Once a permit is issued, the inspector should review _____ to determine if the conditions of the
initial permit are still being met. ✔Correct Answer-current activity
What kind of permit does open burning require? ✔Correct Answer-Operational
_____ is always a goal in the complaint process. ✔Correct Answer-Voluntary compliance
Which type of building and fire code or standard classification is more flexible? ✔Correct
Answer-Performance-based code/standard
In most jurisdictions fire and life safety inspectors acting alone have _____ authority to approve
requests for modification of code requirements ✔Correct Answer-little
Which consensus standards committee develops and publishes the majority of the standards
concerning fire protection, electrical systems, and life-safety systems used in the U.S. and
Canada ✔Correct Answer-National Fire Protection Association® (NFPA®)
Facilities required to meet multiple codes may be subject to _____ code requirements.
✔Correct Answer-more restrictive
Permits are issued to ensure that _____ are not allowed to develop without approval of the AHJ
✔Correct Answer-hazardous situations
Complaints that involve a _____ require immediate action ✔Correct Answer-serious life-
safety threat
FI1:CH2 Which Canadian entity represents Canada's interests in standards-related matters in
foreign and international forums? ✔Correct Answer-Standards Council of Canada (SCC)
What is a cause for concern when a Board approves a variance? ✔Correct Answer-Other
applicants may expect to receive similar treatment.
Any additions or alterations to existing structures will be regulated by the _____ code.
✔Correct Answer-current
Complaints that do not require immediate attention can be ✔Correct Answer-routinely
assigned to inspection staff
Answers |Guaranteed to Pass
Once a permit is issued, the inspector should review _____ to determine if the conditions of the
initial permit are still being met. ✔Correct Answer-current activity
What kind of permit does open burning require? ✔Correct Answer-Operational
_____ is always a goal in the complaint process. ✔Correct Answer-Voluntary compliance
Which type of building and fire code or standard classification is more flexible? ✔Correct
Answer-Performance-based code/standard
In most jurisdictions fire and life safety inspectors acting alone have _____ authority to approve
requests for modification of code requirements ✔Correct Answer-little
Which consensus standards committee develops and publishes the majority of the standards
concerning fire protection, electrical systems, and life-safety systems used in the U.S. and
Canada ✔Correct Answer-National Fire Protection Association® (NFPA®)
Facilities required to meet multiple codes may be subject to _____ code requirements.
✔Correct Answer-more restrictive
Permits are issued to ensure that _____ are not allowed to develop without approval of the AHJ
✔Correct Answer-hazardous situations
Complaints that involve a _____ require immediate action ✔Correct Answer-serious life-
safety threat
FI1:CH2 Which Canadian entity represents Canada's interests in standards-related matters in
foreign and international forums? ✔Correct Answer-Standards Council of Canada (SCC)
What is a cause for concern when a Board approves a variance? ✔Correct Answer-Other
applicants may expect to receive similar treatment.
Any additions or alterations to existing structures will be regulated by the _____ code.
✔Correct Answer-current
Complaints that do not require immediate attention can be ✔Correct Answer-routinely
assigned to inspection staff