• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 31 pages
Exam (elaborations)

MAINTAINING QUALITY, Continous improvement and LEAN six sigma with solution

Document preview thumbnail
Preview 4 out of 31 pages

MAINTAINING QUALITY, Continous improvement and LEAN six sigma with solution

Content preview

D469 TEST 2 WITH CORRECT QUESTIONS AND
ANSWERS.

,
,As part of the contract documents, what are the written documents called
that describe the required materials, requirements for the execution of the
work, and workmanship expected?

a. Construction drawings

b. Contracts

c. Punch lists

d. Specifications

e. Shop drawings - correct ans:Specifications



2. Title blocks on construction-drawing sheets are generally placed along the
left side of the sheet for ease of reading left to right.

T/F - correct ans:False



3. In construction drawings, the most important aspect of lettering is its
______________.

a. capitalization

b. stylization

c. readability

d. height

e. calligraphy - correct ans:Readability



4. The use of modular components in building construction is a common
practice, as many of the components are manufactured in standard sizes,
such as 16-, 24-, and ___________ (40.6-, 60.9-, and _______cm).

a. 48-inch (121.9-cm)

b. 30-inch (76.2-cm)

c. 18-inch (45.7-cm)

d. 15-inch (38.1-cm)

e. 9-inch (22.8-cm) - correct ans:a. 48-inch (121.9-cm)

, 5. Construction drawing legends combine graphic symbols with notes and
are used on what type of drawings?

a. floor plans

b. furniture plans

c. electrical plans

d. lighting plans

e. a and b only

f. c and d only

g. all of the above - correct ans:g. all of the above



6. In a building project, various contractual agreements are needed between
the parties involved in order to detail each party's responsibilities.

a. True

b. False - correct ans:a. True



7. For bidding purposes, specifications are referred to as "closed" or "open".
"Closed" means _____ product can be used on the project other than what is
specified.

a. a replacement

b. a and d only

c. any

d. a substituted

e. no - correct ans:e. no



8. Sometimes a designer will require the client to pay them a "retainer" (a
sum of money) at the beginning of a project. The usual retainer is what
percent of the total fees?

a. 2

Document information

Uploaded on
September 22, 2026
Number of pages
31
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
1
Followers
0
Items
845
Last sold
4 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions