OCSM EXAM 2 UPDATED ACTUAL QUESTIONS AND
CORRECT ANSWERS
Question:
1. Work Measurement Techniques
Answer:
Methods used to determine time required to perform a task
Question:
2. Standard Elemental Times
Answer:
Uses historical time data for repetitive tasks
Question:
3. Predetermined Time Standards (PTS)
Answer:
Uses motion/time systems without direct observation
Question:
4. Work Sampling
Answer:
Random observations used to estimate time spent on activities
Question:
5. Stopwatch Time Study
Answer:
Direct timing of a task using a stopwatch
Question:
6. Work Sampling Formula
Answer:
n = (z/e)² × p■(1 − p■)
Question:
7. Work Sampling Advantage
Answer:
Low cost, minimal disruption
Question:
8. Work Sampling Disadvantage
Answer:
Less precise, requires many observations
Question:
9. Observed Time (OT)
, Answer:
Average time of observations (sum of times ÷ number of observations)
Question:
10. Normal Time (NT)
Answer:
OT × Performance Rating
Question:
11. Standard Time (ST)
Answer:
NT × Allowance Factor
Question:
12. Performance Rating (PR)
Answer:
Adjustment factor based on worker speed vs standard
Question:
13. Allowance Factor (AF)
Answer:
Accounts for breaks, fatigue, delays
Question:
14. AF (job)
Answer:
1+A
Question:
15. AF (day)
Answer:
1 / (1 − A)
Question:
16. Work Sampling vs Stopwatch Study
Answer:
Sampling = cheaper, less precise; Stopwatch = more accurate, more costly
Question:
17. Forward Scheduling
Answer:
Start jobs as soon as possible
Question:
18. Backward Scheduling
CORRECT ANSWERS
Question:
1. Work Measurement Techniques
Answer:
Methods used to determine time required to perform a task
Question:
2. Standard Elemental Times
Answer:
Uses historical time data for repetitive tasks
Question:
3. Predetermined Time Standards (PTS)
Answer:
Uses motion/time systems without direct observation
Question:
4. Work Sampling
Answer:
Random observations used to estimate time spent on activities
Question:
5. Stopwatch Time Study
Answer:
Direct timing of a task using a stopwatch
Question:
6. Work Sampling Formula
Answer:
n = (z/e)² × p■(1 − p■)
Question:
7. Work Sampling Advantage
Answer:
Low cost, minimal disruption
Question:
8. Work Sampling Disadvantage
Answer:
Less precise, requires many observations
Question:
9. Observed Time (OT)
, Answer:
Average time of observations (sum of times ÷ number of observations)
Question:
10. Normal Time (NT)
Answer:
OT × Performance Rating
Question:
11. Standard Time (ST)
Answer:
NT × Allowance Factor
Question:
12. Performance Rating (PR)
Answer:
Adjustment factor based on worker speed vs standard
Question:
13. Allowance Factor (AF)
Answer:
Accounts for breaks, fatigue, delays
Question:
14. AF (job)
Answer:
1+A
Question:
15. AF (day)
Answer:
1 / (1 − A)
Question:
16. Work Sampling vs Stopwatch Study
Answer:
Sampling = cheaper, less precise; Stopwatch = more accurate, more costly
Question:
17. Forward Scheduling
Answer:
Start jobs as soon as possible
Question:
18. Backward Scheduling