• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

CM 4211 Module 5 Quiz Questions with Correct Answers (Grade A+)

Document preview thumbnail
Preview 2 out of 11 pages

CM 4211 Module 5 Quiz Questions with Correct Answers (Grade A+)

Content preview

CM 4211 Module 5 Quiz Questions with Correct Answers (Grade A+)

Question 1: lecture 19

Answer: lecture 19

Question 2: Impact costs are costs in addition to proximate costs related to (1) time and (2) efficiency?

Answer: true

Question 3: In a federal contract, it is the contracting officer who has full authority?

Answer: true

Question 4: Loss-of-efficiency costs have nothing to do with the disruption to work that often occurs
with changes to the work?

Answer: false

Question 5: Cost and time adjustments are spelled out in the federal contract changes clause?

Answer: false

Question 6: A constructive change is a change not acknowledged as such by the owner, whose position
is that the request by the owner is within the scope of work?

Answer: true

Question 7: Verbal change directives or orders are never paid if the contract provides that changes
must be in writing?

Answer: false

Question 8: If a contractor is directed to change the work, the contractor should promptly request a
written and signed change directive?

Answer: true

Question 9: A force account method for paying for change work requires agreement at the end of the
day on the change work done that day?

Answer: true




Page 1

, Question 10: Forward pricing a change means that there is an agreement by the contractor and owner
on the adjustments after the change work is done?

Answer: false

Question 11: The general scope of the work depends on the size of the project, the type of construction
work, and the intended purpose contemplated when the contract was signed?

Answer: true

Question 12: Basically, anything that causes the contract to be modified is a change?

Answer: true

Question 13: A changes provision is an exculpatory clause?

Answer: false

Question 14: If a contract had no changes clause, contractors would likely increase their bid amounts?

Answer: true

Question 15: The federal contract changes clause provides that the government may make changes
without notifying the surety?

Answer: true

Question 16: A cardinal change is one whose size is such that it is clearly within the general scope of the
contract?

Answer: false

Question 17: A two-part change provision means that measureable costs will be paid as incurred, with
final adjustments, such as profit and overhead, paid later?

Answer: true

Question 18: Payment for change work is implied?

Answer: false

Question 19: An AIA change order does not require agreement as to adjustments?

Answer: false




Page 2

Document information

Uploaded on
September 16, 2026
Number of pages
11
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
DrJon
3.8
(159)
Sold
594
Followers
188
Items
23698
Last sold
2 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions