Which term means to schedule a job that starts immediately,
regardless of the due date? - ✔✔✔ Correct Answer > Forward
scheduling
Which type of system is used to identify and manage this type of
problem? - ✔✔✔ Correct Answer > MRP (material requirements
planning)
Which concept takes a total system approach to creating an
efficient operation and combines concepts such as just-in-time
(JIT), total quality management (TQM), and continuous
improvement? - ✔✔✔ Correct Answer > Lean systems
, 2|Page
Which tier-level supplier directly supplies materials or services
to a processing and packaging plant? - ✔✔✔ Correct Answer > Tier
three suppliers
What is the third basic element in the just-in-time (JIT) system if
the first element is total quality management (TQM) and the
second is JIT manufacturing? - ✔✔✔ Correct Answer > Respect for
people
How of just-in-time (JIT) and lean systems add value? - ✔✔✔
Correct Answer > By reducing waste
Why is Kanban significant to the "pull" system? - ✔✔✔ Correct Answer
> It specifies the exact quantity of a product that needs to be
produced
What are two product system differences between the push and
pull process? - ✔✔✔ Correct Answer > Push moves the product
forward in anticipation for demand.
Pull eliminates excess inventory.