Exam (elaborations)

CA Class A General Engineering Contractor Exam Questions and Correct Answers (Verified Answers) Plus Rationale 2027 Q&A| Instant Download Pdf

Document preview thumbnail
Preview 4 out of 60 pages

CA Class A General Engineering Contractor Exam Questions and Correct Answers (Verified Answers) Plus Rationale 2027 Q&A| Instant Download Pdf

Content preview

CA Class A General Engineering Contractor
Exam Questions and Correct Answers (Verified
Answers) Plus Rationale 2027 Q&A| Instant
Download Pdf


1. What is the primary purpose of a site investigation before
beginning a major engineering construction project?

A. To determine the contractor's profit margin
B. To eliminate the need for engineering plans
C. To identify existing site conditions that may affect construction
D. To establish the final payment schedule

Answer: C. To identify existing site conditions that may affect
construction

Rationale: A site investigation provides information about soil,
groundwater, existing utilities, topography, access, environmental
conditions, and other physical characteristics. Understanding these
conditions allows the contractor and design team to plan appropriate
construction methods and reduce unforeseen problems.

, 2. Which instrument is commonly used by surveyors to measure
horizontal and vertical angles accurately?

A. Plate compactor
B. Total station
C. Concrete vibrator
D. Moisture meter

Answer: B. Total station

Rationale: A total station is an electronic surveying instrument that
combines angle measurement with electronic distance measurement.
It is widely used to establish points, elevations, alignments, and
locations during engineering construction.

3. What is the primary function of a benchmark in construction
surveying?

A. To store construction materials
B. To provide a known elevation reference
C. To measure concrete strength
D. To determine equipment fuel consumption

Answer: B. To provide a known elevation reference

Rationale: A benchmark is a fixed reference point with a known
elevation. Surveyors use it to establish or transfer elevations

,throughout a project so that grades, foundations, drainage systems,
roads, and other features are constructed at the required elevations.

4. When preparing a construction schedule, the critical path
identifies activities that:

A. Have the lowest labor cost
B. Can always be delayed without consequences
C. Determine the minimum project completion time
D. Require the largest number of workers

Answer: C. Determine the minimum project completion time

Rationale: The critical path consists of activities that control the
earliest possible completion date of the project. Delaying a critical-
path activity generally delays the project unless corrective action or
schedule recovery measures are implemented.

5. What is the primary purpose of a construction submittal?

A. To replace the contract
B. To provide required technical information for review and approval
C. To establish the contractor's tax rate
D. To eliminate inspections

Answer: B. To provide required technical information for review and
approval

, Rationale: Submittals may include shop drawings, product data,
samples, mix designs, certifications, and other technical information.
They allow the appropriate project parties to verify that proposed
materials and methods comply with project requirements.

6. Which soil property describes the ability of soil to support loads
without excessive deformation or failure?

A. Bearing capacity
B. Permeability
C. Plasticity
D. Moisture content

Answer: A. Bearing capacity

Rationale: Bearing capacity refers to the ability of soil to safely
support applied loads. It is particularly important for foundations,
retaining structures, embankments, and other structures that transfer
loads into the ground.

7. What is the main purpose of soil compaction?

A. To increase voids in the soil
B. To reduce soil density
C. To increase soil density and improve stability
D. To increase the soil's organic content

Document information

Uploaded on
September 23, 2026
Number of pages
60
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$23.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Docsolutions
4.1
(23)
Sold
78
Followers
5
Items
4412
Last sold
5 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions