Which project delivery method best fits the description: The designer and builder hold separate
contracts with the owner and a construction manager is utilized earlier in the project to offer
construction knowledge to the designer during the design phase but is not directly responsible for
construction. - (answer)Construction Manager Agency
Which project delivery method best fits the description: The designer, appropriate engineers, and
contractor work together with similar goals and objectives from the very beginning of the project.
Leading a better coordinated and more collaborative project. - (answer)Integrated Project Delivery
Which project delivery method best fits the description: The designer and builder are one entity that is
in charge of the design and construction of the project. There is one contract held between the owner
and this entity. - (answer)Design-Build
Which of the following best fits the following description: Temporary sediment control device often
staked in the ground with metal posts and wired backed fabric. - (answer)Silt Fence
Which of the following best fits the following description: mulch/seed slurry used to cover large areas of
land in a short period of time and stabilize the soil against runoff. - (answer)Hydroseeding
Which of the following best fits the following description: Earthen structure used to allow sediment in
water to settle before the water is discharged downstream. - (answer)Settling Basin/Pond
Which of the following best fits the following description: Environmentally friendly and biodegradable
method of erosion control used for slowing the flow of water and filtering out silt. - (answer)Hay Bales
A three story basement that extends 30' into the ground and is supported by strip footings is considered
a shallow foundation. - (answer)True
Type VB building codes are very restrictive in terms of size of structure because it allows for the use of
almost every material and does not contain requirements for high levels of fire resistance. - (answer)True
, CSM 2030 - FINAL EXAM BRAND NEW ACTUAL EXAM WITH 100%
VERIFIED QUESTIONS AND CORRECT SOLUTIONS ALREADY GRADED
A+ LATEST UPDATE GUARANTEED PASS!!!
The international building code restricts the type of building that can be put on any one parcel of land
based upon its use. - (answer)False
Poorly-graded soils consisting of course aggregate allows for better drainage than well-graded soils. -
(answer)True
Dampproofing is required on a foundation when there is higher levels of hydrostatic pressure. -
(answer)False
Clay is considered an unstable soil when exposed to moisture but it is very cohesive in nature. -
(answer)True
When a building settles equally across the site this is called uniform settlement. - (answer)True
Passivhaus, having its origins as the National Green Building Standard was developed by the National
Association of Home Builders and the International Code Council as a method for rating the "greenness"
of home building. - (answer)False
Cost Plus a Fee describes a contractual payment method which requires the owner to pay the contractor
for all of the work that is put in place plus a fee for managing the work. This method distributes risk to
the owner because no maximum prices is identified before work commences. - (answer)True
Carbon neutral is a concept related to sustainability that requires that energy be created on site to offset
the energy that is consumed by the building. - (answer)False
A monolithic slab-on-grade would be used in conditions where a frost line is deeper or the grade
changes as opposed to a stem wall slab-on-grade which is typically used on a very flat site with a shallow
frost line. - (answer)False
VERIFIED QUESTIONS AND CORRECT SOLUTIONS ALREADY GRADED
A+ LATEST UPDATE GUARANTEED PASS!!!
Which project delivery method best fits the description: The designer and builder hold separate
contracts with the owner and a construction manager is utilized earlier in the project to offer
construction knowledge to the designer during the design phase but is not directly responsible for
construction. - (answer)Construction Manager Agency
Which project delivery method best fits the description: The designer, appropriate engineers, and
contractor work together with similar goals and objectives from the very beginning of the project.
Leading a better coordinated and more collaborative project. - (answer)Integrated Project Delivery
Which project delivery method best fits the description: The designer and builder are one entity that is
in charge of the design and construction of the project. There is one contract held between the owner
and this entity. - (answer)Design-Build
Which of the following best fits the following description: Temporary sediment control device often
staked in the ground with metal posts and wired backed fabric. - (answer)Silt Fence
Which of the following best fits the following description: mulch/seed slurry used to cover large areas of
land in a short period of time and stabilize the soil against runoff. - (answer)Hydroseeding
Which of the following best fits the following description: Earthen structure used to allow sediment in
water to settle before the water is discharged downstream. - (answer)Settling Basin/Pond
Which of the following best fits the following description: Environmentally friendly and biodegradable
method of erosion control used for slowing the flow of water and filtering out silt. - (answer)Hay Bales
A three story basement that extends 30' into the ground and is supported by strip footings is considered
a shallow foundation. - (answer)True
Type VB building codes are very restrictive in terms of size of structure because it allows for the use of
almost every material and does not contain requirements for high levels of fire resistance. - (answer)True
, CSM 2030 - FINAL EXAM BRAND NEW ACTUAL EXAM WITH 100%
VERIFIED QUESTIONS AND CORRECT SOLUTIONS ALREADY GRADED
A+ LATEST UPDATE GUARANTEED PASS!!!
The international building code restricts the type of building that can be put on any one parcel of land
based upon its use. - (answer)False
Poorly-graded soils consisting of course aggregate allows for better drainage than well-graded soils. -
(answer)True
Dampproofing is required on a foundation when there is higher levels of hydrostatic pressure. -
(answer)False
Clay is considered an unstable soil when exposed to moisture but it is very cohesive in nature. -
(answer)True
When a building settles equally across the site this is called uniform settlement. - (answer)True
Passivhaus, having its origins as the National Green Building Standard was developed by the National
Association of Home Builders and the International Code Council as a method for rating the "greenness"
of home building. - (answer)False
Cost Plus a Fee describes a contractual payment method which requires the owner to pay the contractor
for all of the work that is put in place plus a fee for managing the work. This method distributes risk to
the owner because no maximum prices is identified before work commences. - (answer)True
Carbon neutral is a concept related to sustainability that requires that energy be created on site to offset
the energy that is consumed by the building. - (answer)False
A monolithic slab-on-grade would be used in conditions where a frost line is deeper or the grade
changes as opposed to a stem wall slab-on-grade which is typically used on a very flat site with a shallow
frost line. - (answer)False