FLORIDA GLASS & GLAZING CONTRACTOR EXAMINATION COMPLETE QUESTIONS AND DETAILED SOLUTIONS LATEST UPDATE THIS YEAR JUST RELEASED

Document preview thumbnail
Preview 4 out of 111 pages

FLORIDA GLASS & GLAZING CONTRACTOR EXAMINATION COMPLETE QUESTIONS AND DETAILED SOLUTIONS LATEST UPDATE THIS YEAR JUST RELEASED

Content preview

FLORIDA GLASS & GLAZING CONTRACTOR
EXAMINATION COMPLETE QUESTIONS AND
DETAILED SOLUTIONS LATEST UPDATE THIS YEAR
JUST RELEASED


1. What is the primary purpose of reviewing contract drawings before preparing
a glass and glazing estimate?

A. To determine the contractor's payroll schedule
B. To identify the required systems, dimensions, materials, and installation
conditions
C. To select employees for the project
D. To establish the owner's financing arrangements

Answer: B

Rationale: Reviewing drawings identifies the glazing systems, dimensions,
materials, details, interfaces, and installation requirements necessary for an
accurate estimate.




2. During a pre-bid review, the glazing contractor discovers that the
architectural drawings conflict with the specifications. What should be done
first?

A. Ignore the discrepancy
B. Choose the less expensive requirement
C. Submit a Request for Information or clarification
D. Automatically follow the drawings

,Answer: C

Rationale: A formal clarification request documents the discrepancy and allows
the design team to establish the intended requirement before pricing or
installation.




3. Which document normally provides detailed requirements concerning
acceptable glass types, coatings, finishes, and performance?

A. Specification
B. Payroll report
C. Daily attendance sheet
D. Equipment inventory

Answer: A

Rationale: Specifications establish detailed material and performance
requirements that supplement the graphical information shown on construction
drawings.




4. A drawing shows a storefront opening measuring 12 feet wide by 8 feet high.
What is its approximate area?

A. 20 square feet
B. 48 square feet
C. 96 square feet
D. 192 square feet

Answer: C

,Rationale: Area is calculated by multiplying width by height; 12 feet multiplied by
8 feet equals 96 square feet.




5. A glazing opening measures 4 feet 6 inches by 6 feet. What is the approximate
area?

A. 18 square feet
B. 27 square feet
C. 30 square feet
D. 36 square feet

Answer: B

Rationale: Convert 4 feet 6 inches to 4.5 feet, then multiply 4.5 by 6 to obtain 27
square feet.




6. Why should a contractor verify field dimensions before ordering custom
fabricated glass?

A. Glass dimensions never affect installation
B. Manufacturing errors can be eliminated by relying solely on drawings
C. Actual conditions may differ from dimensions shown on construction
documents
D. Field measurements are required only after installation

Answer: C

Rationale: Existing construction can vary from drawings, making field verification
essential for obtaining properly sized fabricated glazing materials.

, 7. Which factor is particularly important when selecting exterior glazing
products for a Florida project?

A. Interior paint color
B. Wind and impact requirements applicable to the location
C. Office furniture dimensions
D. Contractor uniform color

Answer: B

Rationale: Florida exterior openings may require products capable of satisfying
applicable wind-pressure and impact-resistance requirements.




8. What is the primary purpose of a shop drawing?

A. To replace the contract entirely
B. To provide detailed fabrication and installation information
C. To document employee attendance
D. To establish tax rates

Answer: B

Rationale: Shop drawings translate design intent into detailed fabrication,
dimensions, connections, components, and installation information.




9. A shop drawing indicates a mullion connection that conflicts with the
structural drawings. What should the contractor do?

Document information

Uploaded on
September 21, 2026
Number of pages
111
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$26.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Charitywairimu
3.9
(306)
Sold
2219
Followers
1507
Items
4263
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions