• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 25 pages
Exam (elaborations)

Pmt 3600V Exam 3 - Advanced Program Management Questions And Answers With Verified Solutions 2026/2027 Update. Just Released

Document preview thumbnail
Preview 3 out of 25 pages

PMT 3600V EXAM 3 - ADVANCED PROGRAM MANAGEMENT QUESTIONS AND ANSWERS WITH VERIFIED SOLUTIONS 2026/2027 UPDATE. JUST RELEASED

Content preview

PMT 3600V EXAM 3 - ADVANCED
PROGRAM MANAGEMENT QUESTIONS
AND ANSWERS WITH VERIFIED
SOLUTIONS 2026/2027 UPDATE. JUST
RELEASED


1. A Program Manager (PM) is evaluating a project with a Budget at Completion (BAC) of

$1,000,000. Currently, the Earned Value (EV) is $400,000, and the Actual Cost (AC) is

$500,000. What is the To Complete Performance Index (TCPI) based on the original BAC?

A. 1.20


B. 0.80


C. 1.00


D. 1.25


Answer: A


Conceptual Explanation: TCPI (BAC) = (BAC - EV) / (BAC - AC). (1,000,000 - 400,000) /

(1,000,000 - 500,000) = 600,,000 = 1.2. This means the program must perform at

120% efficiency to finish on budget.


2. In a Fixed Price Incentive Firm (FPIF) contract, the Point of Total Assumption (PTA) is the

point where:

A. The government assumes all risk for further cost increases.

,B. The contractor assumes all risk for further cost increases and the contract acts like a

Firm Fixed Price contract.


C. The profit is maximized regardless of cost.


D. The ceiling price and target cost are equal.


Answer: B


Conceptual Explanation: The PTA is the point where the cost overrun becomes the sole

responsibility of the contractor because the ceiling price has been reached; effectively, the

share ratio becomes 0/100.


3. Which of the following best describes the purpose of a Configuration Steering Board (CSB)?

A. To manage the technical baseline during the Operations and Support phase.


B. To assign personnel to the Systems Engineering team.


C. To conduct the final Functional Configuration Audit (FCA).


D. To review and potentially approve requirement changes that could impact cost or

schedule.


Answer: D


Conceptual Explanation: CSBs are mandated to prevent ‘scope creep’ by reviewing and

approving changes to requirements that have the potential to significantly increase costs or

delay the schedule.

, 4. Under the Clinger-Cohen Act, which role is responsible for ensuring that information

technology systems are integrated and interoperable?

A. Program Manager (PM)


B. Contracting Officer (KO)


C. Chief Information Officer (CIO)


D. Milestone Decision Authority (MDA)


Answer: C


Conceptual Explanation: The Clinger-Cohen Act established the role of the CIO to provide

strategic leadership for IT management, ensuring systems are integrated, interoperable,

and cost-effective.


5. A program has a Cost Performance Index (CPI) of 0.75 and a Schedule Performance Index

(SPI) of 0.85. What is the most likely status of this program?

A. Ahead of schedule and under budget.


B. Behind schedule and over budget.


C. Behind schedule and under budget.


D. Ahead of schedule and over budget.


Answer: B


Conceptual Explanation: A CPI less than 1.0 indicates a cost overrun (over budget), and

an SPI less than 1.0 indicates the project is behind schedule.

Document information

Uploaded on
September 23, 2026
Number of pages
25
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TheStar
3.7
(140)
Sold
736
Followers
178
Items
28662
Last sold
1 day ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions