, Who needs insurance on a construction site? D) Contractor and Architect
A) Owner only
B) Contractor only
C) Architect only
D) Contractor and Architect
What are the three sections of specifications? B) General, Product, Execution
A) Design, Build, Finish
B) General, Product, Execution
C) Intro, Body, Summary
D) Structural, Mechanical, Electrical
What does the General section of specifications cover? C) Submittals and processes
A) Materials only
B) Pricing details
C) Submittals and processes
D) Structural loads
When specifying a product, which is the best choice for B) Manufacturer
product information?
A) Architect drawings
B) Manufacturer
C) Owner documents
D) Building code
What class of budget is used in schematic design? D!
A) A
B) B
C) C
D) D
Which schematic design activity is NOT included? D) Detailed drawings
A) Meeting with client, preparing sketches
B) Initial cost estimate
C) Preliminary code analysis
D) Detailed drawings
What is the main focus of Design-Bid-Build? C) Price selection of contractor
A) Speed
B) Collaboration
C) Price selection of contractor
D) Sustainability
What is fast tracking? B) Tendering while designing
A) Delaying construction
B) Tendering while designing
C) Skipping permits
D) Reducing costs only
What are the two mechanisms of change? B) Addendum & Change Order
A) Revision & Update
B) Addendum & Change Order
C) Proposal & Contract
D) Sketch & Drawing
What is a Change Order used for? D) Before drawings
A) Before tender
B) During design
C) After contract is signed
D) Before drawings
What is CCDC 3 used for? B) Renovations (cost-plus)
A) New builds
B) Renovations (cost-plus)
C) Design-build
D) Project management