• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 25 pages
Exam (elaborations)

Nyc Health + Hospitals (Nyc H+H) Electrician Competency Exam Questions And Verified Answers

Document preview thumbnail
Preview 3 out of 25 pages

NYC HEALTH + HOSPITALS (NYC H+H) ELECTRICIAN COMPETENCY EXAM QUESTIONS AND VERIFIED ANSWERS

Content preview

NYC HEALTH + HOSPITALS (NYC H+H)
ELECTRICIAN COMPETENCY EXAM
QUESTIONS AND VERIFIED ANSWERS


1. According to the NYC Electrical Code and NEC Article 517, the ‘Life Safety Branch’ and

‘Critical Branch’ must be kept entirely independent of all other wiring and equipment. What

is the maximum time allowed for the generator to restore power to these branches?

A. 30 seconds


B. 10 seconds


C. 60 seconds


D. 5 seconds


Answer: B


Conceptual Explanation: In healthcare facilities, the Essential Electrical System (EES)

must be capable of supplying power to the Life Safety and Critical branches within 10

seconds of power loss.


2. In a patient care space, what is the required rating for the redundant grounding path

provided by the metal raceway system or cable armor?

A. It must be at least 2 AWG larger than the phase conductors.


B. It must be a bare aluminum conductor.

,C. The raceway itself is sufficient without a separate conductor.


D. It must be an insulated copper equipment grounding conductor.


Answer: D


Conceptual Explanation: NEC 517.13 requires two methods for grounding: the metal

raceway/armor itself and an insulated copper equipment grounding conductor installed in

the raceway.


3. Which color is used to identify a ‘Hospital Grade’ receptacle?

A. A red triangle on the face


B. A green dot on the face


C. A green triangle on the face


D. An orange circle on the face


Answer: B


Conceptual Explanation: Hospital grade receptacles are identified by a green dot. An

orange triangle indicates an isolated ground receptacle.


4. What is the maximum allowed leakage current for an Isolated Power System (IPS) Line

Isolation Monitor (LIM) before it must trigger an audible and visual alarm?

A. 5 mA


B. 2 mA


C. 10 mA

, D. 20 mA


Answer: A


Conceptual Explanation: The LIM is designed to alarm when the total hazard current

(leakage and capacitive) reaches 5 mA, indicating a loss of isolation from ground.


5. Under NYC Amendments, which of the following wiring methods is generally prohibited for

use in ‘Patient Care Spaces’ of a hospital?

A. Type AC cable (specifically HCF type)


B. Rigid Metal Conduit (RMC)


C. Type NM cable (Romex)


D. Electrical Metallic Tubing (EMT)


Answer: C


Conceptual Explanation: Non-metallic sheathed cable (Type NM) is not permitted in

healthcare facilities or most commercial buildings in NYC due to strict fire and safety codes.


6. A 3-phase, 480V motor has a nameplate Full Load Amps (FLA) of 50A. According to the NEC,

what is the minimum ampacity required for the branch circuit conductors?

A. 50A


B. 62.5A


C. 75A


D. 100A

Document information

Uploaded on
September 16, 2026
Number of pages
25
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Fyndlay
3.7
(78)
Sold
437
Followers
82
Items
21793
Last sold
2 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions