According to ASME B30.5, How frequently is a crane operator required to have
a physical?
Choose an answer
1 Every 6 months 2 Once every 10 years
, 3 Only when the operator feels sick 4 Every 3 years
Don't know?
Terms in this set (78)
What is prohibited by OSHA 1926 Splicing
Subpart cc regarding wire rope on a
crane?
What should be of major concern Voids, tanks, loose fill, depressions
when considering surfaces for crane
set up locations?
Which items are included in the Load weight, rigging, load block
suspended weight when calculating
parts of line?
What site condition must an operator Soil stability must be sufficient
be concerned about prior to setting
up a crane?
What is an example of duty cycle High speed concrete placement
crane operations?
CORRECT ACTUAL QUESTIONS AND CORRECTLY
WELL DEFINED ANSWERS LATEST ALREADY
GRADED A+
Play your way to mastery with fun games
Match Blocks Charms NEW
Practice questions for this set
Learn 1 /7 Study with Learn
According to ASME B30.5, How frequently is a crane operator required to have
a physical?
Choose an answer
1 Every 6 months 2 Once every 10 years
, 3 Only when the operator feels sick 4 Every 3 years
Don't know?
Terms in this set (78)
What is prohibited by OSHA 1926 Splicing
Subpart cc regarding wire rope on a
crane?
What should be of major concern Voids, tanks, loose fill, depressions
when considering surfaces for crane
set up locations?
Which items are included in the Load weight, rigging, load block
suspended weight when calculating
parts of line?
What site condition must an operator Soil stability must be sufficient
be concerned about prior to setting
up a crane?
What is an example of duty cycle High speed concrete placement
crane operations?