• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 37 pages
Exam (elaborations)

A-5 Excavating, Grading And Oil Surfacing Latest Update Verified Questions & Detailed Explanations Graded A+

Document preview thumbnail
Preview 4 out of 37 pages

A-5 EXCAVATING, GRADING AND OIL SURFACING LATEST UPDATE VERIFIED QUESTIONS & DETAILED EXPLANATIONS GRADED A+

Content preview

A-5 EXCAVATING, GRADING AND
OIL SURFACING LATEST UPDATE
VERIFIED QUESTIONS & DETAILED
EXPLANATIONS GRADED A+
Professional Academic Assistance Services

In road construction the final grading is commonly guided by
stakes at subgrade elevations. What are these stakes called? -
Answer: Blue Tops



What is the definition of a type of soil that can be excavated
with vertical side slopes and remain intact while exposed? -
Answer: Stable Rock



According to OSHA, refueling trucks handling flammable
materials must carry a fire extinguisher rated at not less than: -
Answer: 20-B:C:



Using a builder's level, a cut stake is being set for the excavation
of a footing. The top of the footing will at an elevation of 94.00
feet. A backsite to the benchmark (elevation 102.50 feet) has a
rod reading of 4.70 feet. The rod reading of the mark on the cut
stake is 6.20 feet. The footing is 6 inches thick. The mark on the

,cut stake should read........? - Answer: C 7.50



If a rectangular shaped or other structure has edge
measurements of 56 feet by 90 feet, the diagonal measurement
should be___________ feet if all the corners are square. -
Answer: 106



Refer to the illustration, which number identifies the catch
point? - Answer: 2



On a plan where 1/2" equals 1 foot, a plan distance of 4-1/4"
would have a project distance of _______? - Answer: 8'6"



According to OSHA, ladders (or steps) are required in all
trenches or ditches at _______ feet or more in depth for an
adequate means of exit. - Answer: 4 feet



What is the definition of grade? - Answer: Rise over run



While trenching and excavating, OSHA requires that employees
be protected from excavated materials and other materials
stored near the trench or excavation. These materials must be
at least _________ from the trench or excavation. - Answer: 2

,feet



If a bucket holds 2.5 cubic yards of foliated rock, how much will
it hold if it is heaped up with loamy soil? - Answer: 4 to 6 cubic
yards



The volume change that occurs when soil goes from a
compacted state to an uncompacted state (such as when being
excavated) is called: - Answer: Swell



Best adhesion between asphalt cement and aggregate is
achieved when aggregate is in what state? - Answer: Hot and
dry



What type of retaining wall is designed and built to use only its
own weight and positioning to keep soil back? - Answer: Gravity



What does a standard proctor test determine? - Answer: Soil
density and optimum moisture content of the soil



The maximum lateral distance allowed to any means of egress
from a trench excavation that is 4 feet or more in depth is? -
Answer: 25

, All of the following Soil provisions are considered expansive
except for:



- more than 10% of soil particles pass a #200 sieve

- a plasticity index of 15 or greater

- at least 9% of soil particles are less than 5 micrometers in size

- an expansion index greater than 20 - Answer: At least 9% of
soil particles are less than 5 micrometers in size



What is the correct nozzle angle on a spray bar? - Answer: 15-30
degrees



What is added to hot mixed asphalt to make it more fluid? -
Answer: Asphalt cement or moisture



What is indicated by "J" on the illustration? - Answer: undercut
(over beak)



Refer to the illustration. What is the finished elevation of lot no.
409? - Answer: 152 feet 4 inches

Document information

Uploaded on
September 25, 2026
Number of pages
37
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
YourExamplug
4.1
(74)
Sold
226
Followers
27
Items
18088
Last sold
16 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions