Questions And Answers 2025/2026
Masterformat provides a standard structure for organizing construction standards.
How many primary divisions are part of the Masterformat? - CORRECT ANSWER--
NOT- 51
Task orders are used for which of the below kinds of work? - CORRECT ANSWER-
Non-complex construction and maintenance and repair
The Master Planner wants to award a contract to support the installation's master
planning efforts. Based on FAR Part 36.601-4(a), would this effort be accomplished
through an architect-engineer contract? - CORRECT ANSWER-Yes
The Installation Commander is asking questions about military construction,
operations and maintenance, and military family housing projects planned for the
installation. Which component of the Comprehensive Plan would you go to a
detail of the physical location of projects that have been approved or programmed
for funding throughout the installation? - CORRECT ANSWER--NOT- Land Use Plan
As the Design Manager preparing the government estimate for a design project.
When considering profit, which if the following in NOT true? - CORRECT ANSWER--
NOT- Profit should consider the nature of the work to be performed
,FAR Part 22.406-7 - Compliance Checking requires interviews of laborers to check
work classification, rates of pay, fringe benefits payment, and hours worked. How
often is the Government required to conduct these interviews? - CORRECT
ANSWER-Agency's policy
All project planning projects include the same five steps. Which of the following
shows the five steps in their logical progression? - CORRECT ANSWER-Develop
requirements; evaluate assets; analysis, concepts, and proposals; initiate action;
feedback and quality assurance
Which of the following may be required if Government Furnished Equipment
(GFE) is not supplied to the contractor in accordance with the time specified in the
contract? - CORRECT ANSWER-An adjustment in price or delivery schedule in the
contract
The Base Operations Support contractor in performing preventative maintenance
on the HVAC in the headquarters building. At the same time, they are responding
to a service call to repair one of the toilets in the building. This work would be
defined as: - CORRECT ANSWER-Sustainment
You are the installation Environmental Division Chief. There are residential
structures on the installation where lead-based paint has been used that have
been identified for disposal. Which of the following environmental requirements
best describes the procedure(s) that should be followed? - CORRECT ANSWER--
NOT- A report that states the extent of lead-based paint contamination and plans
for decontamination must be submitted
, Which of the following is NOT a potential action for disposal of surplus property? -
CORRECT ANSWER--NOT- Public sale
As the Project Manager, why might you NOT prefer to use a design-bid-build
methodology for procuring the design and construction of your project? -
CORRECT ANSWER-Increased potential for misinterpretations and possible
litigation
&
Lack of input from contractors and subcontractors in the design process
Which of the following is not benefit of the Work Management System? -
CORRECT ANSWER-Decreased worker productivity
As the Design Manager you are working with the Contracting Officer to develop
the evaluation criteria for a two-phase design-build solicitation. What would NOT
be a first phase evaluation criteria. - CORRECT ANSWER-Cost Proposal
The Contracting Officer needs to direct the contractor to perform changes in the
work within the general scope of the contract. What clause would the Contracting
Officer use to unilaterally direct the change? - CORRECT ANSWER-FAR Clause
52.243-4, Changes
The Contracting Officer has issued a Request for Proposal. What will be a
requirement for the facility engineers once proposals have been received. -
CORRECT ANSWER-Perform independent technical evaluation