1. What is "cost engineering" in construction?
A) The practice of managing project costs through estimating, budgeting, and cost
control
B) The practice of designing buildings
C) The practice of hiring workers
D) The practice of buying materials
, Correct Answer: A
Rationale: Cost engineering manages project costs through estimating, budgeting,
and cost control.
2. What is the primary purpose of a cost estimate?
A) To determine the aesthetic value of a project
B) To predict the cost of completing a project
C) To schedule worker vacations
D) To design the building
Correct Answer: B
Rationale: A cost estimate predicts the cost of labor, materials, equipment, and
overhead required to complete a project.
3. What is "life-cycle cost" in construction?
A) The total cost of a project over its entire life, including design, construction,
operation, maintenance, and disposal
B) The initial construction cost only
C) The cost of materials only
D) The cost of labor only
Correct Answer: A
Rationale: Life-cycle cost includes all costs over the project's life: design,
construction, operation, maintenance, and disposal.
4. What is "initial cost" in construction?
A) The total cost of a project over its entire life
B) The cost to design and construct the project
C) The cost of operation and maintenance
D) The cost of disposal
Questions & Answers | Liberty University |
2026 Updated
ENGV 380 Quiz 4 – Costs and Engineering
Questions & Answers | Liberty University | 2026 Updated
Quiz Instructions:
• Total Questions: 30
• Time Allowed: 45 minutes
• Format: Multiple choice and true/false
• Passing Score: 100% (30/30 correct)
• )
SECTION A: MULTIPLE CHOICE
1. What is "cost engineering" in construction?
A) The practice of managing project costs through estimating, budgeting, and cost
control
B) The practice of designing buildings
C) The practice of hiring workers
D) The practice of buying materials
, Correct Answer: A
Rationale: Cost engineering manages project costs through estimating, budgeting,
and cost control.
2. What is the primary purpose of a cost estimate?
A) To determine the aesthetic value of a project
B) To predict the cost of completing a project
C) To schedule worker vacations
D) To design the building
Correct Answer: B
Rationale: A cost estimate predicts the cost of labor, materials, equipment, and
overhead required to complete a project.
3. What is "life-cycle cost" in construction?
A) The total cost of a project over its entire life, including design, construction,
operation, maintenance, and disposal
B) The initial construction cost only
C) The cost of materials only
D) The cost of labor only
Correct Answer: A
Rationale: Life-cycle cost includes all costs over the project's life: design,
construction, operation, maintenance, and disposal.
4. What is "initial cost" in construction?
A) The total cost of a project over its entire life
B) The cost to design and construct the project
C) The cost of operation and maintenance
D) The cost of disposal