According to NCCCO tower crane reference manual when
possible installing the hoist wire rope on a tower crane you
should wind the rope with approximately how much of the
maximum permissible load - ANSWER-10% TCCM Wire rope 5-1
According to the ASME B30.3 what is the design factor for
rotation resistant load hoist wire rope - ANSWER-5.0 to 1 ASME
3-15.5 (b)
Who determines the correct hoist wire rope to be installed on
tower cranes - ANSWER-Manufacturer
What grade alloy steel chain should be used for crane hoisting
slings - ANSWER-80 OSHA 1910.184
According to ASME B30.3 using rotation resistant running rope
on a tower crane how many broken wires in six rope diameters
can you have to leave it in service. - ANSWER-1 ASME 3-
2.4.3(b)(2)
,2|Page
According to ASME B30.3 a periodic inspection of a tower
cranes wire rope shall be performed at least? - ANSWER-
Annually ASME 3-2.4.2(b)(1)
According to ASME B30.3 which inspection does not require
records to be kept - ANSWER-Frequent ASME 3-2.4.2
Wire rope lubricant is very important. It should be applied
according to who's recommendations? - ANSWER-Manufacturer
ASME 3-2.4.4(e)
When you have core failure in wire rope a common result is -
ANSWER-reduction in diameter ASME 3-2.4.2 (Figure 9)
According to OSHA 1926.550, Who is responsible for machinery
and equipment inspection before each use - ANSWER-
competent person
With a hook height of 350 feet, where should the hydraulic top
climbing unit be positioned before operating crane according to
chart B - ANSWER-Uppermost tie in position
, 3|Page
According to spacing chart B what is the distance from the face
of the structure to the center line of the crane - ANSWER-
10`10"
When is it permitted to shift the hoist gear of a tower crane -
ANSWER-Neutral Gear
According to ASME B30.3 an overhead power line is always
considered to be - ANSWER-Energized until the power company
had verified it is not energized
According to ASME B30.3 maintenance personnel are permitted
to operate the crane only when - ANSWER-Performing their
duties
According to ASME B30.3 who should be present when
telescoping or climbing operations begin - ANSWER-Operator
According to OSHA 1926.550 when a wire rope bridle is used to
connect the personnel platform to the load line, each bridle leg
shall be connected to a - ANSWER-Master Link
NCCCO TOWER CRANE FINAL EXAM NEWEST ACTUAL EXAM
COMPLETE 150 QUESTIONS AND CORRECT DETAILED
ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||JUST
OUT!!!
According to NCCCO tower crane reference manual when
possible installing the hoist wire rope on a tower crane you
should wind the rope with approximately how much of the
maximum permissible load - ANSWER-10% TCCM Wire rope 5-1
According to the ASME B30.3 what is the design factor for
rotation resistant load hoist wire rope - ANSWER-5.0 to 1 ASME
3-15.5 (b)
Who determines the correct hoist wire rope to be installed on
tower cranes - ANSWER-Manufacturer
What grade alloy steel chain should be used for crane hoisting
slings - ANSWER-80 OSHA 1910.184
According to ASME B30.3 using rotation resistant running rope
on a tower crane how many broken wires in six rope diameters
can you have to leave it in service. - ANSWER-1 ASME 3-
2.4.3(b)(2)
,2|Page
According to ASME B30.3 a periodic inspection of a tower
cranes wire rope shall be performed at least? - ANSWER-
Annually ASME 3-2.4.2(b)(1)
According to ASME B30.3 which inspection does not require
records to be kept - ANSWER-Frequent ASME 3-2.4.2
Wire rope lubricant is very important. It should be applied
according to who's recommendations? - ANSWER-Manufacturer
ASME 3-2.4.4(e)
When you have core failure in wire rope a common result is -
ANSWER-reduction in diameter ASME 3-2.4.2 (Figure 9)
According to OSHA 1926.550, Who is responsible for machinery
and equipment inspection before each use - ANSWER-
competent person
With a hook height of 350 feet, where should the hydraulic top
climbing unit be positioned before operating crane according to
chart B - ANSWER-Uppermost tie in position
, 3|Page
According to spacing chart B what is the distance from the face
of the structure to the center line of the crane - ANSWER-
10`10"
When is it permitted to shift the hoist gear of a tower crane -
ANSWER-Neutral Gear
According to ASME B30.3 an overhead power line is always
considered to be - ANSWER-Energized until the power company
had verified it is not energized
According to ASME B30.3 maintenance personnel are permitted
to operate the crane only when - ANSWER-Performing their
duties
According to ASME B30.3 who should be present when
telescoping or climbing operations begin - ANSWER-Operator
According to OSHA 1926.550 when a wire rope bridle is used to
connect the personnel platform to the load line, each bridle leg
shall be connected to a - ANSWER-Master Link