DAU FE 2010 Exam 2 Facility Engineering Life Cycle Support Functions
comprehensive Questions and Answers with 100% Correct Answers | Latest
Version
During the contact administration phase, which functions are the responsibility of facility engineers with
reference to contract modifications? select two that apply. - (ANSWER)Provide technical
recommendations to support requests for subcontract consent
&
Participate in formal and informal design reviews and vendor conferences
The environmental Protection Agency uses the Hazard Ranking System to assess the relative threat
associated with actual or potential releases of hazardous substances and is the primary screening tool
for determining if a site is included on the National Priorities List. - (ANSWER)True
If you are planning an installation custodial contract, which contract format would you expect the
contracting officer to use for the solicitation and contract? - (ANSWER)Uniform Contract Format
When responding to protests of the final award decision, which function is NOT normally performed by
contracting personnel? - (ANSWER)Provide technical evaluation of protests to support government
positions
Commitment accounting is required for Operations & Maintenance accounts. - (ANSWER)False
If your installation's training ranges include habitat of endangered species, as part of Sustainable Range
Management you are required to minimize the effects of operations on the habitat. - (ANSWER)True
The Federal Facilities Compliance Act does not exempt agents, employees, and officers of the U.S. from
personal liability for any civil penalty arisign from acts or omissions within the scope of their official
duties. - (ANSWER)False
Which decision making support system translates user needs into a weapons system or automated
information system. - (ANSWER)Defense Acquisition System
,DAU FE 2010 Exam 2 Facility Engineering Life Cycle Support Functions
comprehensive Questions and Answers with 100% Correct Answers | Latest
Version
When compiling the list of submittals to be requires in the contract, which functions should be
performed by the facility engineers? - (ANSWER)-NOT- Review submittals to determine if the reports are
necessary and if the number of reports is appropriate
-NOT- Ensure approved submittals are referenced in the specifications
Which phase of the PPBE process has a primary purpose to develop affordable Component resource
packages (programs) that cover 5 or 6 years and describe the levels of forces, personnel, and money
required to execute the DoD strategy? - (ANSWER)Programming Phase
As the scope of waste management has come into focus, it has become clear that the preferred manner
of managing waste is to not generate it in the first place. - (ANSWER)True
Which of the following appropriations is not associated with the Annual Funding Policy? -
(ANSWER)Military Construction
Which of the following is not one of the eight critical issues, as defined by DoD, that present challenges
to sustainable range management? - (ANSWER)Growth in size of military ranges
You are working at a U.S. Army Corps of Engineers civil works facility that requires remediation. What
funds would you request to accomplish the remediation? - (ANSWER)-NOT- Civil Works Appropriation
Federal agencies open themselves to lawsuits for improperly implementing proposed mitigations
designed to reduce environmental impacts - (ANSWER)True
What installation document would you consult if you were looking for an inventory of cultural resources,
historic contexts, cultural resource management strategies, and mission requirements? -
(ANSWER)Integrated Cultural Resource Management Plan
, DAU FE 2010 Exam 2 Facility Engineering Life Cycle Support Functions
comprehensive Questions and Answers with 100% Correct Answers | Latest
Version
If you are working at a U.S. Army Corps of Engineers civil works facility, you would request environmental
restoration funds from the Defense Environmental Restoration Program to remediate hazardous
substance sites. - (ANSWER)False
When ensuring competition requirements are met, which function should be performed by contracting
personnel? - (ANSWER)-NOT- Assess past performance histories of potential suppliers
-NOT- Determine qualifications of outside vendors not on the Qualified Bidders List
Identify which one of the following questions that you would expect an expert in the functional area of
Environmental to assist in answering: - (ANSWER)What level of NEPA documentation is required for this
project?
When closing out a contract, which function is the responsibility of facilities engineers? -
(ANSWER)Verify the contract is physically complete
When performing price analysis and preparing for negotiations, which functions should be performed by
facility engineers? - (ANSWER)Identify fact-finding, clarification issues, and recommendations
The installation environmental staff are the persons held accountable for environmental compliance. -
(ANSWER)False
Real estate is acquired through all the following, except: - (ANSWER)By occupying the real estate
(trespassing)
Following contract award, who determines the portion of project performance that has been completed
when calculating the amount of a payment to a contractor? - (ANSWER)Facility engineers
The Critical Path is comprised of those activities with a Total Float of zero? - (ANSWER)True
comprehensive Questions and Answers with 100% Correct Answers | Latest
Version
During the contact administration phase, which functions are the responsibility of facility engineers with
reference to contract modifications? select two that apply. - (ANSWER)Provide technical
recommendations to support requests for subcontract consent
&
Participate in formal and informal design reviews and vendor conferences
The environmental Protection Agency uses the Hazard Ranking System to assess the relative threat
associated with actual or potential releases of hazardous substances and is the primary screening tool
for determining if a site is included on the National Priorities List. - (ANSWER)True
If you are planning an installation custodial contract, which contract format would you expect the
contracting officer to use for the solicitation and contract? - (ANSWER)Uniform Contract Format
When responding to protests of the final award decision, which function is NOT normally performed by
contracting personnel? - (ANSWER)Provide technical evaluation of protests to support government
positions
Commitment accounting is required for Operations & Maintenance accounts. - (ANSWER)False
If your installation's training ranges include habitat of endangered species, as part of Sustainable Range
Management you are required to minimize the effects of operations on the habitat. - (ANSWER)True
The Federal Facilities Compliance Act does not exempt agents, employees, and officers of the U.S. from
personal liability for any civil penalty arisign from acts or omissions within the scope of their official
duties. - (ANSWER)False
Which decision making support system translates user needs into a weapons system or automated
information system. - (ANSWER)Defense Acquisition System
,DAU FE 2010 Exam 2 Facility Engineering Life Cycle Support Functions
comprehensive Questions and Answers with 100% Correct Answers | Latest
Version
When compiling the list of submittals to be requires in the contract, which functions should be
performed by the facility engineers? - (ANSWER)-NOT- Review submittals to determine if the reports are
necessary and if the number of reports is appropriate
-NOT- Ensure approved submittals are referenced in the specifications
Which phase of the PPBE process has a primary purpose to develop affordable Component resource
packages (programs) that cover 5 or 6 years and describe the levels of forces, personnel, and money
required to execute the DoD strategy? - (ANSWER)Programming Phase
As the scope of waste management has come into focus, it has become clear that the preferred manner
of managing waste is to not generate it in the first place. - (ANSWER)True
Which of the following appropriations is not associated with the Annual Funding Policy? -
(ANSWER)Military Construction
Which of the following is not one of the eight critical issues, as defined by DoD, that present challenges
to sustainable range management? - (ANSWER)Growth in size of military ranges
You are working at a U.S. Army Corps of Engineers civil works facility that requires remediation. What
funds would you request to accomplish the remediation? - (ANSWER)-NOT- Civil Works Appropriation
Federal agencies open themselves to lawsuits for improperly implementing proposed mitigations
designed to reduce environmental impacts - (ANSWER)True
What installation document would you consult if you were looking for an inventory of cultural resources,
historic contexts, cultural resource management strategies, and mission requirements? -
(ANSWER)Integrated Cultural Resource Management Plan
, DAU FE 2010 Exam 2 Facility Engineering Life Cycle Support Functions
comprehensive Questions and Answers with 100% Correct Answers | Latest
Version
If you are working at a U.S. Army Corps of Engineers civil works facility, you would request environmental
restoration funds from the Defense Environmental Restoration Program to remediate hazardous
substance sites. - (ANSWER)False
When ensuring competition requirements are met, which function should be performed by contracting
personnel? - (ANSWER)-NOT- Assess past performance histories of potential suppliers
-NOT- Determine qualifications of outside vendors not on the Qualified Bidders List
Identify which one of the following questions that you would expect an expert in the functional area of
Environmental to assist in answering: - (ANSWER)What level of NEPA documentation is required for this
project?
When closing out a contract, which function is the responsibility of facilities engineers? -
(ANSWER)Verify the contract is physically complete
When performing price analysis and preparing for negotiations, which functions should be performed by
facility engineers? - (ANSWER)Identify fact-finding, clarification issues, and recommendations
The installation environmental staff are the persons held accountable for environmental compliance. -
(ANSWER)False
Real estate is acquired through all the following, except: - (ANSWER)By occupying the real estate
(trespassing)
Following contract award, who determines the portion of project performance that has been completed
when calculating the amount of a payment to a contractor? - (ANSWER)Facility engineers
The Critical Path is comprised of those activities with a Total Float of zero? - (ANSWER)True