SECTION 1 — GENERAL ADMINISTRATION
Questions 1–25
1. What is the primary purpose of the International Building Code?
A. To establish minimum requirements for building safety
B. To establish construction material prices
C. To regulate architectural styles
D. To establish contractor profit margins
Answer: A
Rationale: The IBC establishes minimum requirements intended to
safeguard public health, safety and welfare in the built environment.
2. Who generally has authority to administer and enforce the building
code within a jurisdiction?
A. Building official
B. General contractor
C. Property owner
D. Architect
Answer: A
,Rationale: The building official is responsible for administering and
enforcing the adopted building code, subject to the authority granted
by the jurisdiction.
3. A building permit is primarily intended to:
A. Provide authorization to perform regulated construction
B. Guarantee construction quality
C. Establish property ownership
D. Replace approved construction documents
Answer: A
Rationale: A permit authorizes regulated construction work after the
applicable requirements have been reviewed and satisfied.
4. During an inspection, the inspector discovers construction that
differs materially from the approved plans. What should the inspector
do first?
A. Document the discrepancy and determine whether revised approval
is required
B. Ignore the difference if the contractor approves it
C. Automatically approve the change
D. Order demolition of the entire building
Answer: A
Rationale: Material deviations should be documented and evaluated
against the approved construction documents and applicable code
requirements.
,5. Which document normally communicates the approved design
intent for a permitted project?
A. Approved construction documents
B. Contractor's invoice
C. Material delivery receipt
D. Equipment warranty
Answer: A
Rationale: Approved construction documents establish the design
information against which construction is inspected.
6. An inspector should generally verify that required special
inspections are:
A. Identified and performed as required
B. Eliminated by the general contractor
C. Performed only after occupancy
D. Replaced by a manufacturer's warranty
Answer: A
Rationale: Special inspections are required for specific work identified
by the code and approved construction documents.
7. Which situation most clearly requires the inspector to consult the
approved construction documents?
, A. The field installation differs from the approved structural detail
B. The contractor requests payment
C. The owner changes insurance companies
D. A supplier changes its delivery vehicle
Answer: A
Rationale: Approved drawings and specifications provide the basis for
determining whether construction conforms to the permitted design.
8. What is the best reason for documenting inspection findings?
A. To establish a clear record of compliance and deficiencies
B. To increase project cost
C. To replace the building permit
D. To eliminate the need for future inspections
Answer: A
Rationale: Inspection records provide evidence of observations,
corrections, approvals and deficiencies.
9. An alternate material, design or method is proposed. What is
generally required before it can be accepted?
A. Approval by the building official under the applicable code provisions
B. Approval only by the subcontractor
C. Approval by the material supplier alone
D. No review if the material is expensive
Answer: A
Complete Practice Questions, Correct Answers & Detailed
Rationales
SECTION 1 — GENERAL ADMINISTRATION
Questions 1–25
1. What is the primary purpose of the International Building Code?
A. To establish minimum requirements for building safety
B. To establish construction material prices
C. To regulate architectural styles
D. To establish contractor profit margins
Answer: A
Rationale: The IBC establishes minimum requirements intended to
safeguard public health, safety and welfare in the built environment.
2. Who generally has authority to administer and enforce the building
code within a jurisdiction?
A. Building official
B. General contractor
C. Property owner
D. Architect
Answer: A
,Rationale: The building official is responsible for administering and
enforcing the adopted building code, subject to the authority granted
by the jurisdiction.
3. A building permit is primarily intended to:
A. Provide authorization to perform regulated construction
B. Guarantee construction quality
C. Establish property ownership
D. Replace approved construction documents
Answer: A
Rationale: A permit authorizes regulated construction work after the
applicable requirements have been reviewed and satisfied.
4. During an inspection, the inspector discovers construction that
differs materially from the approved plans. What should the inspector
do first?
A. Document the discrepancy and determine whether revised approval
is required
B. Ignore the difference if the contractor approves it
C. Automatically approve the change
D. Order demolition of the entire building
Answer: A
Rationale: Material deviations should be documented and evaluated
against the approved construction documents and applicable code
requirements.
,5. Which document normally communicates the approved design
intent for a permitted project?
A. Approved construction documents
B. Contractor's invoice
C. Material delivery receipt
D. Equipment warranty
Answer: A
Rationale: Approved construction documents establish the design
information against which construction is inspected.
6. An inspector should generally verify that required special
inspections are:
A. Identified and performed as required
B. Eliminated by the general contractor
C. Performed only after occupancy
D. Replaced by a manufacturer's warranty
Answer: A
Rationale: Special inspections are required for specific work identified
by the code and approved construction documents.
7. Which situation most clearly requires the inspector to consult the
approved construction documents?
, A. The field installation differs from the approved structural detail
B. The contractor requests payment
C. The owner changes insurance companies
D. A supplier changes its delivery vehicle
Answer: A
Rationale: Approved drawings and specifications provide the basis for
determining whether construction conforms to the permitted design.
8. What is the best reason for documenting inspection findings?
A. To establish a clear record of compliance and deficiencies
B. To increase project cost
C. To replace the building permit
D. To eliminate the need for future inspections
Answer: A
Rationale: Inspection records provide evidence of observations,
corrections, approvals and deficiencies.
9. An alternate material, design or method is proposed. What is
generally required before it can be accepted?
A. Approval by the building official under the applicable code provisions
B. Approval only by the subcontractor
C. Approval by the material supplier alone
D. No review if the material is expensive
Answer: A