• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 33 pages
Exam (elaborations)

2012PHM — PHARMACY PRACTICE II EOT FINAL PRACTICE EXAM 100 Questions, Answers & Rationales | 2026/2027

Document preview thumbnail
Preview 4 out of 33 pages

2012PHM — PHARMACY PRACTICE II EOT FINAL PRACTICE EXAM 100 Questions, Answers & Rationales | 2026/2027

Content preview

ENGV 380 FINAL EXAM REVIEW Project
& Construction Management Liberty
University | 2026 Updated 100 Practice
Questions with Answers & Rationales


PART I — CONSTRUCTION MANAGEMENT
FUNDAMENTALS
1. What is the primary purpose of construction project management?

A. Eliminate all project risks
B. Coordinate resources to achieve project objectives
C. Increase the number of subcontractors
D. Reduce the need for planning

Answer: B

Rationale: Construction management coordinates labor, materials, equipment, money, time,
quality, and safety to accomplish project objectives.



2. Which three constraints are traditionally called the project management
"triple constraint"?

A. Safety, labor, and equipment
B. Scope, time, and cost
C. Materials, weather, and labor
D. Quality, equipment, and contracts

Answer: B

Rationale: Scope, time, and cost are the traditional core project constraints. Quality and risk are
also important considerations.

,3. Which party typically provides the financing and initiates a construction
project?

A. Owner
B. Subcontractor
C. Equipment operator
D. Material supplier

Answer: A

Rationale: The owner/client establishes the project need and generally provides or arranges
project financing.



4. The contractor's primary responsibility is to:

A. Develop municipal zoning laws
B. Execute the construction work according to contract requirements
C. Approve building codes
D. Finance every project personally

Answer: B

Rationale: The contractor performs and coordinates construction activities in accordance with
the contract documents.



5. A subcontractor is generally hired by the:

A. Architect's client
B. General contractor
C. Equipment manufacturer
D. Building inspector

Answer: B

Rationale: General contractors commonly subcontract specialized portions of construction.



6. Which professional typically develops architectural design documents?

A. Architect
B. Equipment operator

,C. Survey crew member
D. Labor foreman

Answer: A

Rationale: Architects commonly develop building design documents, although engineering
disciplines develop specialized technical designs.



7. Why is project planning performed before construction?

A. To eliminate the contract
B. To establish how resources and activities will be coordinated
C. To avoid estimating costs
D. To eliminate the need for inspections

Answer: B

Rationale: Planning establishes the sequence, resources, responsibilities, costs, and controls
needed to execute the work.



8. Which is an example of a project resource?

A. Labor
B. Weather forecast
C. Building code
D. Contract dispute

Answer: A

Rationale: Labor is a project resource, along with materials, equipment, money, information,
and time.



9. Construction productivity is generally concerned with:

A. Output relative to resources used
B. Number of contract pages
C. Number of project meetings
D. Building height only

Answer: A

, Rationale: Productivity relates the amount of useful work produced to the resources required to
produce it.



10. A construction manager's role commonly involves:

A. Planning, coordinating, monitoring, and controlling project activities
B. Performing only physical labor
C. Manufacturing all construction materials
D. Eliminating all subcontractors

Answer: A

Rationale: Construction management involves broad coordination and control of project
activities.




PART II — PROJECT DELIVERY
METHODS
11. Which delivery method typically separates design from construction?

A. Design-bid-build
B. Design-build
C. Integrated project delivery
D. Construction management at risk

Answer: A

Rationale: In traditional design-bid-build, design is completed before contractors submit bids for
construction.



12. In design-build, the owner generally contracts with:

A. Separate architect and contractor only
B. A design-build entity responsible for both design and construction
C. Only a material supplier
D. Only a testing laboratory

Answer: B

Document information

Uploaded on
September 22, 2026
Number of pages
33
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$23.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
examgenerater
4.0
(275)
Sold
139
Followers
59
Items
1764
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions