation can be used
to:
Answer:
**support the verification and validation go technical processes to evaluate the
performance and maturity of the technologies being considered
Question:
Question 14 TO4.EO1: All the of following are key functions of
the requirements management process except ______________.
Answer:
**developing the best set of requirements possible
Question:
Question 25 TO6.EO2: How does an agile developer get
approval to start modifications to the baseline?
Answer:
**the work is the highest priority in the backlog
Question:
Question 20 TO4.EO4: Which of the following is not a
requirements traceability task?
Answer:
document
Question:
Question 12 TO7.EO2: what should engineers not do when
assisting Data Management (DM)?
Answer:
**require government or unlimited use rights for all products
Question:
Question 13 TO8.EO5: True or False: the primary focus of
interoperability certification and joint interoperability testing is
to determine (evaluation) whether or not the system conforms
with 100% Verified Answers
Question:
Question 3 TO2.EO4: A Systems Engineering Plan (SEP) should
cover: (Select three answers)
Answer:
**Validation and verification test scenarios
-Systems Engineering Processes
**The Key Performance Parameters (KPPs), as well as statutory and regulatory
requirements the program must meet
**How configuration Management will be used to control the program's technical
baseline
INCORRECT
**important design considerations
-which measures will be used and how they will be used to asses technical progress
**systems engineering processes
**detailed validation and verification procedures
INCORRECT
Question:
Question 8 TO4.EO2: A good requirement contains which of
the following?
Answer:
**A single shall statement
Question:
Question 23 TO8.EO3: Interface Management problems can
account for up to ___% of project costs, and it is critical to
establish work processes for managing interface related
issues. Failure to have an established interface Management
plan poses a significant risk of schedule delays, cost over runs
and failure to meet performance objectives.
Answer:
,**20
Question:
Question 4 TO2.EO3: A technical management plan which
provides top-level details of the planned technical effort is
the:
Answer:
**Systems Engineering plan (SEP)
Question:
Question 5 TO6.EO1: In traditional acquisition programs, what
must be done before modifying an operation system?
Answer:
-an operation system can only be modified to meet any approved baseline and/or
variance
-maintainers must approve the modification
**change in approved Engineering Change proposal (ECP) must be verified and
validation
Question:
Question 6 TO5.EO2: From the mitigation step in the DoD Risk
management process, what are the four mitigation options?
Answer:
**accept, avoid, transfer, or control
Question:
Question 7 TO4.EO3: You should ____________ the requirements for
the system model between baselines, especially those
requirements that are considered critical
Answer:
**track
-guide
Question:
, Question 26 TO1.EO5: Modeling and Simulation can be used
to:
Answer:
**support the verification and validation go technical processes to evaluate the
performance and maturity of the technologies being considered
Question:
Question 14 TO4.EO1: All the of following are key functions of
the requirements management process except ______________.
Answer:
**developing the best set of requirements possible
Question:
Question 25 TO6.EO2: How does an agile developer get
approval to start modifications to the baseline?
Answer:
**the work is the highest priority in the backlog
Question:
Question 20 TO4.EO4: Which of the following is not a
requirements traceability task?
Answer:
document
Question:
Question 12 TO7.EO2: what should engineers not do when
assisting Data Management (DM)?
Answer:
**require government or unlimited use rights for all products
Question:
Question 13 TO8.EO5: True or False: the primary focus of
interoperability certification and joint interoperability testing is
to determine (evaluation) whether or not the system conforms