SECTION 1 — ADMINISTRATION, SCOPE & GENERAL CODE
APPLICATION
Questions 1–35
1. What is the primary responsibility of a plans examiner?
A. Approve construction materials after installation
B. Review submitted construction documents for code compliance
C. Supervise the contractor's employees
D. Inspect completed landscaping
Answer: B
Rationale: A plans examiner evaluates drawings, specifications,
calculations, and related documents to determine whether the
proposed work complies with applicable codes. Construction
supervision and material installation are generally outside the plans
examiner's role.
2. When reviewing construction documents, the plans examiner
should first determine which of the following?
A. The contractor's profit margin
B. The building's intended use and occupancy classification
C. The manufacturer's warranty
D. The construction schedule
,Answer: B
Rationale: The proposed use and occupancy classification establish
many subsequent code requirements, including construction type,
egress, fire protection, accessibility, and occupant-load provisions.
3. Which document generally provides the broadest description of the
proposed building project?
A. Door schedule
B. Site plan
C. Finish schedule
D. Equipment cut sheet
Answer: B
Rationale: A site plan identifies the building's relationship to the
property, site access, setbacks, adjacent conditions, and other site
information. The other documents address much narrower aspects of
construction.
4. A plans examiner identifies a discrepancy between the architectural
drawings and structural drawings. What is the best initial action?
A. Ignore the discrepancy
B. Approve whichever drawing was submitted first
C. Request clarification or correction from the applicant
D. Automatically reject the entire application
Answer: C
,Rationale: Conflicting construction documents must be clarified so the
approved documents accurately represent the proposed work.
Automatic approval or rejection without resolving the conflict is
inappropriate.
5. Which factor is most important when determining the applicable
code provisions for a proposed building?
A. Building color
B. Occupancy and use
C. Contractor preference
D. Property owner's profession
Answer: B
Rationale: Occupancy and use affect numerous code requirements,
including egress, fire-resistance ratings, occupant load, accessibility, and
allowable building characteristics.
6. What is the purpose of an occupancy classification?
A. To establish the building's property-tax value
B. To identify the hazards and activities associated with the building's
use
C. To determine the contractor's license classification
D. To establish the project's financing method
Answer: B
, Rationale: Occupancy classification groups buildings according to their
intended use and associated hazards. Those classifications then drive
many life-safety requirements.
7. A building contains multiple distinct uses. What should the plans
examiner evaluate?
A. Only the largest room
B. Whether the uses qualify as accessory, nonseparated, or separated
occupancies as applicable
C. Only the use listed on the application cover sheet
D. Only the use of the first floor
Answer: B
Rationale: Multiple uses can be regulated through different occupancy
approaches. The examiner must determine the appropriate code
treatment rather than assuming the entire building has one
classification.
8. Which item is normally considered part of the construction
documents?
A. Contractor's personal résumé
B. Architectural plans
C. Contractor's vacation schedule
D. Property owner's bank statement
Answer: B
Questions, Correct Answers & Detailed Rationales
SECTION 1 — ADMINISTRATION, SCOPE & GENERAL CODE
APPLICATION
Questions 1–35
1. What is the primary responsibility of a plans examiner?
A. Approve construction materials after installation
B. Review submitted construction documents for code compliance
C. Supervise the contractor's employees
D. Inspect completed landscaping
Answer: B
Rationale: A plans examiner evaluates drawings, specifications,
calculations, and related documents to determine whether the
proposed work complies with applicable codes. Construction
supervision and material installation are generally outside the plans
examiner's role.
2. When reviewing construction documents, the plans examiner
should first determine which of the following?
A. The contractor's profit margin
B. The building's intended use and occupancy classification
C. The manufacturer's warranty
D. The construction schedule
,Answer: B
Rationale: The proposed use and occupancy classification establish
many subsequent code requirements, including construction type,
egress, fire protection, accessibility, and occupant-load provisions.
3. Which document generally provides the broadest description of the
proposed building project?
A. Door schedule
B. Site plan
C. Finish schedule
D. Equipment cut sheet
Answer: B
Rationale: A site plan identifies the building's relationship to the
property, site access, setbacks, adjacent conditions, and other site
information. The other documents address much narrower aspects of
construction.
4. A plans examiner identifies a discrepancy between the architectural
drawings and structural drawings. What is the best initial action?
A. Ignore the discrepancy
B. Approve whichever drawing was submitted first
C. Request clarification or correction from the applicant
D. Automatically reject the entire application
Answer: C
,Rationale: Conflicting construction documents must be clarified so the
approved documents accurately represent the proposed work.
Automatic approval or rejection without resolving the conflict is
inappropriate.
5. Which factor is most important when determining the applicable
code provisions for a proposed building?
A. Building color
B. Occupancy and use
C. Contractor preference
D. Property owner's profession
Answer: B
Rationale: Occupancy and use affect numerous code requirements,
including egress, fire-resistance ratings, occupant load, accessibility, and
allowable building characteristics.
6. What is the purpose of an occupancy classification?
A. To establish the building's property-tax value
B. To identify the hazards and activities associated with the building's
use
C. To determine the contractor's license classification
D. To establish the project's financing method
Answer: B
, Rationale: Occupancy classification groups buildings according to their
intended use and associated hazards. Those classifications then drive
many life-safety requirements.
7. A building contains multiple distinct uses. What should the plans
examiner evaluate?
A. Only the largest room
B. Whether the uses qualify as accessory, nonseparated, or separated
occupancies as applicable
C. Only the use listed on the application cover sheet
D. Only the use of the first floor
Answer: B
Rationale: Multiple uses can be regulated through different occupancy
approaches. The examiner must determine the appropriate code
treatment rather than assuming the entire building has one
classification.
8. Which item is normally considered part of the construction
documents?
A. Contractor's personal résumé
B. Architectural plans
C. Contractor's vacation schedule
D. Property owner's bank statement
Answer: B