Question:
The technical assessment process provides which of the
following? (select the three answers that apply.)
a) an assessment of the system's readiness for deployment to
the fleet
b) support for the establishment of the various baselines and
achievement of system verification
c) a fact based understanding of the current level of product
technical maturity program status and technical risk
d) a basis for tracking development of the system and lower
level system element designs
Answer:
a, b, c
Question:
When presenting a decision briefing to a senior leader, which
approach would you most likely use?
a) judgmental
b) informal
c) empirical
d) formal
Answer:
d
Question:
Key outputs of of the technical planning process include:
(select two answers that apply)
a) applicable policies, procedures, and processes
b) a system engineering plan (SEP)
c) a test and evaluation master plan (TEMP)
d) any previously developed technical plans
Answer:
, b, c
Question:
Technical assessment products feed and/or support which of
the following:
(Select two answers that apply.)
a) the acquisition program baseline (APB)
b) the systems engineering plan (SEP)
c) the mission baseline
d) the performance measurement baseline (PMB)
Answer:
b, d
Question:
when selecting a requirements management tool, it should
allow for:
a) changes to the process, history of the technical decisions,
and consistency of system components
b) the maintenance of change process, technical decision,
tracking allocations, and system consistency
c) the generation of a requirements traceability matrix, system
components catalog, and parts inventory
d) the cataloging of meeting minutes, tracking system parts,
and consistency of system component
Answer:
a (wrong)
Question:
true of false: modeling and simulations are outputs of the
decision analysis process.
Answer:
false (unsure)
Question:
Question:
The technical assessment process provides which of the
following? (select the three answers that apply.)
a) an assessment of the system's readiness for deployment to
the fleet
b) support for the establishment of the various baselines and
achievement of system verification
c) a fact based understanding of the current level of product
technical maturity program status and technical risk
d) a basis for tracking development of the system and lower
level system element designs
Answer:
a, b, c
Question:
When presenting a decision briefing to a senior leader, which
approach would you most likely use?
a) judgmental
b) informal
c) empirical
d) formal
Answer:
d
Question:
Key outputs of of the technical planning process include:
(select two answers that apply)
a) applicable policies, procedures, and processes
b) a system engineering plan (SEP)
c) a test and evaluation master plan (TEMP)
d) any previously developed technical plans
Answer:
, b, c
Question:
Technical assessment products feed and/or support which of
the following:
(Select two answers that apply.)
a) the acquisition program baseline (APB)
b) the systems engineering plan (SEP)
c) the mission baseline
d) the performance measurement baseline (PMB)
Answer:
b, d
Question:
when selecting a requirements management tool, it should
allow for:
a) changes to the process, history of the technical decisions,
and consistency of system components
b) the maintenance of change process, technical decision,
tracking allocations, and system consistency
c) the generation of a requirements traceability matrix, system
components catalog, and parts inventory
d) the cataloging of meeting minutes, tracking system parts,
and consistency of system component
Answer:
a (wrong)
Question:
true of false: modeling and simulations are outputs of the
decision analysis process.
Answer:
false (unsure)