COSC 275 EXAM 1 PALMER EXAM QUESTIONS AND
ANSWERS


Estimating - Answers - The process of determining the anticipated cost of materials,
labor, and equipment of a proposed project.

Take-Off - Answers - The process in which detailed lists are compiled, based on
drawings and specifications, of all the material and equipment necessary to construct a
project. The cost estimator uses this list to calculate how much it will cost to build the
project.

Quantities - Answers - Measured amounts of construction items expressed in their
customary units.

Quantification - Answers - In estimating an activity to translate project scope information
into resource quantities suitable for costing. In the engineering and construction
industry, a takeoff is a specific type of quantification that is a measurement and listing of
quantities of materials from drawings.

Quantity Survey - Answers - A detailed analysis of material and equipment required to
construct a project.

Area - Answers - A measurement of a given planar region or of the surface of a solid

Area Method - Answers - A construction cost estimating system employing unit square
foot costs multiplied by the adjusted gross floor area of a building.

Length - Answers - The longest dimension of an object

Linear Measurement - Answers - A unit or system of units for measuring length: 12" =
1', 3' = 1 yard, 1 yard = 0.9144 meters, 1 mile = 5,280 feet.

Dimension - Answers - A distance between two points, lines, or planes.

Specifications (SPECS) - Answers - Documents that define the qualitative requirements
for products, materials, and workmanship upon which the contract for construction is
based

Drawings - Answers - Graphic illustrations depicting the dimensions, design, and
location of a project. Generally including plans, elevations, details, diagrams, schedules,
and sections.

, Addendums - Answers - A document describing an addition, change, correction, or
modification to contract documents. Issued by the design professional during the
bidding period or prior to the award of contract, and is the primary method of informing
bidders of modifications to the work during the bidding process

Amendment - Answers - A modification of the contract by a subsequent agreement.
This does NOT change the entire existing contract but does alter the terms of the
affected provisions or requirements

Grade - Answers - The surface level of the ground

Level - Answers - A term used to describe any horizontal surface that has all points at
the same elevation and thus does not tilt or slope

Site - Answers - The location of the project geographically, usually defined by legal
boundaries

Elevation - Answers - A vertical distance relative to a reference point

Cut and Fill - Answers - An operation commonly used in road building and other rock
and earthmoving operations in which the material excavated and removed from one
location is used as fill material at another location.

Fill - Answers - The soil or other material used to raise the grade of a site area.

Foundation - Answers - The entire masonry substructure below the first floor or frame of
a building, including the footing upon which the building rests.

Grade Beam - Answers - A horizontal end supported (as opposed to ground supported)
load bearing foundation member that supports an exterior wall of a superstructure

Width - Answers - The measurement or extent of something from side to side.

Footing - Answers - That portion of the foundation of a structure which spreads and
transmits loads directly to the soil

Reinforced Concrete - Answers - Concrete containing adequate reinforcement,
prestressed or not prestressed, and designed on the assumption that the two materials
(steel and concrete) act together in resisting forces.

Reinforcing Bar - Answers - A steel bar, usually with manufactured deformations, used
in concrete and masonry construction to provide additional strength.

Footing Beam - Answers - A reinforced concrete beam connecting pile caps or spread
footings to distribute horizontal loads caused by eccentric loading.

Document information

Uploaded on
September 19, 2026
Number of pages
6
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Greaterheights
4.0
(223)
Sold
1169
Followers
882
Items
20690
Last sold
16 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions