• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

Wmgt 322 Exam Study Guide 2026/2027 Accurate Questions With Correct Detailed Solutions || 100% Guaranteed Pass Newest Version

Document preview thumbnail
Preview 2 out of 11 pages

WMGT 322 EXAM STUDY GUIDE 2026/2027 ACCURATE QUESTIONS WITH CORRECT DETAILED SOLUTIONS || 100% GUARANTEED PASS NEWEST VERSION 1. (From the Initial Stages of Project Development) Which of the following could be considered stakeholders for a Civil Engineer project? Select ALL that apply. - ANSWER Contracting Officer Facility User Communications Squadron Representative Airfield Manager 2. (From the Initial Stages of Project Development) Which of the following documents could be considered part of the project record? Select ALL that apply. - ANSWER Independent Government Estimate Quality Control Plan Contractor Submittals 3. (From the Initial Stages of Project Development) A SABER contractor submits a project invoice to the government that includes rental of a 25K Forklift. The construction inspector for this project clearly recalls that the only forklift used on the jobsite was a smaller 5K forklift, which costs significantly less money to rent. Which document in the project record could be used to dispute this claim? - ANSWER AF Form 1477 Daily Construction Inspection Report 4. (From the Programming Fundamentals Lesson) You are working on a project and determine a change order is needed because the beams were too small to handle the roof load. However, this would exceed the approval authority for this Construction project. What is a viable option for the project team? - ANSWER Resubmit the project to obtain appropriate approval even if work must stop while the approval is obtained. 5. (From the Programming Fundamentals Lesson) If a project modifies an existing facility to make it compliant with current codes and regulations, it is likely a(n) _______ project. - ANSWER Repair 6. (From the Programming Fundamentals Lesson) Match the class of cost estimate with its definition and use (not all options will have a match). - ANSWER Class 1: Unit Price Used to negotiate and compare bids with Contractors. 7. Class 3: Parametric Used for budgeting and making the official Programmed Amount. 8. Class 5: Square Foot Used for long range planning when the scope is still poorly defined. 9. (From the Project Management Plan Lesson) MSgt Jones is an extremely competent SNCO that has years of experience working on high voltage power projects. You have recently been appointed project manager for a new power line installation on a remote part of your base. Gaining MSgt Jones onto your project team would be an example of which type of risk? - ANSWER Opportunity 10. 75% rule - ANSWER A guideline used in project management to ensure that 75% of a project's funding is secured before moving forward. 11. APF/NAF - ANSWER Appropriated Funds (APF) and Non Appropriated Funds (NAF) are types of funding sources for projects. 12. Basic programming thresholds - ANSWER The minimum requirements or standards that must be met during the programming phase of a project. 13. Project Lifecycle - ANSWER The natural phases of any project, including Planning & Programming, Design & Contracting, Construction, and Closeout. 14. Planning & Programming - ANSWER The phase where requirements are identified, scope is developed, and advocacy for authority and resources occurs. 15. Design & Contracting - ANSWER The phase where scope is used to develop design and prepare documents for construction. 16. Construction - ANSWER The phase involving inspections, quality assurance, safety, and monitoring progress. 17. Closeout - ANSWER The phase where final inspections are conducted, work is finalized, as-builts and O&M manuals are collected, and SMS is updated. 18. Project Planning - ANSWER The strategy and analysis which results in a built infrastructure requirement, leading to preferred project alternatives for effective mission support at the lowest life-cycle cost. 19. Programming - ANSWER The process of documenting requirements and acquiring both the authority and the resources necessary to accomplish planned work.

Content preview

WMGT 322 EXAM STUDY GUIDE
2026/2027 ACCURATE QUESTIONS
WITH CORRECT DETAILED
SOLUTIONS ||
100% GUARANTEED PASS
<NEWEST VERSION>


1. (From the Initial Stages of Project Development) Which of the following
could be considered stakeholders for a Civil Engineer project? Select ALL
that apply. - ANSWER ✔ Contracting Officer
Facility User
Communications Squadron Representative
Airfield Manager

2. (From the Initial Stages of Project Development) Which of the following
documents could be considered part of the project record? Select ALL that
apply. - ANSWER ✔ Independent Government Estimate
Quality Control Plan
Contractor Submittals

3. (From the Initial Stages of Project Development) A SABER contractor
submits a project invoice to the government that includes rental of a 25K
Forklift. The construction inspector for this project clearly recalls that the
only forklift used on the jobsite was a smaller 5K forklift, which costs
significantly less money to rent. Which document in the project record could
be used to dispute this claim? - ANSWER ✔ AF Form 1477 Daily
Construction Inspection Report

4. (From the Programming Fundamentals Lesson) You are working on a
project and determine a change order is needed because the beams were too
small to handle the roof load. However, this would exceed the approval
authority for this Construction project. What is a viable option for the project

, team? - ANSWER ✔ Resubmit the project to obtain appropriate approval
even if work must stop while the approval is obtained.

5. (From the Programming Fundamentals Lesson) If a project modifies an
existing facility to make it compliant with current codes and regulations, it is
likely a(n) _______ project. - ANSWER ✔ Repair

6. (From the Programming Fundamentals Lesson) Match the class of cost
estimate with its definition and use (not all options will have a match). -
ANSWER ✔ Class 1: Unit Price
Used to negotiate and compare bids with Contractors.

7. Class 3: Parametric Used for budgeting and making the official Programmed
Amount.

8. Class 5: Square Foot Used for long range planning when the scope is still
poorly defined.

9. (From the Project Management Plan Lesson) MSgt Jones is an extremely
competent SNCO that has years of experience working on high voltage
power projects. You have recently been appointed project manager for a new
power line installation on a remote part of your base. Gaining MSgt Jones
onto your project team would be an example of which type of risk? -
ANSWER ✔ Opportunity

10.75% rule - ANSWER ✔ A guideline used in project management to ensure
that 75% of a project's funding is secured before moving forward.

11.APF/NAF - ANSWER ✔ Appropriated Funds (APF) and Non-
Appropriated Funds (NAF) are types of funding sources for projects.

12.Basic programming thresholds - ANSWER ✔ The minimum requirements
or standards that must be met during the programming phase of a project.

13.Project Lifecycle - ANSWER ✔ The natural phases of any project,
including Planning & Programming, Design & Contracting, Construction,
and Closeout.

Document information

Uploaded on
September 15, 2026
Number of pages
11
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ProfBenjamin
3.8
(157)
Sold
794
Followers
19
Items
4151
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions