Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 20 pages
Exam (elaborations)

DBIA Exam 3 – Design-Build Institute of America Comprehensive Certification Practice 2026/2027 Edition – 100 Questions

Document preview thumbnail
Preview 3 out of 20 pages

This document provides a comprehensive 100-question practice resource for DBIA Exam 3, focused on Design-Build Institute of America certification preparation. It covers essential design-build concepts including project delivery, procurement, contracting, collaboration, risk management, project execution, communication, and professional practices. The practice questions are designed to reinforce design-build knowledge, support self-assessment, and improve overall certification exam readiness.

Content preview

DBIA EXAM 3
COMPREHENSIVE CERTIFICATION PRACTICE

Design-Build Institute of America • 2026/2027 Edition • 100 Questions


DBIA EXAM 3
COMPREHENSIVE CERTIFICATION PRACTICE (2026/2027 EDITION)

This comprehensive certification practice examination is aligned with the Design-Build Institute of
America (DBIA) certification exam and the DBIA Manual of Practice / Universal Best Practices. The
official DBIA certification exam is a 100-question computer-based test with a passing score of 72% or
above, covering five domains: Guiding Principles (8%), Foundations of Design-Build Done Right (8%),
Procuring Design-Build Services (30%), Contracting for Design-Build Services (24%), and Executing
Design-Build Projects (30%). This practice exam mirrors that structure with 100 multiple-choice
questions organized into those five sections, each with a complete rationale. Coverage reflects
application- and analysis-heavy design (with ≈75% scenario-based items and ≈25% direct
knowledge items), with four options (A–D) and exactly one correct response per item.

Section Topic Questions

Section 1 Guiding Principles of Design-Build Project Delivery – Single Point of Responsibility,
8 Risk Allocation, DBIA Crede

Section 2 Foundations of Design-Build Done Right – Best Value, Universal Best Practices,8 Progressive Design-Build

Section 3 Procuring Design-Build Services – Two-Phase RFQ/RFP, Shortlisting, Stipends, 30
Evaluation & Selection

Section 4 Contracting for Design-Build Services – Contract Forms, Risk Allocation, GMP, 24
Bonds, Insurance, Changes

Section 5 Executing Design-Build Projects – Integrated Teams, Design Management, BIM/VDC,
30 Quality, Closeout

TOTAL 100


How to use this exam: Work through the sections in order, marking your answers. Each item shows
four options (A–D) with exactly one correct response, followed by the answer and a rationale. A
consolidated answer key appears at the end for quick scoring. Aim for at least 72% correct (72 of
100) to mirror the official DBIA passing standard.

,DBIA EXAM Comprehensive Certification Practice (2026/2027)




Section 1: Guiding Principles of Design-Build Project Delivery – Single Point of
Responsibility, Risk Allocation, DBIA Credential
Q1: DBIA is the acronym for which organization?
A. Design-Build Institute of America [CORRECT]
B. Design-Bid-Build Industry Association
C. Department of Building and Infrastructure Administration
D. Design-Build Institute of Architects
Correct Answer: A
Rationale: DBIA stands for the Design-Build Institute of America, the organization defining and promoting
design-build best practices.

Q2: Under design-build project delivery, the owner typically enters into how many prime contract(s) for
design and construction?
A. One contract with a single design-build entity [CORRECT]
B. Two separate contracts (designer and constructor)
C. Three contracts (designer, constructor, and CM)
D. No formal contract
Correct Answer: A
Rationale: Design-build is characterized by single point of responsibility: one contract for both design and
construction.

Q3: The 'single point of responsibility' in design-build means the:
A. design-builder is responsible to the owner for both design and construction [CORRECT]
B. owner directly manages every subcontractor
C. architect alone bears all risk
D. construction manager answers to no one
Correct Answer: A
Rationale: The owner looks to one entity, the design-builder, for both design and construction performance.

Q4: Which is a PRIMARY advantage of design-build project delivery?
A. Faster delivery and a single point of responsibility [CORRECT]
B. Guaranteed lowest first cost on every project
C. Elimination of all project risk
D. Owner micromanagement of each trade
Correct Answer: A
Rationale: Design-build enables schedule compression through overlapping design and construction and
consolidates accountability.

Q5: Under traditional design-bid-build delivery, the owner typically holds:
A. separate contracts with the designer and the constructor [CORRECT]
B. a single contract with a design-builder
C. no direct contracts
D. one contract with a construction manager only
Correct Answer: A
Rationale: In DBB the owner contracts separately with a designer and a constructor and coordinates between
them.




Page 2 of 20

, DBIA EXAM Comprehensive Certification Practice (2026/2027)




Q6: A core DBIA guiding principle for project risk is to:
A. allocate each risk to the party best able to manage it [CORRECT]
B. transfer all risk to the owner
C. transfer all risk to the lowest-tier subcontractor
D. ignore risk until it occurs
Correct Answer: A
Rationale: Design-Build Done Right allocates risk to the party best positioned to control and price it.

Q7: The professional credential awarded by DBIA is the:
A. Designated Design-Build Professional (DBIA®) [CORRECT]
B. Certified General Contractor
C. Registered Design Professional
D. Project Management Professional
Correct Answer: A
Rationale: DBIA's credential is the Designated Design-Build Professional (DBIA®).

Q8: DBIA's position on Diversity, Equity and Inclusion (DEI) holds that:
A. DEI is integral to building high-performing teams and is a core principle of best practices [CORRECT]
B. DEI is discouraged in design-build
C. DEI applies only to public owners
D. DEI is unrelated to design-build
Correct Answer: A
Rationale: DBIA formally recognizes DEI as integral to design-build excellence and team performance.

Section 2: Foundations of Design-Build Done Right – Best Value, Universal Best
Practices, Progressive Design-Build
Q9: 'Design-Build Done Right' emphasizes selecting the design-build team based primarily on:
A. qualifications and best value, not low bid [CORRECT]
B. the lowest price only
C. the largest firm size
D. the most aggressive schedule promise
Correct Answer: A
Rationale: Best-value selection weighs qualifications, technical approach, and price rather than price alone.

Q10: DBIA's Universal Best Practices are organized into which three categories?
A. Procurement, Contracting, and Execution [CORRECT]
B. Design, Bid, and Build
C. Initiate, Plan, and Close
D. Estimate, Schedule, and Report
Correct Answer: A
Rationale: DBIA organizes Universal Best Practices into Procurement, Contracting, and Execution practices.

Q11: Early involvement of key trade partners (e.g., MEP, structural, steel) in design-build is encouraged
because it:
A. improves constructability, cost certainty, and schedule reliability [CORRECT]
B. slows the project down
C. reduces team collaboration
D. is prohibited by best practices
Correct Answer: A
Rationale: Early trade partner input surfaces constructability issues when changes are least costly.


Page 3 of 20

Document information

Uploaded on
September 4, 2026
Number of pages
20
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$14.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
winnieolisa
1.0
(1)
Sold
5
Followers
0
Items
253
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions