1. What is the primary purpose of contractor licensing in
Alabama?
A. To eliminate competition
B. To protect the public by ensuring contractors meet
established requirements
C. To guarantee every project makes a profit
D. To regulate material prices
Rationale: Licensing establishes minimum competency and
accountability requirements for contractors performing
regulated work.
Correct Answer: B. To protect the public by ensuring
contractors meet established requirements
2. Before beginning regulated contracting work, a contractor
should first verify that:
A. The customer has purchased materials
B. The contractor has the appropriate license and authorization
C. The project will take less than 30 days
D. The contractor has hired a subcontractor
,Rationale: Contractors must make sure their license
classification and authorization cover the work being
undertaken.
Correct Answer: B. The contractor has the appropriate license
and authorization
3. Which document generally defines the scope of work, price,
and obligations of the parties?
A. Contract
B. Receipt
C. Delivery ticket
D. Safety poster
Rationale: A properly written contract establishes the rights
and responsibilities of the contractor and owner.
Correct Answer: A. Contract
4. What is the best reason for having changes to a
construction project documented in writing?
A. To increase paperwork
B. To establish a clear record of the agreed change
C. To avoid paying employees
D. To eliminate inspections
Rationale: Written change orders reduce disputes by
identifying changes in scope, price, and schedule.
,Correct Answer: B. To establish a clear record of the agreed
change
5. Which item is most important when preparing a
construction estimate?
A. Guessing the labor cost
B. Identifying labor, material, equipment, overhead, and other
applicable costs
C. Using the lowest material price available without checking
quality
D. Ignoring waste
Rationale: A reliable estimate accounts for all reasonably
foreseeable project costs.
Correct Answer: B. Identifying labor, material, equipment,
overhead, and other applicable costs
6. What is direct labor?
A. Office rent
B. Insurance premiums
C. Labor directly associated with performing the construction
work
D. Advertising expense
Rationale: Direct labor is the cost of workers performing
activities specifically attributable to the project.
, Correct Answer: C. Labor directly associated with performing
the construction work
7. Which is an example of an overhead expense?
A. Concrete placed in a footing
B. Nails installed in framing
C. Office rent
D. Pipe installed in a building
Rationale: Overhead consists of business operating expenses
that are not directly attributable to a specific construction
activity.
Correct Answer: C. Office rent
8. What is the purpose of a written scope of work?
A. To describe what work is included in the project
B. To eliminate the need for a contract
C. To determine employee vacation time
D. To replace building inspections
Rationale: A clear scope establishes the work the contractor is
obligated to perform.
Correct Answer: A. To describe what work is included in the
project