• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 23 pages
Exam (elaborations)

Dbia Test Practice Questions And Tested Solutions

Document preview thumbnail
Preview 3 out of 23 pages

DBIA TEST PRACTICE QUESTIONS AND TESTED SOLUTIONS

Content preview

DBIA TEST PRACTICE QUESTIONS AND TESTED
SOLUTIONS

◉ Owners should carefully research and assess current market
conditions as they plan their DB programs, as this will identify
potential risks and opportunities. Among the issues to be researched
and assessed include: _____ actions that could limit or expand
competition; projected labor, material, and equipment _____; _____
learned from similar projects; and _____ of budget and schedule
estimate.
Answer: - procurement


- availability


- lessons


- realism


◉ IMPLEMENTING TECHNIQUE No. 1(A): Owners should
understand the potential _____, _____, and _____ of DB and make an
informed decision as to whether the use of DB will _____ their project.
Answer: - benefits
- limitations

,- attributes
- benefit


◉ What are 3 fundamental concepts that influence the move to
integration?
Answer: - Cost-Influence curve
- benefits of fast tracking
- spearin doctrine


◉ What are the 4 phases of the Cost-Influence Curve?
Answer: - Planning
- Design
- Construction
- Operations


◉ In which project delivery method is the construction team
brought on AFTER design, with open bidding?
Answer: - DBB


◉ In the planning phase, Influence has a _____ impact on the project.
Answer: high

, ◉ In which project delivery method is the construction team
brought on EARLY, facilitating fast-tracking?
Answer: DB


◉ Spearin Doctrine: Owner hiring designers provides contractors
two specific implied warranties: Plans and specs are _____; Plans and
specs are suitable for _____ _____.
Answer: - accurate
- intended purpose


◉ What are the 5 types of project delivery systems?
Answer: - DB
- DBB
- CMAR
- IPD
- Multiple prime contracting


◉ _____ is a linear sequential process.
Answer: DBB


◉ In DBB, the A/E is typically selected on _____ and the GC is typically
selected on _____ _____.
Answer: - qualifications

Document information

Uploaded on
September 22, 2026
Number of pages
23
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GradeGalaxy
4.3
(16)
Sold
194
Followers
5
Items
60840
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions