PETROBOWL UPDATED ACTUAL QUESTIONS AND
CORRECT ANSWERS
Question:
LACT Unit
Answer:
This system provides for the automatic measurement, sampling, and transfer of oil from the lease location
into a pipeline.
Question:
charged zone
Answer:
A formation interval that has become overpressured by the injection of drilling or treatment fluids
Question:
Conductor Casing
Answer:
The widest type of casing. They are cemented to prevent drilling fluids from circulation outside the casing
causing surface erosion
Question:
bridge
Answer:
A wellbore obstruction caused by a buildup of material such as scale, wellbore fill or cuttings that can
restrict access.
Question:
Cement Squeeze
Answer:
The process of using pump pressure to injecft cement into a problematic void space at a desired location in
a well.
Question:
grasshopper
Answer:
Vertical pipe arrangement on the outside of an atmospheric crude oil tank that controls internal water-oil
interfacial level by manipulation of its height
Question:
Tongs
Answer:
Large capacity self locking wrenches used to grip drillstring components and apply torque.
Question:
whipstock
, Answer:
An inclined wedge placed in a wellbore to force the drill bit in a direction away from the wellbore axis
Question:
kick
Answer:
A flow of formation fluids into the wellbore during drilling operations
Question:
dry gas
Answer:
Gas produced from a well that produces little or no condensate or reservior fluids.
Question:
cellar
Answer:
A dug out area possibly lined with wood, cement, or vary large diameter pipe located below the rig.
Question:
sour gas
Answer:
natural gas containing H2S
Question:
dynamic positioning
Answer:
A station keeping system for floating unites which uses thrusters to compensate wind wave and current
forces.
Question:
BOP
Answer:
A large valve at the top of a well that may be closed if the drilling crew loses control of the formation
fluids
Question:
derrick
Answer:
The structure used to support teh crown blocks and drill strings of a drilling rig
Question:
deadline anchor
Answer:
An equipment placed on the deadline before it is reeled on the drum which measures the tensile load on the
drill lines and serves as a fixed end
CORRECT ANSWERS
Question:
LACT Unit
Answer:
This system provides for the automatic measurement, sampling, and transfer of oil from the lease location
into a pipeline.
Question:
charged zone
Answer:
A formation interval that has become overpressured by the injection of drilling or treatment fluids
Question:
Conductor Casing
Answer:
The widest type of casing. They are cemented to prevent drilling fluids from circulation outside the casing
causing surface erosion
Question:
bridge
Answer:
A wellbore obstruction caused by a buildup of material such as scale, wellbore fill or cuttings that can
restrict access.
Question:
Cement Squeeze
Answer:
The process of using pump pressure to injecft cement into a problematic void space at a desired location in
a well.
Question:
grasshopper
Answer:
Vertical pipe arrangement on the outside of an atmospheric crude oil tank that controls internal water-oil
interfacial level by manipulation of its height
Question:
Tongs
Answer:
Large capacity self locking wrenches used to grip drillstring components and apply torque.
Question:
whipstock
, Answer:
An inclined wedge placed in a wellbore to force the drill bit in a direction away from the wellbore axis
Question:
kick
Answer:
A flow of formation fluids into the wellbore during drilling operations
Question:
dry gas
Answer:
Gas produced from a well that produces little or no condensate or reservior fluids.
Question:
cellar
Answer:
A dug out area possibly lined with wood, cement, or vary large diameter pipe located below the rig.
Question:
sour gas
Answer:
natural gas containing H2S
Question:
dynamic positioning
Answer:
A station keeping system for floating unites which uses thrusters to compensate wind wave and current
forces.
Question:
BOP
Answer:
A large valve at the top of a well that may be closed if the drilling crew loses control of the formation
fluids
Question:
derrick
Answer:
The structure used to support teh crown blocks and drill strings of a drilling rig
Question:
deadline anchor
Answer:
An equipment placed on the deadline before it is reeled on the drum which measures the tensile load on the
drill lines and serves as a fixed end