PMT 360 Test 1 outlined Questions with correct Answers.

Document preview thumbnail
Preview 4 out of 36 pages

PMT 360 Test 1 outlined Questions with correct Answers.

Content preview

PMT 360 Test 1 outlined Questions with
correct Answers

,Following The MDD... - CORRECT ANSThe MDA determines entry point into the acquisition management
system



What is the DoD Information Network (DoDIN)? - CORRECT ANSThe globally interconnected set of
information capabilities for collecting, processing, storing, disseminating and managing information on
demand



Who is in charge of the WIPTs and is responsible for the program - CORRECT ANSPM



What ensures that new systems are "ready" to become a functioning element within the DoDI -
CORRECT ANSNR-KPP



What serves as a guide for the development of architectures? - CORRECT ANSDoD Architecture
Framework (DoDAF)



What does the DoDAF provide? - CORRECT ANSProvides the guidance and rules for developing,
representing, and understanding architectures based on a common denominator across DoD, Joint, and
multinational boundaries



What does an MOA cover at a minimum? - CORRECT ANSAt a minimum, the MOA covers key
issues/areas, specifically, system requirements, funding, manpower, Capability Development Document

(CDD)/Capability Production Document (CPD) approval process, and other program documentation.

What does an MOA cover at a minimum?



What is a "New Start"? - CORRECT ANSA program, subprogram, project, or subproject not previously
justified by the Department and funded by the Congress through the normal budget process



Program initiation requires technology to have been demonstrated in a __________, which is
considered equivalent to ___________. - CORRECT ANSrelevant environment

,Technology Readiness Level (TRL) 6.



How does DoD categorize technology maturity? - CORRECT ANSTechnology Readiness Levels (TRLs) are
the way DoD has chosen to categorize a program's

technology maturity



What are the three parameters of the Net-Ready KPP? - CORRECT ANSAttribute 1. Supports military
operations:

Attribute 2. Is entered and managed on the network

Attribute 3. Effectively exchanges information



What are the overarching requirement documents for cybersecurity? - CORRECT ANSDoDI 8510.01 Risk
Management Framework (RMF)



DoDI 8500.01 Cybersecurity



DoDI 5000.02 Operations of the Defense Acquisition System



Clinger - Cohen Act (Cybersecurity Strategy) is a requirement



Which KPP covers cybersecurity requirements? - CORRECT ANSSystem Survivability KPP



What are inherently governmental activities? - CORRECT ANSAn activity that is so intimately related to
the public interest as to mandate performance by government personnel, such as Program Managers,
Integrated Product Team Leads, Contracting

, What is sufficient internal capability? - CORRECT ANSRequires the agency to have an adequate number
of positions filled by Federal employees with appropriate training, experience, and expertise



When do you consider Corrosion Prevention Control (CPC) and why? - CORRECT ANSCorrosion
Prevention and Control (CPC) is important in the early stages in a system development to reduce the
Total Ownership Cost (TOC) (Early in the ACQ process)



When is the Corrosion Prevention and Control (CPC) drafted and when is it required? - CORRECT ANSCPC
will be drafted during the Materiel Solution Analysis phase and is required prior to MS B



Key Activities in CPC Planning include:

-Establish Corrosion Prevention Team (CPT)

-Create documentation to implement CPC planning

-Include CPC considerations in source selection criteria

-Designing, manufacturing, testing, and supporting of the system - CORRECT ANSWhat are some of the
key activities in Corrosion Prevention and Control (CPC) planning?



What are some general design and technical considerations for Corrosion Prevention and Control (CPC)?
- CORRECT ANSGeneral Design and Technical Considerations:

-Material Selections

-Protective Coatings

-Design Geometries

-Environmental Mitigation

-Process/Finish Specification

-Environmental Factors(wind, rain, sand, salt, humidity)

-System Operational Tempo

Document information

Uploaded on
September 4, 2026
Number of pages
36
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
87
Last sold
-



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions