Exam (elaborations)

NEW MEXICO EE-98 ELECTRICAL CODE EXAM – SPECIALTY SYSTEMS, GROUNDING & BONDING COMPLETE EXAM QUESTIONS AND VERIFIED ANSWERS | 2026–2027 LATEST UPDATE | GUARANTEED PASS | DETAILED RATIONALES | FULL STUDY GUIDE | EXAM PREP | PRACTICE TEST | CERTIF

Document preview thumbnail
Preview 3 out of 30 pages

NEW MEXICO EE-98 ELECTRICAL CODE EXAM – SPECIALTY SYSTEMS, GROUNDING & BONDING COMPLETE EXAM QUESTIONS AND VERIFIED ANSWERS | 2026–2027 LATEST UPDATE | GUARANTEED PASS | DETAILED RATIONALES | FULL STUDY GUIDE | EXAM PREP | PRACTICE TEST | CERTIFICATION PREPARATION

Content preview

NEW MEXICO EE-98 ELECTRICAL CODE EXAM – SPECIALTY
SYSTEMS, GROUNDING & BONDING
COMPLETE EXAM QUESTIONS AND VERIFIED ANSWERS |
2026–2027 LATEST UPDATE | GUARANTEED PASS | DETAILED
RATIONALES | FULL STUDY GUIDE | EXAM PREP | PRACTICE
TEST | CERTIFICATION PREPARATION

SECTION ONE — QUESTIONS 1–100

1. According to the New Mexico Administrative Code (NMAC 14.6.6.10), what is the maximum
nominal voltage for electrical systems that may be installed under an EE-98 license?

A) 600 volts
B) 2,400 volts
C) 5,000 volts
D) 15,000 volts

Correct Answer: C) 5,000 volts

Rationale: NMAC 14.6.6.10.B(1)(a) specifies that an EE-98 license covers residential, commercial, and
industrial electrical wiring operating at 5,000 volts nominal or less. This includes all electrical systems
and wiring methods identified in electrical specialty classifications ES-1, ES-2, ES-3, ES-7, ES-10R, and
ER-1. The 5,000-volt limit is the defining characteristic of the EE-98 license scope.



2. Under NMAC 14.6.6.10.A(3), who may install raceways within or on buildings?

A) Any licensed electrician regardless of classification
B) Only contractors holding an EE-98 license
C) ES-1 specialty license holders for any raceway installation
D) ER-1 licensees for all commercial raceway work

Correct Answer: B) Only contractors holding an EE-98 license

Rationale: NMAC 14.6.6.10.A(3) explicitly states that all raceway installations within, or on, buildings
must be performed by a contractor holding an EE-98 license. Specialty electrical license holders (ES-1,
ES-2, ES-3, ES-7, ES-10R, and ES-10) are prohibited from installing raceways within or on buildings,
with limited exceptions for ER-1 licensees performing incidental residential wiring.



3. What is the minimum experience requirement to obtain an EE-98 license in New Mexico?

A) 2 years (4,000 hours)
B) 3 years (6,000 hours)
C) 4 years (8,000 hours)
D) 5 years (10,000 hours)

,Correct Answer: C) 4 years (8,000 hours)

Rationale: The EE-98 license requires four years or 8,000 hours of experience. This is a higher
requirement than specialty electrical classifications, reflecting the broader scope of work permitted
under the EE-98 license, which includes residential, commercial, and industrial electrical wiring up to
5,000 volts .



4. How many questions are on the EE-98 Part 3 (Specialties) exam, and what is the minimum score
required to pass?

A) 40 questions, 70% passing
B) 50 questions, 75% passing (38 correct)
C) 80 questions, 70% passing
D) 100 questions, 75% passing

Correct Answer: B) 50 questions, 75% passing (38 correct)

Rationale: The EE-98 Part 3 Specialties exam consists of 50 multiple-choice questions. Candidates
must answer at least 38 questions correctly to achieve the required 75% passing score. The exam is
open-book and allows 135 minutes for completion .



5. According to NMAC 14.10.3.9, an EE-98 licensee may install fire alarm systems connected to a
commercial monitoring station serving how many or more apartments?

A) 4
B) 6
C) 8
D) 10

Correct Answer: D) 10

Rationale: NMAC 14.10.3.9 restricts EE-98 fire alarm work to systems monitored by a station serving
ten or more apartments. Larger or more complex fire alarm systems require a higher-level license.
This is a New Mexico state-specific amendment that limits the scope of fire alarm work for EE-98
licensees .



6. What is the maximum time allowed for an emergency system generator to attain full rated
voltage and assume the load after loss of normal power under NEC Article 700?

A) 5 seconds
B) 10 seconds
C) 30 seconds
D) 60 seconds

Correct Answer: B) 10 seconds

Rationale: NEC 700.12(F) requires emergency system generators to start and assume the load within
10 seconds after loss of normal power. This is the strictest time requirement among standby systems,

, reflecting the life-safety critical nature of emergency systems. Legally required standby systems under
Article 701 permit a 60-second delay .



7. What is the required minimum illumination time for battery-powered emergency egress lighting
per NEC Article 700?

A) 30 minutes
B) 60 minutes
C) 90 minutes
D) 120 minutes

Correct Answer: C) 90 minutes

Rationale: NEC 700.12(E) requires storage batteries for emergency systems to supply and maintain
the total load for a minimum of 90 minutes. This ensures that emergency lighting and other life-
safety equipment remain operational during an extended power outage, allowing sufficient time for
building evacuation .



8. Fire alarm circuits that are power-limited (PLFA) must be installed according to which NEC
Article?

A) Article 725
B) Article 760
C) Article 800
D) Article 830

Correct Answer: B) Article 760

Rationale: NEC Article 760 covers fire alarm systems, including both power-limited fire alarm (PLFA)
and non-power-limited fire alarm (NPLFA) circuits. Article 725 applies to Class 2 and Class 3 remote-
control and signaling circuits, while Article 800 covers communications circuits .



9. What type of cable is required for fire alarm circuits installed in an air-handling plenum space?

A) FPL
B) FPLR
C) FPLP
D) FPLF

Correct Answer: C) FPLP

Rationale: FPLP stands for Fire Alarm Power Limited Plenum cable. It is listed for use in plenum spaces
(air-handling spaces used for environmental air distribution) due to its flame-retardant and low-
smoke characteristics. Standard FPL (non-plenum) and FPLR (riser-rated) cables are not permitted in
plenum spaces .

Document information

Uploaded on
September 10, 2026
Number of pages
30
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$21.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
13
Followers
1
Items
819
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions