CESSWI Part 2 Verified Exam Questions and
Answers Latest Updates 2026/2027
Play your way to mastery with fun games
Match Blocks Charms NEW
Terms in this set (223)
Existing Veg, Desc/Purp temp or perm bmp desi to stab soil and remove sups
part from sheet flow runoff.
Existing Veg, Objectives 1) Site Plan and Mang
2) Erosi Cont
3) Sedi Cont
4) Post-Cons Mang
Existing Veg, applic 1) Areas within site where no const activity is occur
2) Areas where local, state and fed govt require
preservation
3) Areas where existing veg can be utilized for eros,
sedi, and storm water quality.
,Existing veg: inspection 1) Accord to regu timetables
2) erosi and damage veg
3) sufficient moisture to ensure growth
4) veg is well stab
5) adequate cover
6) debris and litter
7) invasive exotics
Existing veg: maint 1) only disturb area for construct
2)irrigate dry seasons
3) remove see, and replant if need be
4) replant or rework buffer strips
5) mow and cut perennial weeds
6) remove all trash and debri
7) treat invasive and noxious species
Sched/Sequ, purp/descrip Temp, procedural control that involves creating a
written plan to address neck bmps and sequencing of
construct activities to mitigate the erosive effects of
wind,water and construct activities.
Sched/Sequ: object 1) site planning & management
2) erosion control
3) sediment control
Sched/Sequ: applications 1) develop timetables for certain activities, paretic
during rainy season
, Sched/Sequ: inspect 1) inclusion of sched/seq as a bmp in the plan
2) ached site activities mirroring ached activites.
Sched/Sequ: maintanence 1) modify ached of active when changes are
warranted
2) modify ached of active prior to rainy season to
reflect updated bmp info
Hydroseed: Des& purp Temp or perm bmp designed to reduce erosion and
runoff by applying mix of seed, fert and stabilizing
emulsion.
Hydroseed: object 1) erosion control
2) good housekeeping/ materials management
3) post construct management
Hydroseed: targeted pollut 1) sediment
2) nutrients
3) metals
4) ph
Hydroseed: imp consid 1) need adequate moisture
2) additional mulch may be added
3) pretreatment where cover is not met
4) apply from multi angles to avoid shadowing
Answers Latest Updates 2026/2027
Play your way to mastery with fun games
Match Blocks Charms NEW
Terms in this set (223)
Existing Veg, Desc/Purp temp or perm bmp desi to stab soil and remove sups
part from sheet flow runoff.
Existing Veg, Objectives 1) Site Plan and Mang
2) Erosi Cont
3) Sedi Cont
4) Post-Cons Mang
Existing Veg, applic 1) Areas within site where no const activity is occur
2) Areas where local, state and fed govt require
preservation
3) Areas where existing veg can be utilized for eros,
sedi, and storm water quality.
,Existing veg: inspection 1) Accord to regu timetables
2) erosi and damage veg
3) sufficient moisture to ensure growth
4) veg is well stab
5) adequate cover
6) debris and litter
7) invasive exotics
Existing veg: maint 1) only disturb area for construct
2)irrigate dry seasons
3) remove see, and replant if need be
4) replant or rework buffer strips
5) mow and cut perennial weeds
6) remove all trash and debri
7) treat invasive and noxious species
Sched/Sequ, purp/descrip Temp, procedural control that involves creating a
written plan to address neck bmps and sequencing of
construct activities to mitigate the erosive effects of
wind,water and construct activities.
Sched/Sequ: object 1) site planning & management
2) erosion control
3) sediment control
Sched/Sequ: applications 1) develop timetables for certain activities, paretic
during rainy season
, Sched/Sequ: inspect 1) inclusion of sched/seq as a bmp in the plan
2) ached site activities mirroring ached activites.
Sched/Sequ: maintanence 1) modify ached of active when changes are
warranted
2) modify ached of active prior to rainy season to
reflect updated bmp info
Hydroseed: Des& purp Temp or perm bmp designed to reduce erosion and
runoff by applying mix of seed, fert and stabilizing
emulsion.
Hydroseed: object 1) erosion control
2) good housekeeping/ materials management
3) post construct management
Hydroseed: targeted pollut 1) sediment
2) nutrients
3) metals
4) ph
Hydroseed: imp consid 1) need adequate moisture
2) additional mulch may be added
3) pretreatment where cover is not met
4) apply from multi angles to avoid shadowing