Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 77 pages
Exam (elaborations)

UST FULLY SOLVED TEST PAPER GRADED A+

Document preview thumbnail
Preview 4 out of 77 pages

UST FULLY SOLVED TEST PAPER GRADED A+

Content preview

UST FULLY SOLVED TEST PAPER GRADED A+

◉ If a UST system is utilizing an overfill alarm, the alarm must be
triggered to alert the transfer operator when the tank is no more
than ___________ full


a.) 85%
b.) 95%
c.) 90%
d.) 80%.
Answer: c.) 90%


CCR Title 23, Sec 2635(b)(2)(A)


◉ A service technician has performed calibration and maintenance
on an ATG probe; this maintenance record must be kept on file for
______________.


a.) 6.5 years
b.) 3 years
c.) 5 years
d.) Life of the UST system.

,Answer: c.) 5 years


CCR Title 23, Sec 2712(b)


◉ An automatic tank gauge is utilized for leak detection of the
______________.


a.) Tank
b.) Tank and Piping
c.) Piping
d.) Interstitial space.
Answer: a.) Tank


CCR Title 23, Sec 2643(b)(1)


◉ After completion of enhanced leak detection (ELD) test, the ELD
test results must be submitted to the _________________.


a.) The local agency
b.) The SWRCB
c.) Owner of the UST system
d.) To both the SWRCB and the local agency.

,Answer: d.) To both the SWRCB and the local agency


CCR Title 23, Sec 2644.1(a)(5)


◉ Which agency approves a site-specific variance which allows for
an alternative method of construction or monitoring:


a.) The Regional Water Quality Board
b.) The State Water Resources Control Board
c.) The Department of Toxic Substance Control
d.) The local agency.
Answer: a.) The Regional Water Quality Board


CCR Title 23, Sec 2681(a)


◉ A permit to operate a UST system must have all of the following
listed on the permit, EXCEPT:


a.) The state UST identification number(s)
b.) Name of the tank manufacturer and tank capacity
c.) Permit expiration date
d.) Monitoring requirements.

, Answer: b.) Name of the tank manufacturer and tank capacity


CCR Title 23, Sec 2712(c)


◉ All underground pressurized product piping shall have an
automatic line leak detector capable of detecting a 3-gallon per hour
leak rate installed by______________.


a.) July 1, 2003
b.) November 9, 2004
c.) July 1, 2004
d.) July 1, 1987.
Answer: b.) November 9, 2004


CCR Title 23, Sec 2636(f)(3)


◉ A temporary closure is appropriate for which of the following:


a.) The UST system is empty and will be removed from service
indefinitely
b.) The UST system has ceased to store hazardous materials but will
be used within the next 12 consecutive months

Document information

Uploaded on
September 19, 2026
Number of pages
77
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$17.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TopGradeInsider
4.2
(13)
Sold
171
Followers
2
Items
56690
Last sold
18 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions