Terms in this set (35)
The 1970's law that set into place the the clean water act
regulation of stormwater is:
-the federal pollution discharge
elimination rule
-the stormwater pollution control act
-the national water control act
-the clean water act
, Requirements for managing NPDES
stormwater activity on a construction
site are outlined in the following
regulation
-NOI
-NPDES
-NOT
-DOT
Which of the following is never an discharge from contaminated groundwater
allowable stormwater discharge from
a construction site?
-discharge from burrow areas
-discharge from contaminated
groundwater
-discharge from dewatering activities
-discharge from staging areas
The notice of termination can be filed all construction activity, inside and outside the
when building, is complete and permanent stabilization
-general contractor applies seed and has been verified as adequate to meet permit
mulch near the end of the project requirements
-at the end of rainy season
-all construction activity, inside and
outside the building, is complete and
permanent stabilization has been
verified as adequate to meet permit
requirements
-only offsite street work is left
EMPLOYMENT, WASTE, STORMWATER
COMPLIANCE CERTIFICATION Q&A 100% PASS
Play your way to mastery with fun games
Match Blocks Charms NEW
Terms in this set (35)
The 1970's law that set into place the the clean water act
regulation of stormwater is:
-the federal pollution discharge
elimination rule
-the stormwater pollution control act
-the national water control act
-the clean water act
, Requirements for managing NPDES
stormwater activity on a construction
site are outlined in the following
regulation
-NOI
-NPDES
-NOT
-DOT
Which of the following is never an discharge from contaminated groundwater
allowable stormwater discharge from
a construction site?
-discharge from burrow areas
-discharge from contaminated
groundwater
-discharge from dewatering activities
-discharge from staging areas
The notice of termination can be filed all construction activity, inside and outside the
when building, is complete and permanent stabilization
-general contractor applies seed and has been verified as adequate to meet permit
mulch near the end of the project requirements
-at the end of rainy season
-all construction activity, inside and
outside the building, is complete and
permanent stabilization has been
verified as adequate to meet permit
requirements
-only offsite street work is left