Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 8 pages
Exam (elaborations)

NFPA 25 2014 Chapters 1–70 Study Guide – Fire Protection Inspection, Testing & Maintenance

Document preview thumbnail
Preview 2 out of 8 pages

NFPA 25 2014 Chapters 1–70 Study Guide – Fire Protection Inspection, Testing & Maintenance

Content preview

2026/2027NFPA 25 2014 1-70(questions & answers).!!!!
(questions & answers).!!!!(questions & answers).!!!! (questions & answers).!!!!(questions & answers).!!!!
NFPA 25 2014 1-70 2025/2026
50 PERCENT. NFPA 25 14.2.2
IN LARGE WAREHOUSES, HIGH RISE
BUILDINGS AND OTHER BUILDINGS
HAVING MULTIPLE SYSTEMS, IT IS
REASONABLE TO PERFORM THE
INTERNAL INSPECTION ON "BLANK" %
PERCENT OF THE SYSTEMS IN THE
BUILDING?



CHECK VALVES SHALL BE INTERNALLY 5 YEARS. NFPA 25 13 4.2.1
INSPECTED EVERY "BLANK" YEARS

WEEKLY. NFPA 25 13.4.3.1.1.1
PRE-ACTION VALVE ENCLOSURES
EQUIPPED WITH LOW TEMPERATURE
ALARMS SHALL BE INSPECTED?

MONTHLY. NFPA 25 13.4.1.1
ALARM VALVES AND SYSTEM RISER
CHECK VALVES SHALL BE
EXTERNALLY INSPECTED "BLANK"

ANNUALLY. NFPA 25 13.4.3.1.7
THE INTERIOR OF THE PRE-ACTION
OR DLUGE VALVE AND THE CONDITION
OF DETECTION DEVICES SHALL BE
INSPECTED?

5 YEARS. NFPA 25 13.4.1.2
STRAINERS, FILTERS AND
RESTRICTED ORIFICES SHALL BE
INSPECTED INTERNALLY EVERY
"BLANK" YEARS UNLESS TESTS
INDICATE A GREATER FREQUENCY IS
REQUIRED?

SYSTEM CONTROL RISER. NFPA 25 4.1.9.1
CONSIDER A DRY PIPE SYSTEM WHICH
HAS A REQUIREMENT FOR A
PERMANENTLY MARKED INFORMATION
SIGN. WHERE SHALL THE SIGN BE
PLACED?


QUARTERLY. NFPA 25 5.2.6
THE HYDRAULIC DESIGN
INFORMATION SIGN FOR THE
HYDRAULICALLY DESIGNED SYSTEMS
SHALL BE INSPECTED?

ANNUALLY. NFPA 25 6.2.3
WHEN PROVIDED, THE HYDRAULIC
DESIGN INFORMATION SIGN FOR
STANDPIPE SYSTEMS SHALL BE
INSPECTED?

NFPA 15 STANDARD FOR WATER SPRAY FIXED SYSTEMS FOR FIRE
CONSIDER A WATER SPRAY FIXED PROTECTION 2012 EDITION
SYSTEM WITH AN IDENTIFICATION
SIGN. THE SIGN SHALL CONFORM
WITH WHICH NFPA STANDARD?

DATE TRIPPED AND PERSON CONDUCTING TEST. NFPA 25 13.4.4.2.5

WHICH OF THE FOLLOWING IS
REQUIRED TO BE INCLUDED ON THE
TAG ATTACHED TO A DRY PIPE VALVE?
DATE TRIPPED AND PERSON
CONDUCTING TEST. SYSTEM
HYDRAULIC INFORMATION. LOCATION
OF THE QUICK OPENING DEVICE. ALL
OF THE ABOVE.




NFPA 25 2014 1-70.pdf(questions & answers).!!!!(questions
NFPA & 25answers).!!!!(questions
2014 1-70.pdf(questions&&
answers).!!!!
answers).!!!! 9/14/2026

, 2026/2027NFPA 25 2014 1-70(questions & answers).!!!!
(questions & answers).!!!!(questions & answers).!!!! (questions & answers).!!!!(questions & answers).!!!!
NFPA 25 2014 1-70 2025/2026
50 YEARS. NFPA 25 5.3.1.1.1
STANDARD SPRINKLERS SHALL BE
REPLACED OR A REPRESENTATIVE
SAMPLE SHALL BE TESTED (NOT
REQUIRED TO BE SENT TO A LISTING
AGENCY) AFTER THEY HAVE BEEN IN
SERVICE FOR HOW MANY YEARS?


3% PERCENT. NFPA 25 5.3.2.1
GAUGES NOT ACCURATE WITHIN
"BLANK" PERCENT OF THE FULL
GAUGE SCALE SHALL BE
RECALIBRATED OR REPLACED.

RESTORE ORIGINAL PERFORMANCE AS INTENDED BY THE LISTING. NFPA 25
MANUFACTURERS SHALL BE 5.3.1.3.1
PERMITTED TO MAKE MODIFICATION
TO THEIR OWN SPRINKLER IN THE
FIELD WITH LISTED DEVICES THAT
"BLANK", WHERE ACCEPTABLE TO THE
AJH.

SPRINKLERS MANUFACTURED 1920. NFPA 25 5.3.1.1.1.2
BEFORE "BLANK" SHALL BE
REPLACED.
10 YEARS. NFPA 25 5.3.1.1.1.6
DRY SPRINKLERS THAT HAVE BEEN IN
SERVICE FOR "BLANK" YEARS SHALL
BE REPLACED OR REPRESENTATIVE
SAMPLES SHALL BE TESTED?

ANSWER. THE CONTROL VALVE IS CLOSED AND REOPENED AT THE SYSTEM
RISER. NFPA 25 13.3.3.4
WHAT EVENT WILL REQUIRE A MAIN
DRAIN TEST? THE ACTIVATION OF A
SPRINKLER. THE FIRE PUMP
STARTING. THE ALARM DEVICE FAILS
TO TEST PROPERLY. THE CONTROL
VALVE IS CLOSED AND REOPENED AT
THE SYSTEM RISER.


ANNUALLY. NFPA 25 13.3.3.1
TESTING THE POSITION AND
OPERATION OF A CONTROL VALVE
SHALL BE PERFORMED AT WHAT
FREQUENCY?

TO CHECK FOR CHANGE IN CONDITION OF WATER SUPPLY PIPING AND
WHAT IS THE PURPOSE OF A MAIN CONTROL VALVES. NFPA 25 A13.2.5
DRAIN TEST AT EACH WATER BASED
FIRE PROTECTION SYSTEM RISER?

QUARTERLY. NFPA 25 13.2.5.2
CONSIDER A SYSTEM WHERE THE
SOLE WATER SUPPLY IS THROUGH A
BACK FLOW PREVENTER AND / OR
PRESSURE REDUCING VALVE. WHAT IS
THE FREQUENCY FOR A MAIN DRAIN
TEST?

THE CAUSE OF THE REDUCTION SHALL BE IDENTIFIED AND CORRECTED. 10
PERCENT REDUCTION TOLERANCE WHEN COMPARED TO INITIAL FLOW
CONSIDER A WET PIPE SPRINKLER
PRESSURE. NFPA 25 13.2.5.3
SYSTEM MAIN DRAIN TEST. THE FULL
FLOW PRESSURE READING WAS 70
PSI. DURING INITIAL ACCEPTANCE
TESTING (3 YEARS PRIOR) THE FULL
FLOW PREASSURE READING WAS 79
PSI. WHAT ACTION SHOULD BE TAKEN?


ANNUALLY. NFPA 25 13.3.3.1
WHAT IS THE TESTING FREQUENCY
FOR THE OPERATIONAL FUNCTION OF
A CONTROL VALVE?

SPRING TEST. NFPA 25 A13.3.3.2
WHAT TYPE OF TEST IS CONDUCTED
TO VERIFY THAT A POST IDICATOR
VALVE IS FULLY OPEN?



NFPA 25 2014 1-70.pdf(questions & answers).!!!!(questions
NFPA & 25answers).!!!!(questions
2014 1-70.pdf(questions&&
answers).!!!!
answers).!!!! 9/14/2026

Document information

Uploaded on
September 14, 2026
Number of pages
8
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
filwe1099salmin
4.7
(234)
Sold
4875
Followers
116
Items
1190
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions