• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 43 pages
Other

Liberty University ENGV 380 Project and Construction Management | All Quizzes 1–9 (in 1 pdf file) Complete Questions & Answers | 100% Answered | Summer 2026/2027.

Document preview thumbnail
Preview 4 out of 43 pages

Complete Liberty University ENGV 380 – Project and Construction Management All Quizzes 1–9, fully answered and updated for Summer 2026/2027. Includes complete quiz questions and answers in a clear, organized format for easy reference. Ideal for students looking for ENGV 380 Quizzes 1–9 questions and answers, Project and Construction Management quizzes, and Liberty University ENGV 380 content. Quiz: Construction Management Functions and Scheduling Techniques: ENGV380: Project and Construction Management (B03) Quiz: Costs and Engineering Estimates: ENGV380: Project and Construction Management (B03) Quiz3 Construction Industry, Management Functions, and Estimates. Quiz4 Costs and Engineering Quiz5 Estimating Building Projects and Construction Contract Administration Quiz6 Machine Power and Equipment Selection Quiz7 Estimates, Construction Contract Administration, Machine Power Quiz8 Building Materials and Construction Methods. Quiz9 : Final: ENGV380: Project and Construction Management (B03)

Content preview

8/31/26, 3:06 PM Quiz: Construction Management Functions and Scheduling Techniques: ENGV380: Project and Construction Management (B03)




Quiz: Construction Management Functions and
Scheduling Techniques
Due Jun 1 at 11:59pm
Points 30
Questions 10
Time Limit 60 Minutes

This quiz is no longer available as the course has been concluded.

Attempt History
Attempt Time Score
LATEST Attempt 1 8 minutes 27 out of 30


() Correct answers are hidden.

Score for this quiz: 27 out of 30
Submitted May 21 at 6:06pm
This attempt took 8 minutes.
Incorrect


Question 1
3/3pts
What American authored the first engineering texts for use in a U.S. school of teaching
engineering?

Dennis Hart Mahan.


The period placed after the answer may have caused it to be marked incorrect, even
though the answer itself was correct.


Question 2
3/ 3pts
What four things were necessary before the first real skyscraper could be constructed?
Your Answer:

Safe elevators, steel framing, fireproofing, and the caisson method of foundation construction.



Question 3
3/3pts

https://canvas.liberty.edu/courses/1026043/quizzes/4769821?module_item_id=105618274 1/4

,8/31/26, 3:06 PM Quiz: Construction Management Functions and Scheduling Techniques: ENGV380: Project and Construction Management (B03)

What are the advantages and disadvantages of Project Labor Agreements (PLAs)? What
is causing their increased use?
Your Answer:

Project Labor Agreements can help owners secure a skilled labor force, reduce the risk of strikes or
labor interruptions, improve coordination among trades, and support timely completion on large
projects. Their disadvantages are that they may reduce open competition, discourage some
nonunion contractors from bidding, and possibly increase labor costs or administrative
requirements. Their increased use is mainly caused by owners’ desire for labor stability, predictable
project delivery, skilled workers, and fewer disruptions on large public construction projects.
Proponents argue PLAs support quality labor and timely completion, while opponents argue they
can be anti-competitive and increase costs.



Question 4
3/3pts
"In what year did Col. Eisenhower participate in the army convoy trip from Washington,
D.C. to San Francisco?"
1919




Question 5
3/3pts
How large is the construction industry?
Your Answer:

The construction industry is the second largest industry in the United States behind health services
and the largest goods/product-producing industry. It employs more than 6 million people.



Question 6
3/3pts
In what year did New York start work on La Guardia Airport?
1937


Incorrect


Question 7
0/3pts
What U.S. canal was the first to receive a federal appropriation for its improvement?
Dismal Swamp Canal.



https://canvas.liberty.edu/courses/1026043/quizzes/4769821?module_item_id=105618274 2/4

,8/31/26, 3:06 PM Quiz: Construction Management Functions and Scheduling Techniques: ENGV380: Project and Construction Management (B03)



Question 8
3/3pts
Describe the essential differences between design-bid-build, design-build, job order
contracting, construction management at risk, and best value procurement. What are the
major advantages and disadvantages of each?
Your Answer:

Design-bid-build is the traditional method where the owner hires the designer first, then bids the
completed design to contractors. Its advantage is clear separation of design and construction and
competitive pricing, but it can take longer and may create disputes between the designer and
contractor. Design-build uses one contract for both design and construction. Its advantages are
faster delivery, better coordination, and single-point responsibility, but the owner may have less
direct control over design details. Job order contracting is used for repeated small projects under a
pre-priced contract; it is fast and efficient for maintenance or repair work, but it is not ideal for large
unique projects. Construction management at risk brings the construction manager in early and
usually includes a guaranteed maximum price; it improves collaboration and cost control, but the
owner must carefully manage scope and price assumptions. Best value procurement selects a
contractor based on price plus qualifications, schedule, experience, and technical approach; it can
produce better overall value, but it is more complex than low-bid selection and requires fair
evaluation criteria.

Design-build uses one contractor not contract


Question 9
3/ 3pts
Why do owners prefer the design-build form of contracts?
Your Answer:

Owners prefer design-build because it gives them one responsible team for both design and
construction. This reduces finger-pointing, improves communication, allows design and
construction to overlap, shortens the schedule, and can provide better cost control earlier in the
project.



Question 10
3/ 3pts
What are the major types of construction contractors?
Your Answer:

The major types are residential, commercial building, heavy civil/highway, and industrial
contractors. Another way to describe them is general contractors, construction managers, and
subcontractors or specialty trade contractors.

Quiz Score: 27 out of 30
https://canvas.liberty.edu/courses/1026043/quizzes/4769821?module_item_id=105618274 3/4

, 8/31/26, 3:06 PM Quiz: Construction Management Functions and Scheduling Techniques: ENGV380: Project and Construction Management (B03)




https://canvas.liberty.edu/courses/1026043/quizzes/4769821?module_item_id=105618274 4/4

Document information

Uploaded on
September 24, 2026
Number of pages
43
Written in
2025/2026
Type
Other
Person
Unknown
$30.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MindCraft
3.9
(53)
Sold
446
Followers
10
Items
2911
Last sold
14 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions