What must assembly in disassembly be directed by? -ANSWER-
Competent and qualified persons who have a knowledge and
understanding of the procedures to be followed.
As a general or when assembling lattice, boom shorter sections should
be where? -ANSWER-Towards the heel sections and longer sections
towards the boom point. Always double check with the manufacturers
instructions.
How must pins on a lattice or jib be inserted? -ANSWER-In a way that
they can be removed from outside the boom or jib.
Why is blocking used on a crane? -ANSWER-To reduce ground pressure
Required clearance for operations near up to 50kv -ANSWER-10 ft
Required clearance of operation near over 50 KV to 200 KV -ANSWER-
15ft
, Required clearance of operations near 200 to 350 KV -ANSWER-20 feet
Required clearance for operations near 350 to 500 KV -ANSWER-25 feet
Require clearance for operation over 500 to 750 KV -ANSWER-35 feet
Required clearance for operation near 750 to 1000 KV -ANSWER-45 feet
OSHA requires that a blank foot minimum clearance be maintained
when voltage up to 350 KV is unknown -ANSWER-20 feet
If the voltage is over 350 KV and unknown, then a minimum blank feet
must be maintained -ANSWER-50ft
Polypropylene material is? -ANSWER-Non conductive
Required clearances for driving under power lines up to .75Kv -
ANSWER-4ft
Required clearance for driving near powerlines from .75 to 50kv -
ANSWER-6ft