VERIFIED AND 100% ACCURATE ANSWERS
No part of an individual sewage system location shall be
within_____feet of a building, foundation or property line. Correct
Answers 10
No part of an individual sewage system location shall be
within_____feet of a public water supply line Correct Answers 25
No part of an individual sewage system location shall be
within_____feet of a private water supply line. Correct Answers 10
There shall be a minimum of ______ feet between any portion of a
standard soil absorption system and seasonal groundwater bedrock, and
any other impermeable layer Correct Answers 3
There shall be no standard septic tank soil absorption system installed in
soils where percolation test results show an average percolation time of
less than_____ minutes per inch. Correct Answers 5
A minimum of _____ test holes for perc test Correct Answers 4
The test hole shall be completely filled with water to ground level and
maintained to a depth of at least ______ inches for a minimum period of
______ hours before beginning the percolation rate measurement.
Correct Answers 12 inches and 4 hours