CPES UPDATED ACTUAL QUESTIONS AND CORRECT
ANSWERS
Question:
1. CONSTRUCTORS PERFORMANCE EVALUATION SYSTEM
Answer:
CPES
Question:
2. CPES
Answer:
a system of grading the performance of a constructor for a specific kind of infrastructure projects using a
set of criteria
Question:
3. (CPES IU)
Answer:
- refers to the unit of an agency responsible for the implementation of CPES;
Question:
4. (CPE)
Answer:
- refers to an individual or group of evaluators accredited by CIAP's PDCB tasked to undertake
performance evaluation of a constructor's project using the CPES Guidelines and/or evaluation
requirements of the construction industry; and
Question:
5. CIAP's PDCB
Answer:
- shall establish the CPES central databank and maintain linkages with concerned agencies to ensure timely
and continuous submission of authenticated copies of accomplished CPES Evaluation Form and to
facilitate information sharing among users of CPES data.
Question:
6. horizontal projects
Answer:
Road, Bridge, Ports & Harbor, Irrigation and Flood Control, Water Supply and Sewerage, and Mooring
Facilities for Power Barges
Question:
7. vertical projects
Answer:
Housing, Building, Power Transmission Line, Substation and Diesel Power Plant)
, Question:
8. 60%
Answer:
rating for horizontal projects during construction
Question:
9. 70%
Answer:
rating for vertical projects during construction
Question:
10. 40%
Answer:
rating for horizontal projects upon completion
Question:
11. 30%
Answer:
rating for vertical projects upon completion
Question:
12. 0.40
Answer:
workmanship maximum rating during construction
Question:
13. 0.50
Answer:
workmanship maximum rating upon completion
Question:
14. 0.30
Answer:
materials maximum rating during construction
Question:
15. 0.15
Answer:
time maximum rating during construction
Question:
16. 0.20
Answer:
materials maximum rating upon completion
ANSWERS
Question:
1. CONSTRUCTORS PERFORMANCE EVALUATION SYSTEM
Answer:
CPES
Question:
2. CPES
Answer:
a system of grading the performance of a constructor for a specific kind of infrastructure projects using a
set of criteria
Question:
3. (CPES IU)
Answer:
- refers to the unit of an agency responsible for the implementation of CPES;
Question:
4. (CPE)
Answer:
- refers to an individual or group of evaluators accredited by CIAP's PDCB tasked to undertake
performance evaluation of a constructor's project using the CPES Guidelines and/or evaluation
requirements of the construction industry; and
Question:
5. CIAP's PDCB
Answer:
- shall establish the CPES central databank and maintain linkages with concerned agencies to ensure timely
and continuous submission of authenticated copies of accomplished CPES Evaluation Form and to
facilitate information sharing among users of CPES data.
Question:
6. horizontal projects
Answer:
Road, Bridge, Ports & Harbor, Irrigation and Flood Control, Water Supply and Sewerage, and Mooring
Facilities for Power Barges
Question:
7. vertical projects
Answer:
Housing, Building, Power Transmission Line, Substation and Diesel Power Plant)
, Question:
8. 60%
Answer:
rating for horizontal projects during construction
Question:
9. 70%
Answer:
rating for vertical projects during construction
Question:
10. 40%
Answer:
rating for horizontal projects upon completion
Question:
11. 30%
Answer:
rating for vertical projects upon completion
Question:
12. 0.40
Answer:
workmanship maximum rating during construction
Question:
13. 0.50
Answer:
workmanship maximum rating upon completion
Question:
14. 0.30
Answer:
materials maximum rating during construction
Question:
15. 0.15
Answer:
time maximum rating during construction
Question:
16. 0.20
Answer:
materials maximum rating upon completion