1. During a practical evaluation, the operator is asked to demonstrate
familiarity with the crane controls. Which action best demonstrates
proper control knowledge?
A. Operating every control at maximum speed
B. Identifying each control and demonstrating smooth, controlled movements
C. Operating the controls without checking the machine
D. Allowing the signal person to operate the controls
Answer: B. Identifying each control and demonstrating smooth, controlled
movements
The practical examination evaluates knowledge of the hoisting machine’s
controls and the operator’s ability to operate them correctly and safely.
2. Before beginning a lifting operation, the operator notices an abnormal
hydraulic leak. What should the operator do?
A. Continue operating until the leak becomes severe
B. Add hydraulic fluid while the machine is operating
C. Stop and report the defect before operating
D. Increase engine speed to compensate
Answer: C. Stop and report the defect before operating
An unsafe mechanical condition must be addressed before the machine is
placed into service.
3. A load is suspended from the crane and begins to swing unexpectedly.
What is the safest operator response?
A. Accelerate the hoist
B. Make abrupt control movements
C. Use smooth corrective movements and stabilize the load
D. Swing the load faster in the opposite direction
Answer: C. Use smooth corrective movements and stabilize the load
,Smooth control reduces dynamic loading and helps prevent uncontrolled load
movement.
4. During the practical examination, the operator must raise a boom with a
luffing jib attached. Which skill is specifically relevant?
A. Removing the jib before raising the boom
B. Raising, jackknifing, and laying down the boom with the luffing jib attached
C. Operating only the hoist drum
D. Disconnecting the load line
Answer: B. Raising, jackknifing, and laying down the boom with the luffing jib
attached
NYC rules specifically identify this capability as part of the practical
examination for applicable cranes.
5. For a crane equipped with a telescoping boom and attached jib, which
practical skill may be evaluated?
A. Removing the counterweights
B. Extending and retracting the boom with the jib attached
C. Removing the operator's seat
D. Disconnecting the load block
Answer: B. Extending and retracting the boom with the jib attached
The NYC practical examination requirements specifically include extending or
retracting a telescoping boom with an attached jib.
6. Before making a lift, the operator should first verify that the load weight
is:
A. Greater than the crane's capacity
B. Unknown
C. Within the crane's rated capacity for the actual configuration
D. Determined only after the load leaves the ground
Answer: C. Within the crane's rated capacity for the actual configuration
Rated capacity depends on the machine configuration and operating
conditions.
, 7. The crane is set up with outriggers. What is the primary purpose of
properly positioned outriggers?
A. Increase engine horsepower
B. Improve machine stability and distribute loads to the supporting surface
C. Increase maximum travel speed
D. Reduce fuel consumption
Answer: B. Improve machine stability and distribute loads to the supporting
surface
Proper outrigger setup is essential for maintaining stability during lifting
operations.
8. An outrigger is positioned over weak soil. What should the operator do?
A. Proceed because the outrigger is extended
B. Increase the lifting speed
C. Ensure adequate ground support and proper setup before lifting
D. Reduce counterweight
Answer: C. Ensure adequate ground support and proper setup before lifting
Ground conditions are critical because inadequate support can cause
settlement or overturning.
9. A crane's load chart shows different capacities for different boom
lengths. Which capacity should be used?
A. The highest capacity on the chart
B. The capacity corresponding to the actual operating configuration
C. The capacity from a different crane
D. The capacity from the previous lift
Answer: B. The capacity corresponding to the actual operating configuration
The load chart must match the crane's actual configuration and operating
conditions.
10.What is the greatest danger of exceeding the crane's rated capacity?
A. Increased fuel economy
B. Reduced engine temperature
, C. Structural failure or loss of stability
D. Faster hoisting
Answer: C. Structural failure or loss of stability
Overloading can produce excessive structural stresses and destabilizing forces.
11.When beginning a lift, the operator should initially raise the load:
A. Abruptly
B. Slowly and under control
C. At maximum speed
D. While simultaneously swinging rapidly
Answer: B. Slowly and under control
A controlled initial lift allows the operator to detect unexpected conditions
before fully committing the load to the lift.
12.A suspended load is close to an obstruction. What should the operator
do?
A. Continue without communication
B. Increase speed
C. Maintain controlled movement and follow the designated signal person
D. Swing the load rapidly
Answer: C. Maintain controlled movement and follow the designated signal
person
Clear communication and controlled movement are essential when working
near obstructions.
13.A signal person gives a signal that the operator cannot clearly
understand. What should the operator do?
A. Guess the intended movement
B. Continue the previous movement
C. Stop until the signal is understood
D. Increase speed
Answer: C. Stop until the signal is understood
EXAM PRACTICE 100 QUESTIONS 2026-2027|ORIGINAL QUESTIONS &
ANSWERS |DETAILED RATIONALES |HINTED COMPLETE EXAM PREP GRADED
A+*INSTANT DOWNLOAD PDF*
1. During a practical evaluation, the operator is asked to demonstrate
familiarity with the crane controls. Which action best demonstrates
proper control knowledge?
A. Operating every control at maximum speed
B. Identifying each control and demonstrating smooth, controlled movements
C. Operating the controls without checking the machine
D. Allowing the signal person to operate the controls
Answer: B. Identifying each control and demonstrating smooth, controlled
movements
The practical examination evaluates knowledge of the hoisting machine’s
controls and the operator’s ability to operate them correctly and safely.
2. Before beginning a lifting operation, the operator notices an abnormal
hydraulic leak. What should the operator do?
A. Continue operating until the leak becomes severe
B. Add hydraulic fluid while the machine is operating
C. Stop and report the defect before operating
D. Increase engine speed to compensate
Answer: C. Stop and report the defect before operating
An unsafe mechanical condition must be addressed before the machine is
placed into service.
3. A load is suspended from the crane and begins to swing unexpectedly.
What is the safest operator response?
A. Accelerate the hoist
B. Make abrupt control movements
C. Use smooth corrective movements and stabilize the load
D. Swing the load faster in the opposite direction
Answer: C. Use smooth corrective movements and stabilize the load
,Smooth control reduces dynamic loading and helps prevent uncontrolled load
movement.
4. During the practical examination, the operator must raise a boom with a
luffing jib attached. Which skill is specifically relevant?
A. Removing the jib before raising the boom
B. Raising, jackknifing, and laying down the boom with the luffing jib attached
C. Operating only the hoist drum
D. Disconnecting the load line
Answer: B. Raising, jackknifing, and laying down the boom with the luffing jib
attached
NYC rules specifically identify this capability as part of the practical
examination for applicable cranes.
5. For a crane equipped with a telescoping boom and attached jib, which
practical skill may be evaluated?
A. Removing the counterweights
B. Extending and retracting the boom with the jib attached
C. Removing the operator's seat
D. Disconnecting the load block
Answer: B. Extending and retracting the boom with the jib attached
The NYC practical examination requirements specifically include extending or
retracting a telescoping boom with an attached jib.
6. Before making a lift, the operator should first verify that the load weight
is:
A. Greater than the crane's capacity
B. Unknown
C. Within the crane's rated capacity for the actual configuration
D. Determined only after the load leaves the ground
Answer: C. Within the crane's rated capacity for the actual configuration
Rated capacity depends on the machine configuration and operating
conditions.
, 7. The crane is set up with outriggers. What is the primary purpose of
properly positioned outriggers?
A. Increase engine horsepower
B. Improve machine stability and distribute loads to the supporting surface
C. Increase maximum travel speed
D. Reduce fuel consumption
Answer: B. Improve machine stability and distribute loads to the supporting
surface
Proper outrigger setup is essential for maintaining stability during lifting
operations.
8. An outrigger is positioned over weak soil. What should the operator do?
A. Proceed because the outrigger is extended
B. Increase the lifting speed
C. Ensure adequate ground support and proper setup before lifting
D. Reduce counterweight
Answer: C. Ensure adequate ground support and proper setup before lifting
Ground conditions are critical because inadequate support can cause
settlement or overturning.
9. A crane's load chart shows different capacities for different boom
lengths. Which capacity should be used?
A. The highest capacity on the chart
B. The capacity corresponding to the actual operating configuration
C. The capacity from a different crane
D. The capacity from the previous lift
Answer: B. The capacity corresponding to the actual operating configuration
The load chart must match the crane's actual configuration and operating
conditions.
10.What is the greatest danger of exceeding the crane's rated capacity?
A. Increased fuel economy
B. Reduced engine temperature
, C. Structural failure or loss of stability
D. Faster hoisting
Answer: C. Structural failure or loss of stability
Overloading can produce excessive structural stresses and destabilizing forces.
11.When beginning a lift, the operator should initially raise the load:
A. Abruptly
B. Slowly and under control
C. At maximum speed
D. While simultaneously swinging rapidly
Answer: B. Slowly and under control
A controlled initial lift allows the operator to detect unexpected conditions
before fully committing the load to the lift.
12.A suspended load is close to an obstruction. What should the operator
do?
A. Continue without communication
B. Increase speed
C. Maintain controlled movement and follow the designated signal person
D. Swing the load rapidly
Answer: C. Maintain controlled movement and follow the designated signal
person
Clear communication and controlled movement are essential when working
near obstructions.
13.A signal person gives a signal that the operator cannot clearly
understand. What should the operator do?
A. Guess the intended movement
B. Continue the previous movement
C. Stop until the signal is understood
D. Increase speed
Answer: C. Stop until the signal is understood