ETM 1040 Technical Management Fundamentals | UPDATED Questions
with 100% Verified Answers
Question:
How does an agile developer get approval to start
modifications to the baseline?
Answer:
INCORRECT Answer:
The Configuration Control Board (CCB) approves the Engineering Change Proposal
(ECP)
Question:
From the monitoring step in the Department of Defense
(DOD) Risk Management process, what is a Risk Register?
Answer:
A repository for identified end accepted program risks
Question:
The Module Open Systems Approach (MOSA) promotes the
acquisition of systems that are modular and interoperable,
allowing for system elements to be:
Answer:
Added, modified, replaced, removed, end supported by a variety of different vendors
Question:
The Joint Capabilities Integration and Development System
(JCIDS) process generates requirements, documents, and
architectures that provide the initial insight for:
Answer:
External Interfaces
Question:
The interoperability certification tests collect data from:
(Select the two answers that apply.)
, Answer:
Developmental Test and Evaluation
Cybersecurity
Question:
How do you get approval to create a new Item Performance
specification in the Materiel Solutions Analysis phase of the
Major Capability Acquisition Pathway?
Answer:
Since the Allocated Baseline is not under Configuration Control until the Preliminary
Design Review (PDR), the specification can be created without approval
Question:
True or False: Interface management is not an iterative
process, and completion of the Interface Management Plan
should complete this portion of the Technical Management
process.
Answer:
False
Question:
True or False: If the contract gives unlimited data rights to the
government, it doesn't matter how the product is marked.
Answer:
False
Question:
Which is the cheapest way to upgrade systems?
Answer:
Spares upgrade so old parts get maximum wear
Question:
What are the three categories risk consequences fall into?
(Select the three answers that apply.)
with 100% Verified Answers
Question:
How does an agile developer get approval to start
modifications to the baseline?
Answer:
INCORRECT Answer:
The Configuration Control Board (CCB) approves the Engineering Change Proposal
(ECP)
Question:
From the monitoring step in the Department of Defense
(DOD) Risk Management process, what is a Risk Register?
Answer:
A repository for identified end accepted program risks
Question:
The Module Open Systems Approach (MOSA) promotes the
acquisition of systems that are modular and interoperable,
allowing for system elements to be:
Answer:
Added, modified, replaced, removed, end supported by a variety of different vendors
Question:
The Joint Capabilities Integration and Development System
(JCIDS) process generates requirements, documents, and
architectures that provide the initial insight for:
Answer:
External Interfaces
Question:
The interoperability certification tests collect data from:
(Select the two answers that apply.)
, Answer:
Developmental Test and Evaluation
Cybersecurity
Question:
How do you get approval to create a new Item Performance
specification in the Materiel Solutions Analysis phase of the
Major Capability Acquisition Pathway?
Answer:
Since the Allocated Baseline is not under Configuration Control until the Preliminary
Design Review (PDR), the specification can be created without approval
Question:
True or False: Interface management is not an iterative
process, and completion of the Interface Management Plan
should complete this portion of the Technical Management
process.
Answer:
False
Question:
True or False: If the contract gives unlimited data rights to the
government, it doesn't matter how the product is marked.
Answer:
False
Question:
Which is the cheapest way to upgrade systems?
Answer:
Spares upgrade so old parts get maximum wear
Question:
What are the three categories risk consequences fall into?
(Select the three answers that apply.)