Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 24 pages
Exam (elaborations)

SCM 300 Exam 3 Davilla Exam Questions with Correct Answers (Grade A+)

Document preview thumbnail
Preview 3 out of 24 pages

SCM 300 Exam 3 Davilla Exam Questions with Correct Answers (Grade A+)

Content preview

SCM 300 Exam 3 Davilla Exam Questions with Correct Answers
(Grade A+)

Question 1: Competitive priorities

Answer: 1. cost 2. quality 3. speed/time 4. flexibility


Question 2: Value

Answer: what i get/price


Question 3: Productivity

Answer: what i make/cost


Question 4: SCM key components

Answer: 1. Procurement 2. Operations 3. Logistics


Question 5: Procurement

Answer: Buy it: process of obtaining services, supplies, and equipment in conformance with corporate
regulations


Question 6: Operations

Answer: Make it: makes business processes effective and efficient. They help the organization create high
quality products/ services using the fewest resources


Question 7: Logistics

Answer: Move it: developing the transportation itinerary and finding reliable transportation and storage
partners, to be able to navigate the flow of materials to the final destination


Question 8: Reverse logistics

Answer: reuse of production and materials


Question 9: 1st tier suppliers

Answer: a company's direct supplier. A firm that directly provides goods and/ or services to a company



Page 1

,Question 10: 2nd tier suppliers

Answer: a firm provides goods and/ or services to a company's first-tier supplier


Question 11: Downstream

Answer: direction in which products flow towards an end consumer. Direction is the right. Storage and
consolidation/sorting picking and packing, labeling


Question 12: Upstream

Answer: direction from customers to suppliers. Direction is the left central return center AKA reverse
logistics activities


Question 13: Safety stock

Answer: protects against uncertainty in demand, lead time, supply not intended to be used. cushion,
insurance, etc


Question 14: Pipeline inventory

Answer: Orders that have been placed but not yet received nor paid for by customer Inventory "on its way"
to the customer


Question 15: Vertical integration

Answer: company taking on additional supply classes (Forward and backward)


Question 16: Order less

Answer: if holding cost too high


Question 17: Order more

Answer: If holding cost too low


Question 18: Low inventory pros

Answer: less storage space required (lowering holding cost), lower chance of inv shrinkage, less materials
handling, less money invested in inventory *Cons for High Inventory




Page 2

, Question 19: High inventory pros

Answer: higher levels of customer service (having inventory addresses immediate demand), quantity
discounts possible, fewer orders will be placed, greater security against unexpected demand variability
*Cons for Low Inventory


Question 20: order cost < Carrying cost

Answer: when to use eoq


Question 21: Supplier considerations

Answer: consumer needs, cost quality speed & flex, technological capability, location, information
technology system, ability to innovate, capacity potential, 2nd & 3rd tier suppliers, reliability, and service


Question 22: holding cost = ordering cost

Answer: EOQ formula


Question 23: Bottleneck

Answer: slowest or weakest workstation in assembly line


Question 24: Line flow strategy

Answer: -make items fast and make it over and over. everything goes down a line Demand: Standard Items,
High Volumes, Static Industry Layout: Product Focused/Line Flow Layouts Manufacturing system:
Assembly Lines, Continuous Flow Systems Make-to-stock systems


Question 25: Flexible flow strategy

Answer: every item made is different, work can go in any direction Demand: Customized Items, Low
Volumes, Dynamic Industry Layout: Process Focused/Flexible Flow Layouts Manufacturing system: Job
Shops Make-to-order systems


Question 26: Hybrid strategy

Answer: every item is the same but one aspect is different (ie car color) Demand: Moderation
(Customization, Changes, Industry) Layout: Hybrid Layouts Manufacturing system: Group Technology
(Cellular) Layout Possibly an Assemble-to-order system




Page 3

Document information

Uploaded on
September 22, 2026
Number of pages
24
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
DrJon
3.8
(160)
Sold
593
Followers
188
Items
23563
Last sold
13 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions