Exam (elaborations)

ETM 1040 Technical Management Fundamentals | UPDATED Questions with 100% Verified Answers

Document preview thumbnail
Preview 3 out of 17 pages

ETM 1040 Technical Management Fundamentals | UPDATED Questions with 100% Verified Answers

Content preview

ETM 1040 Technical Management Fundamentals | UPDATED Questions
with 100% Verified Answers

Question:
Question 3 TO2.EO4: A Systems Engineering Plan (SEP) should
cover: (Select three answers)

Answer:
**Validation and verification test scenarios
-Systems Engineering Processes
**The Key Performance Parameters (KPPs), as well as statutory and regulatory
requirements the program must meet
**How configuration Management will be used to control the program's technical
baseline
INCORRECT
**important design considerations
-which measures will be used and how they will be used to asses technical progress
**systems engineering processes
**detailed validation and verification procedures
INCORRECT


Question:
Question 8 TO4.EO2: A good requirement contains which of
the following?

Answer:
**A single shall statement


Question:
Question 23 TO8.EO3: Interface Management problems can
account for up to ___% of project costs, and it is critical to
establish work processes for managing interface related
issues. Failure to have an established interface Management
plan poses a significant risk of schedule delays, cost over runs
and failure to meet performance objectives.

Answer:

,**20


Question:
Question 4 TO2.EO3: A technical management plan which
provides top-level details of the planned technical effort is
the:

Answer:
**Systems Engineering plan (SEP)


Question:
Question 5 TO6.EO1: In traditional acquisition programs, what
must be done before modifying an operation system?

Answer:
-an operation system can only be modified to meet any approved baseline and/or
variance
-maintainers must approve the modification
**change in approved Engineering Change proposal (ECP) must be verified and
validation


Question:
Question 6 TO5.EO2: From the mitigation step in the DoD Risk
management process, what are the four mitigation options?

Answer:
**accept, avoid, transfer, or control


Question:
Question 7 TO4.EO3: You should ____________ the requirements for
the system model between baselines, especially those
requirements that are considered critical

Answer:
**track
-guide


Question:

, Question 26 TO1.EO5: Modeling and Simulation can be used
to:

Answer:
**support the verification and validation go technical processes to evaluate the
performance and maturity of the technologies being considered


Question:
Question 14 TO4.EO1: All the of following are key functions of
the requirements management process except ______________.

Answer:
**developing the best set of requirements possible


Question:
Question 25 TO6.EO2: How does an agile developer get
approval to start modifications to the baseline?

Answer:
**the work is the highest priority in the backlog


Question:
Question 20 TO4.EO4: Which of the following is not a
requirements traceability task?

Answer:
document


Question:
Question 12 TO7.EO2: what should engineers not do when
assisting Data Management (DM)?

Answer:
**require government or unlimited use rights for all products


Question:
Question 13 TO8.EO5: True or False: the primary focus of
interoperability certification and joint interoperability testing is
to determine (evaluation) whether or not the system conforms

Document information

Uploaded on
September 25, 2026
Number of pages
17
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ExamsCollection
4.0
(42)
Sold
225
Followers
9
Items
34253
Last sold
8 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions