• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 8 pages
Exam (elaborations)

DBIA Principles of Design-Build, Post Award & Contracts 2026/2027 | Study Guide

Document preview thumbnail
Preview 2 out of 8 pages

Prepare for the DBIA Certification Exam with this latest-release 2026/2027 study resource covering essential principles of Design-Build Done Right®, post-award project execution, design-build contracts, risk management, procurement, collaboration, and project delivery practices. The material is designed to support focused review of key DBIA certification topics and help construction professionals strengthen their understanding of design-build principles, contracting strategies, and post-award project management. DBIA’s current certification exam covers Guiding Principles, Design-Build foundations, procurement, contracting, and project execution.

Content preview

DBIA Principles of Design-Build and Post Award & Contracts

Miller Act 1935 Federal Government passed bond requiring payment and performance bonds on all
public works, what year?



Brooks Bill 1972 Bill directing A/E's selected on qualifications, what year?




Clinger Cohen Act/Defense Procurement Reform Act 1996 Allows all federal agencies to utilize Design-Build. Prior to that no enabling
legislation existed allowing Design-Build.



Standard of Care The level of quality that any average Design Professional would be able to perform
given the circumstances.



Design Bid Build Slowest Project Delivery method, linear in nature, prescriptive (owner knows what
they want),



Multi Prime Project Delivery - Many contracts through Owner




CM at Risk Project Delivery method allowing the contractor to come on board very early in
design for preconstruction services yet maintains separation between Designer and
Builder contractually.


Design Build Fastest Project Delivery method, fast tracking possible overlapping design with
construction utilizing incremental packages.



Low Bid Procurement Method - Most Familiar




Negotiated (Qualifications Based) Procurement Method - Common for A/E




Best Value Procurement Method - Qualifications and Price




Sole Source Procurement Method - Direct




Lump Sum Contract Format w/ agreed upon fixed price




Cost Plus Fee Contract Format - contractor reimbursed for actual cost plus an agreed upon
percentage



GMP (Guaranteed Maximum Price) Contract Format - Combines Cost-Plus & Lump-Sum, contractor reimbursed for
actual cost plus a fee only up to a certain amount.

, DBIA Principles of Design-Build and Post Award & Contracts

Unit Price Contract Format - cost per piece




Target Price Contract Format - established cost/benchmark determined jointly by project team.




Trust, Flexibility Successful Design Build requires _____ & _______ between participants




Hammurabi Singular responsibility for both design & construction was first codified by ____




Bridging Documents Owner provided items such as 20% design or more and provides prescriptive specs
at RFP.



Spearin Doctrine Owner is responsible for implied warranties in the sufficiency of the specifications.




Performance Requirements ____ ____ should identify end results.




Design Build Single point of responsibility for both design & construction is an attribute of what
delivery method?



Substantiation The process of checking milestones along the way for completeness.




Prescriptive Owner requiring specific products or methods be instituted by DB team in order to
achieve desired performance.



False T/F Detailed estimating is the Building systems approach to estimating




False T/F feasibility estimate is cost model and establishes budget for project




True T/F key element of quality assurance is keeping communication lines open between
owner and DB



True T/F in Design/cost relationship of DB, the constructor establishes design
parameters for architect



False T/F trust is most important thing for DB

Document information

Uploaded on
September 8, 2026
Number of pages
8
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$9.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TestproCenter
4.4
(21)
Sold
80
Followers
0
Items
3427
Last sold
23 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions