Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 169 pages
Exam (elaborations)

ICC Spray-Applied Fireproofing Special Inspector Certification – Full-Length Practice Examination

Document preview thumbnail
Preview 4 out of 169 pages

ICC Spray-Applied Fireproofing Special Inspector Certification – Full-Length Practice Examination

Content preview

Page 1 of 169




ICC Spray-Applied Fireproofing Special
Inspector Certification – Full-Length Practice
Examination Practice Questions With Verified
Answers & Rationales LATEST UPDATE THIS
YEAR
ICC Spray-Applied Fireproofing Special Inspector Certification – Full-Length Practice
Examination


EXAM OVERVIEW

Category Details


Certifying Body International Code Council (ICC)


Exam ID 86 – Spray-applied Fireproofing Special Inspector


Exam Format 40 multiple-choice questions


Time Limit 1.5 hours (90 minutes)


Two modules: General Requirements (25 questions, 1 hour) & Codes &
Exam Structure
Plans (30 questions, 1.5 hours)


Passing Score Scaled score of 75


Exam Type Open book


Exam Fee $210+ through Pearson VUE/PRONTO

,Page 2 of 169


Category Details


Primary IBC Chapter 17 (Special Inspections), IBC Chapter 7 (Fire-Resistance),
References ASTM E605, ASTM E736, ASTM E119, ICC-ES AC10


Certification valid for 3 years; renewal requires continuing education or re-
Renewal
examination



EXAM COVERAGE SUMMARY
General Requirements & Inspection Basics (25%) – Duties and responsibilities of the Special
Inspector, notification of discrepancies, inspection reports and documentation, IBC Chapter 17
requirements, statement of special inspections, qualifications and independence
Materials, Preparation & Application (25%) – Material identification and storage, substrate
preparation (clean, dry, free of oil, grease, loose rust, and mill scale), application techniques
and equipment, manufacturer's instructions, environmental conditions (substrate temperature
minimum 40°F)
Testing & Quality Control (25%) – Thickness measurement (ASTM E605), density testing,
bond/cohesion strength (ASTM E736), acceptance criteria, minimum allowable thickness (80%
of specified), test locations and frequencies
Codes, Standards & Documentation (25%) – IBC Chapter 7 fire-resistance requirements, ASTM
E119 fire testing, ASTM E84 surface burning, ICC-ES AC10, reporting non-conformances, final
summary reports


SECTION 1: GENERAL REQUIREMENTS AND INSPECTION BASICS (Questions 1–62)
1. What is the primary role of the Special Inspector according to IBC Chapter 17?



A) To design fireproofing systems for structural members


B) To oversee the quality and compliance of fireproofing installation

,Page 3 of 169


C) To approve the structural steel design before construction begins


D) To determine the required thickness of SFRM based on building height



Answer: B



Rationale: The Special Inspector's primary role is to verify that sprayed fire-resistant materials


(SFRM) applied to structural members comply with the approved plans, specifications, and


applicable provisions of the building code.




2. According to IBC Chapter 17, special inspection for sprayed fire-resistant materials is:



A) Optional, depending on the building height


B) Required only for buildings over 75 feet tall


C) Mandatory continuous special inspection


D) Required only when specified by the architect



Answer: C

, Page 4 of 169


Rationale: IBC Section 1705.14 mandates continuous special inspection while SFRM is being


applied to ensure real-time compliance with thickness, density, and bond strength requirements.




3. The Spray-applied Fireproofing Special Inspector is responsible for:



A) Designing the fireproofing system


B) Enforcing construction details contained in approved plans and specifications


C) Manufacturing the fireproofing materials


D) Determining the building's fire-resistance rating



Answer: B



Rationale: The Special Inspector is responsible for enforcing the construction details contained in


the approved plans and specifications for sprayed fire-resistant materials.




4. Which document provides the primary basis for understanding fire-resistance rating


requirements for structural members?

Document information

Uploaded on
September 6, 2026
Number of pages
169
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$29.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
5
Followers
0
Items
570
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions