Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 17 pages
Exam (elaborations)

Exam 2 study guide - etm 320 comprehensive Questions and Answers with 100% Correct Answers | Latest Version Already Graded A+

Document preview thumbnail
Preview 3 out of 17 pages

Exam 2 study guide - etm 320 comprehensive Questions and Answers with 100% Correct Answers | Latest Version Already Graded A+

Content preview

Exam 2 study guide - etm 320 comprehensive Questions and Answers with
100% Correct Answers | Latest Version Already Graded A+



Which of the following is not another name for stage gates?

a) Phase gates

b) Quality gates

c) Transition points

d) Toll gates - (ANSWER)c) Transition points



This element of the project plan, at a high-level, this covers potential problems as well as potential lucky
breaks that could affect the project.

a) Schedule

b) Resources

c) Risk management plans

d) Evaluation methods - (ANSWER)c) Risk management plans



__________is an approach that breaks the planning task down into the activities that must be done in
each managerial level of the organization. Typically, the upper level sets the objectives for the next lower
level.

a) Strategic planning

b) Organizational planning

c) Hierarchical planning

d) Agile planning - (ANSWER)c) Hierarchical planning



Once the project charter is completed and the project approved, a more detailed project plan can be
developed. Which of the following issues is not addressed in the detailed project plan?

a) The process for managing change

b) The salary for the project manager

c) A plan for communicating with and managing stakeholders

d) Establishing the cost baseline for the project - (ANSWER)b) The salary for the project manager

,Exam 2 study guide - etm 320 comprehensive Questions and Answers with
100% Correct Answers | Latest Version Already Graded A+



Project managers can rely on the ____ side of their brain for analytical reasoning and on the _____ side
of their brain for creativity.

a) left, right

b) right, left

c) upper, lower

d) lower, upper - (ANSWER)a) left, right



The physical items to be delivered from a project are called __________.

a) materials lists

b) deliverables

c) milestones

d) risk factors - (ANSWER)b) deliverables



The __________ is a specialized view of the action plan that focuses on who has what responsibility for
each project task.

a) resource histogram

b) linear responsibility chart

c) project team directory

d) scope management plan - (ANSWER)b) linear responsibility chart



A useful tool for facilitating the management of changes to a project's scope is the

a) requirements traceability matrix

b) WBS

c) project charter

d) mind map - (ANSWER)a) requirements traceability matrix



The __________ chart is a tree diagram used to represent a hierarchical plan.

, Exam 2 study guide - etm 320 comprehensive Questions and Answers with
100% Correct Answers | Latest Version Already Graded A+



a) PERT

b) GANTT

c) PMBOK

d) Gozinto - (ANSWER)d) Gozinto



Once the project charter is completed and the project approved, a more detailed project plan can be
developed. Which of the following issues is not addressed in the detailed project plan?

a) Developing a plan for managing the human resources assigned to the project

b) Developing a plan for continuously monitoring and improving project work processes

c) Developing the Work Breakdown Structure

d) Developing a list of skilled workers to hire - (ANSWER)d) Developing a list of skilled workers to hire



Agile IT project teams are typically __________ and located at __________.

a) large, a single site

b) small, multiple sites

c) large, multiple sites

d) small, a single site - (ANSWER)d) small, a single site



The success of the project launch meeting is dependent on the existence of __________.

a) a project charter

b) the project's scope statement

c) a well-defined set of objectives for the project

d) project planning templates - (ANSWER)c) a well-defined set of objectives for the project



Unfortunately, it is all too common for projects to go over budget and/or be completed late. What is the
main reason?

a) An improperly constructed WBS

Document information

Uploaded on
September 5, 2026
Number of pages
17
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$22.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NorKnights
5.0
(501)
Sold
3024
Followers
1
Items
502
Last sold
2 days ago


Reviews from verified buyers




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions