Question:
1. What is the purpose of a TO?
Answer:
Official means of disseminating technical info, instructions, safety procedures
pertaining to the operation, maintenance, and modification of equipment.
Question:
2. What determines the layout of a joint use manual?
Answer:
Layout is determined by the branch of service that developed the publication
Question:
3. What are the 4 types of TO's?
Answer:
1) Operations maintenance
2) Field maintenance instruction
3) Overhaul instruction
4) Illustrated parts breakdown (IPB)
Question:
4. Which type of TO describes advanced levels of
maintenance at your location?
Answer:
Field Maintenance Instruction (dash 2)
Question:
5. The pictures in a dash 4 are in exploded view. What does
this mean?
Answer:
All components are pulled apart and placed in the drawing in order of installation
,Question:
6. What are the most common abbreviated TO's?
Answer:
Inspection work cards
Lubrication Charts
Checklists
Question:
7. What are the 6 types of TCTO's (Time Compliance
Technical Order)?
Answer:
1) Immediate action
2) Urgent action
3) Routine action
4) Inspection
5) Record
6) Interim
Question:
8. How long do you have to comply with the work identified
in urgent TCTO's?
Answer:
10 days
Question:
9. What type of equipment is identified by TO reference
number 40W4?
Answer:
Water purification equipment
Question:
10. What is the purpose of identifying problems in a TO?
Answer:
Prevent others from completing tasks wrong
Question:
11. What is the first step to make a TO change?
Answer:
Discuss concerns with your NCO's
, Question:
12. What form do you use to make changes to a TO?
Answer:
AFTO Form 22
Question:
13. What must the HWMP (Hazardous Waste Management
Plan) reflect?
Answer:
Current regulatory requirements and installation hazardous waste activities with
annual updates and approvals by the installation EPC (Environmental Protection
Committee)
Question:
14. What is a waste stream?
Answer:
Movement of hazardous waste from its generator to its disposal including all
stops along the way (all waste streams must be identified)
Question:
15. What does the hazardous waste profile sheet provide?
Answer:
Details of each hazardous waste stream
Question:
16. What is the accumulation point?
Answer:
A common place to store hazardous waste before disposal
Question:
17. How much hazardous waste can a satellite accumulate
point hold?
Answer:
55 gallons
Question:
18. What is the 1st thing you need to do when you develop a
new hazardous waste profile?
Answer:
Find out if the waste is hazardous
SAFETY RESPONSIBILITY UPDATED ACTUAL
QUESTIONS AND CORRECT ANSWERS
Question:
1. What is the purpose of a TO?
Answer:
Official means of disseminating technical info, instructions, safety procedures
pertaining to the operation, maintenance, and modification of equipment.
Question:
2. What determines the layout of a joint use manual?
Answer:
Layout is determined by the branch of service that developed the publication
Question:
3. What are the 4 types of TO's?
Answer:
1) Operations maintenance
2) Field maintenance instruction
3) Overhaul instruction
4) Illustrated parts breakdown (IPB)
Question:
4. Which type of TO describes advanced levels of
maintenance at your location?
Answer:
Field Maintenance Instruction (dash 2)
Question:
5. The pictures in a dash 4 are in exploded view. What does
this mean?
Answer:
All components are pulled apart and placed in the drawing in order of installation
,Question:
6. What are the most common abbreviated TO's?
Answer:
Inspection work cards
Lubrication Charts
Checklists
Question:
7. What are the 6 types of TCTO's (Time Compliance
Technical Order)?
Answer:
1) Immediate action
2) Urgent action
3) Routine action
4) Inspection
5) Record
6) Interim
Question:
8. How long do you have to comply with the work identified
in urgent TCTO's?
Answer:
10 days
Question:
9. What type of equipment is identified by TO reference
number 40W4?
Answer:
Water purification equipment
Question:
10. What is the purpose of identifying problems in a TO?
Answer:
Prevent others from completing tasks wrong
Question:
11. What is the first step to make a TO change?
Answer:
Discuss concerns with your NCO's
, Question:
12. What form do you use to make changes to a TO?
Answer:
AFTO Form 22
Question:
13. What must the HWMP (Hazardous Waste Management
Plan) reflect?
Answer:
Current regulatory requirements and installation hazardous waste activities with
annual updates and approvals by the installation EPC (Environmental Protection
Committee)
Question:
14. What is a waste stream?
Answer:
Movement of hazardous waste from its generator to its disposal including all
stops along the way (all waste streams must be identified)
Question:
15. What does the hazardous waste profile sheet provide?
Answer:
Details of each hazardous waste stream
Question:
16. What is the accumulation point?
Answer:
A common place to store hazardous waste before disposal
Question:
17. How much hazardous waste can a satellite accumulate
point hold?
Answer:
55 gallons
Question:
18. What is the 1st thing you need to do when you develop a
new hazardous waste profile?
Answer:
Find out if the waste is hazardous