Question 1. Which of the following best defines the core principle of design-build
project delivery?
A. The owner contracts separately with a designer and a constructor who are required to
work together.
B. A single entity holds a single contract with the owner for both the design and
construction of a project.
C. The designer is hired by the construction manager to produce the construction
documents.
D. The owner manages separate contracts for design and construction with a
guaranteed maximum price.
Correct Answer: B
Rationale: The fundamental principle of design-build is the integration of design and
construction services under a single contract with the owner, creating a single point of
responsibility. This is the hallmark of the delivery method. Option A describes a
traditional design-bid-build or multi-prime approach. Option C describes a construction
management at-risk scenario. Option D describes a construction management multi-
prime approach. Understanding this core definition is essential for all exam preparation
and forms the basis for the DBIA certification.
,Question 2. In a design-build project, what is the primary role of the owner during the
proposal phase?
A. To provide a complete set of construction documents for pricing.
B. To manage the subcontractor bidding process.
C. To develop the Request for Proposals (RFP) and clearly define the project scope and
performance criteria.
D. To assume all liability for design errors discovered after construction begins.
Correct Answer: C
Rationale: The owner's primary role is to articulate their needs through a well-crafted
RFP, which includes performance criteria and scope requirements. This allows the
design-build team to propose the best solution. Option A is incorrect because in design-
build, the design team is part of the contractor's team, so the owner does not provide
the construction documents for pricing. Option B is the contractor's responsibility.
Option D is a risk the owner tries to mitigate through the contract, not a primary role.
Question 3. Which of the following is considered a critical factor in achieving successful
design-build project outcomes?
A. Minimal interaction between the design and construction teams during the design
phase.
B. A highly prescriptive and detailed set of owner requirements.
C. A culture of collaboration and open communication among all project stakeholders.
D. The use of the lowest-cost selection criteria as the sole determinant for award.
Correct Answer: C
Rationale: Design-build thrives on the integration of the design and construction
teams, which necessitates a strong collaborative culture. This leads to innovation,
,efficiency, and reduced conflict. Option A is contrary to the core principle of integration.
Option B can stifle innovation, as the designer-builder's expertise is best used to meet
performance criteria. Option D is discouraged; the best-value selection process is a
hallmark of quality design-build.
Question 4. The DBIA's "Design-Build Done Right" philosophy is based on which
fundamental principle?
A. The owner must retain a separate engineer to oversee the design-builder.
B. The design-builder is solely responsible for all project risk without exception.
C. The owner, design-builder, and other stakeholders work together in an integrated,
collaborative process.
D. Design-build is only suitable for large, complex public works projects.
Correct Answer: C
Rationale: "Design-Build Done Right" emphasizes the collaborative, integrated team
approach. It is a philosophy that applies to projects of all sizes and types. Option A is
incorrect; this creates an adversarial relationship. Option B is incorrect because risk is
shared and managed contractually. Option D is a common misconception, as design-
build is used across many sectors.
Question 5. Which project delivery method creates the greatest potential for cost
savings through value engineering during the design phase?
A. Design-Bid-Build
B. Design-Build
, C. Construction Manager at Risk
D. Multiple Prime Contracting
Correct Answer: B
Rationale: Design-build allows for the greatest potential for cost savings through value
engineering because the designer and builder are part of the same team from the
outset. This integration allows for early and continuous input from the construction
team on design decisions, optimizing cost, schedule, and constructability. In Design-Bid-
Build, value engineering typically occurs after the design is complete, limiting its
effectiveness.
Question 6. The DBIA certification exam consists of approximately how many questions
and what is the required passing score?
A. 50 questions, 65% passing score
B. 100 questions, 72% passing score
C. 150 questions, 75% passing score
D. 200 questions, 80% passing score
Correct Answer: B
Rationale: According to the DBIA, the certification exam consists of 100 questions, and
the passing score is 72% or above. The exam is approximately 2 hours long and
delivered through Prometric testing centers nationwide.
Question 7. According to the DBIA exam blueprint, which topic covers the largest
percentage of the exam?