What is the Single Point of Responsibility Risk? - Answers -one of the main concerns for
practitioners using DB
What does EPC stand for? - Answers -Engineer - Procure - Construct
_____ is a delivery system that is for ALL practical purposes DB - Answers -EPC
EPC is a term used by _____ and _____ generation sectors. - Answers -- industrial
- power
In EPC, systems and performance testing are central to _____. - Answers -scope
The EPC contractor will typically perform engineering with its _____ _____. - Answers -in-house
staff
1|Page
,In EPC, the Owner has need for _____ _____ of responsibility. - Answers -Single Point
In EPC, contracts include plant and process _____ guarantees. - Answers -performance
What 2 main things do EPC contract terms include? - Answers -- liquidated damages
- limitations of liability
"Owner has the ability to schedule and coordinate the work" best describes what delivery
method? - Answers -Multiple Prime Contracting
In Multiple Prime Contracting, the Owner contracts with multiple _____ _____. - Answers -trade
contractors.
What does the Multi-party agreement essentially mean? - Answers -all parties are equal
What contract approach does IPD tend to use? - Answers -Target Price
What procurement method is typically used in IPD? - Answers -QBS
2|Page
,What is the key to IPD? - Answers -Owner's ability to accept risk
P3 is typically used in what delivery system? - Answers -DB
The 2 main responsibilities of the owner under ALL delivery systems: Executing ______; and
Executing actual _____ _____. - Answers -- procurement
- project delivery
Owner's often retain ___ _____ assistance. - Answers -3rd party
What is one characteristic of the scope in 3rd party assistance? - Answers -The scope of services
varies widely
Using a 3rd party professional does NOT constitute a new _____ _____. - Answers -delivery
system
Delivery systems alone, do not predict _____ - Answers -success
3|Page
, Owners drive project success by strategically selecting strategies that promote team _____ and
group _____. - Answers -- integration
- cohesion
What are 3 strategies to maximize integration and group cohesion? - Answers -- open-book in
cost
- early involvement in design process
- qualification based selection
In DB, the majority of responsibility for completeness, accuracy, and integration of design and
construction processes is transferred to the _____ - Answers -Design-Builder.
DB is a mindset defined by the _____ of everyone involved in the project. - Answers -attitude
Success in DB requires the team to think and act as a _____ _____. - Answers -single entity
_____ ______ was not a contractor, architect, or engineer; but the embodiment of all 3. -
Answers -Master-Builder