Who can issue a stop work order? -Correct Answer -c.) building official Work that usually requires special inspection in the field but is instead performed off-site on the premises of a fabricator during fabrication... -Correct Answer -c.) does not require special inspection if the fabricator is registered and approved All of the following should be on a daily report except... -Correct Answer -a.) astm standard for any testing performed. The final report shall be submitted... -Correct Answer -c.) at a point in time agreed upon by the owner and building official Discrepancies or nonconforming items shall be brought to the immediate attention of the -Correct Answer -a.) contractor Who has the authority to enforce the special inspection provisions on a job? -Correct Answer -a.) contractor The type and extent of each special inspection and each test shall be located in... -Correct Answer -d.) the statement of special inspections contractor -Correct Answer -A person or company responsible for the construction work. building official -Correct Answer -The individual charged with the legal authority to review plans and specifications for code compliance. approved inspection agency -Correct Answer -An organization authorized to conduct inspections and tests during construction. registered design professional -Correct Answer -A qualified individual responsible for submitting revised plans to the building official for approval. special inspector -Correct Answer -An individual who checks compliance with specific codes and standards on-site. preconstruction conference meeting -Correct Answer -A meeting aimed at reviewing the Special Inspection agreement and schedule requirements. final report -Correct Answer -A document submitted to the building department by the inspection agency or special inspector. discrepancies -Correct Answer -Issues that must be brought to the immediate attention of the contractor for correction. quality assurance -Correct Answer -Another name for special inspection. statement of special inspections -Correct Answer -A document written by the registered design professional outlining inspection duties. access to approved construction plans -Correct Answer -A responsibility of the contractor to provide to the special inspector.

Content preview

ICC General Requirements Exam
Questions & Answers Graded A 2026
Who can issue a stop work order? -Correct Answer ✔-c.) building official


Work that usually requires special inspection in the field but is instead performed off-site
on the premises of a fabricator during fabrication... -Correct Answer ✔-c.) does not
require special inspection if the fabricator is registered and approved



All of the following should be on a daily report except... -Correct Answer ✔-a.) astm
standard for any testing performed.



The final report shall be submitted... -Correct Answer ✔-c.) at a point in time agreed
upon by the owner and building official


Discrepancies or nonconforming items shall be brought to the immediate attention of
the -Correct Answer ✔-a.) contractor


Who has the authority to enforce the special inspection provisions on a job? -Correct
Answer ✔-a.) contractor


The type and extent of each special inspection and each test shall be located in... -
Correct Answer ✔-d.) the statement of special inspections



contractor -Correct Answer ✔-A person or company responsible for the construction
work.

,building official -Correct Answer ✔-The individual charged with the legal authority to
review plans and specifications for code compliance.



approved inspection agency -Correct Answer ✔-An organization authorized to conduct
inspections and tests during construction.


registered design professional -Correct Answer ✔-A qualified individual responsible for
submitting revised plans to the building official for approval.



special inspector -Correct Answer ✔-An individual who checks compliance with specific
codes and standards on-site.



preconstruction conference meeting -Correct Answer ✔-A meeting aimed at reviewing
the Special Inspection agreement and schedule requirements.



final report -Correct Answer ✔-A document submitted to the building department by
the inspection agency or special inspector.



discrepancies -Correct Answer ✔-Issues that must be brought to the immediate
attention of the contractor for correction.



quality assurance -Correct Answer ✔-Another name for special inspection.



statement of special inspections -Correct Answer ✔-A document written by the
registered design professional outlining inspection duties.



access to approved construction plans -Correct Answer ✔-A responsibility of the
contractor to provide to the special inspector.

,structural observations -Correct Answer ✔-Inspections performed by an engineer
employed by the owner.



nonconformance inspection report -Correct Answer ✔-A report that should not include
the name of the project owner.



approved agency -Correct Answer ✔-The entity that keeps records of special inspections
and tests performed during construction.



complex materials -Correct Answer ✔-One of the categories included in special
inspection.



critical structural building components -Correct Answer ✔-Elements that require special
inspection due to their importance.



life or fire safety systems -Correct Answer ✔-Systems that are included in special
inspection requirements.


competency of the special inspector -Correct Answer ✔-Determined by the building
official for the work being performed.



Statement of Special Inspections -Correct Answer ✔-Prepared by the RDP in charge and
submitted with the permit application.



funding special inspection services -Correct Answer ✔-The responsibility that may fall on
various parties involved in the construction project.

, RDP in responsible charge -Correct Answer ✔-The individual responsible for overseeing
the project and ensuring compliance with regulations.



Building official -Correct Answer ✔-The authority who has the right to waive special
inspection requirements for work deemed minor.


Approved agency -Correct Answer ✔-An agency that the contractor is permitted to
employ when the contractor is also the owner.



Non conforming item -Correct Answer ✔-An item that, if not resolved in a timely
manner, should be reported to the RDP in responsible charge and the building official.



Special inspector's progress reports -Correct Answer ✔-Reports that should contain all
information except recommendations for structural improvements.



Final inspection -Correct Answer ✔-The inspection performed by the building official
after reviewing and approving the final special inspection report.



Special inspector -Correct Answer ✔-The individual who notifies the contractor upon
arrival to the job site.



Final report submission -Correct Answer ✔-The point at which the special inspection
approved agency submits their final report, agreed upon by the owner and the building
official prior to the project start.



Structural observations -Correct Answer ✔-Observations that may require separate
special inspections according to the International Building Code.

Document information

Uploaded on
September 7, 2026
Number of pages
44
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
PossibleA
3.9
(152)
Sold
1076
Followers
651
Items
14028
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions