CM 4211 FINAL REVIEW QUESTIONS WITH VERIFIED SOLUTIONS LATEST UPDATE 2026

Document preview thumbnail
Preview 3 out of 20 pages

CM 4211 FINAL REVIEW QUESTIONS WITH VERIFIED SOLUTIONS LATEST UPDATE 2026 T/F: There is a strong correlation between economics prosperity and high levels of construction activities. - Answers True T/F: A subcontract is a contractor working under the prime contractor to do some phase of the construction onsite. - Answers True T/F: A prime contract is one that always involves the prime contractor - Answers True T/F: The four broad categories of construction are residential, commercial, industrial, and heavy highway civil. - Answers False Which one of the following contracts is more likely a bid contract as opposed to a negotiated one? • Cost plus percentage fee • Cost plus fixed fee • Cost plus incentive fee • Guaranteed maximum price • Lump sum - Answers Lump Sum Which one of the following is not an advantage of using pre-engineered metal building? • Speed of Construction • Design Flexibility • Reduced Liability Exposure • Minimal Maintenance • Relative Ease of Future Expansion - Answers Reduced Liability Exposure A Proprietorship is: • Simplest Form of Business • Always Owned by One Person • Business Where All Risks are Assumed by its Owner • All of the Above • A, C, not B - Answers All of the above "LLC" stands for: • Louisiana Liability Company • Limited Liability Company • Louisiana Limited Corporation • Louisiana Limited Company • None of the Above - Answers Limited Liability Company Which one of the following is not a characteristic of a corporation? • Limited Liability of its Owners • Perpetual Life of Company • Ease of Raising Capital • Decentralized Management • Transferability of Ownership - Answers Decentralized Management A construction manager may be required to be licensed: • As an Architect • As an Engineer • As a Contractor • None of the Above - Answers None of the above T/F: A partnership is an association of two or more entities to carry on a business for mutual profit - Answers True T/F: A partnership agreement must be in writing - Answers False T/F: A general partner is an agent of the partnership - Answers True T/F: In a dissolution of a partnership, a commercial lender gets paid before a partner lender - Answers True T/F: A partner may assign some rights to profits from the partnership to an outsides; sub partnership - Answers True T/F: "Duty" is a specifically defined task that cannot be delegated to another person - Answers True T/F: "Authority" is the ability to act or make a decision without having to gain approval - Answers True T/F: "Authority" not be delegated to others - Answers False T/F: "Responsibility" implies the accountability of supervisor for assigned function or duty - Answers True T/F: A list of duties for a construction company should be as detailed as necessary and appropriate considering the size of the company and the number of employees involved. - Answers True T/F: The list of duties for a given position in a company is called the Job Description - Answers True T/F: Organization Charts show every position of responsibility and all lines of supervision and authority - Answers True T/F: Vertical division in a company organization refers to the establishment of lines of supervision - Answers True A positive environment and favorable work atmosphere is created by all but one of the following, which one? • Motivation • Personnel Development • Overtime Work • Training of Replacements • Decision Making - Answers Overtime Work Which one of the following is not one of the Louisiana civil code requirements for a contract to be valid? • A Certain Object • Consent Legally Given • Parties Legally Capable of Contraction • A Lawful Purpose • All of the Above are Requirements - Answers All of the Above T/F: An offer is a conditional willingness to enter into a contract - Answers False T/F: Consideration is the value given by the parties to a contract - Answers True T/F: An acceptance is an unconditional agreement to an offer - Answers True T/F: A counter offer is a conditional agreement to an offer - Answers True T/F: A counter offer requires an acceptance by the original offeror to have an agreement - Answers True T/F: Privity is the existence of a contractual relationship needed for contract liability to flow. - Answers True T/F: A "third party" is someone who is not a party to a contract. - Answers True T/F: A third party may have a beneficiary relationship to the parties of a contract if it can be shown that there was intent for the third party to benefit from the contract. - Answers True T/F: A contract that requires strict adherence to a schedule is usually sufficient to prove a third party beneficiary relationship. - Answers True T/F: Multiple prime contracts never have third party beneficiaries. - Answers False T/F: Tort liability may be intentional or via negligence. - Answers True T/F: Contract liability may be express or implied. - Answers True T/F: Contract liability can only be via negligence and not intentional. - Answers False T/F: Statutory liability may be express or implied. - Answers True T/F: Strict liability is not a source of liability - Answers True Which one of the following is not an entity affected by construction? • The owner of the construction project • The prime contractor on the project • Subcontractors working on the project • The general public near the project • All of the above are affected entities - Answers All of the above Which one of the following is not an option of the Owner when selecting a design firm? • Submissions from interested designers, with selection based on professional qualifications alone. • Submissions that include designation of fees, which become a part of the evaluation criteria. • Bids for professional services and selection on the basis of price alone. • As directed by the prime contractor. • All of the above are options. - Answers As directed by the prime contractor Contractor input into design is common on all of the following construction contracts, except one, which one? • Negotiated contracts • Design-bid-build • Design-build • Construction management • Design manage - Answers Design-bid-build Which one of the following is not an important function of the drawings and specifications? • To designate the materials to be used or provided • To designate the quality of the workmanship required • To show the contractor awarded the contract how the work is to be done • To show the nature and extent of the construction to be done • All of the above are important functions - Answers All of the above are important functions T/F: An Owner's contract with an architect is for design services only. - Answers False T/F: An Architect is usually the lead designer on building projects, both residential and commercial. - Answers True T/F: An Engineer is usually the lead designer on industrial and heavy/highway/civil projects. - Answers True T/F: An Owner may contract with a construction manager for services before design, during design, or for representation during construction. - Answers True T/F: An Owner may contract with a construction company for building services only - Answers True T/F: A cost-plus-percentage-fee contract is one where the contractor is reimbursed for his cost plus a fee that is a percentage of those costs. - Answers True T/F: A contractor has no incentive to hold down costs on a lump sum contract. - Answers False T/F: A cost-plus-fixed-fee contract is one where the contractor receives the same fee no matter how high or low the reimbursable cost. - Answers True T/F: A guaranteed maximum price contract is one where the total payment to the contractor of cost and fees is capped, no matter how high the cost runs. - Answers True T/F: A target estimate contract is one where the contractor has an incentive to hold down costs. - Answers True T/F: A turnkey contract is one where the contractor performs virtually every task required to produce a finished functioning facility. - Answers True T/F: A turnkey contract is always a construct only contract. - Answers False T/F: A fast tracked project is one in which the construction of one phase is started before the design of another phase is completed. - Answers True T/F: A fast track project should be design-construct contract. - Answers True T/F: A drawback to fast tracking a project is the risk that after construction is already in place a problem may develop with subsequent design that requires changes to the work already done. - Answers True Retainage (retention) is the amount the owner keeps from the contractor's progress payments to pay for: • Remedial Work • Extra Work Items in Change Orders • The Attorney's Retainer • Penalties for disagreements between the Contractor and the Owner • None of the Above - Answers Remedial Work An escalation clause is: • An increase in the contract price for a long-term project in the event labor and or material cost decrease. • Applicable when a building contract includes an escalator. • An increase in liquidated damages when a contractor could hae completed the contract on time. • An increase in contract price when the owner willfully interferes. • None of the above. - Answers None of the above. Which one of the following is usually found in a Physical Conditions Report? • Soil Conditions • Subsurface Conditions • Weather Records • All of the Above • None of the Above - Answers All of the Above Which one of the following is not an important consideration the contractor and owner must pay attention to when negotiating a cost-plus type contract? • A definite and mutually agreeable subcontracting procedure. • The determination and payment of the prim contractor's fee. • A common understanding of the accounting methods. • A list of job costs to be reimbursable. • All of the above are important considerations. - Answers All of the above T/F: The main disadvantage to the Owner of using a cost-plus-percentage of cost contract is the incentive for the Contractor to hold down construction cost. - Answers False T/F: Unit-price contracts are based on estimated quantities of defined items of work. - Answers True T/F: A cost-plus-fixed-fee contract encourages the Contractor to finish as soon as possible and move on to another project. - Answers True T/F: Lump sum contracts should be limited to projects that can be accurately and completely described. - Answers True T/F: The main reason a guaranteed maximum cost contract is used is so the total cost will not exceed the Owner's funding ability. - Answers True Which one of the following is not one of the six typical documents comprising the contract documents? • Physical condition reports • Specifications • Plans • Notice to Proceed • General Conditions - Answers Notice to Proceed An advertisement for a bid should always include four items of information which one of the following does not have to be included? • Identity of the Project • Time and Place of the Bid Opening • Bond Information • How and Where to Retrieve the Bid Documents • Identity of the Owner - Answers Bond Information Which one of the following statements is not true regarding the bid form? • It is drafted by the Owner • It is completed by the Contractor • It is the offer by the Contractor • It is the contract • All of the above are true - Answers It is the contract Which one of the following is found in the General Conditions? • The Specifications • The Supplementary Conditions • The Amount Bid • The Physical Conditions Reports • None of the Above - Answers None of the Above The five threshold red flag prime contract clauses include: • Delays of work, Suspensions of Work, Terminations of Work, Partial Terminations of Work, and Identity of the Owner • Changes in the Work, Differing Site Conditions, Delays of Work, Dispute Resolution, and Terminations of Work • Differing Site Conditions, Liquidated Damages, Site Availability, Retainage Provisions, and Changes in the Work • Changes in the Work, Differing Site Conditions, Completion Date of the Work, Liquidated Damages, and Delays/Terminations of the Work • None of the Above - Answers Changes in the Work, Differing Site Conditions, Delays of Work, Dispute Resolution, and Terminations of Work T/F: The parties can agree on a method of dispute resolution other than litigation. - Answers True

Content preview

CM 4211 FINAL REVIEW QUESTIONS WITH VERIFIED SOLUTIONS
LATEST UPDATE 2026


T/F: There is a strong correlation between economics prosperity and high levels of
construction activities. - Answers True
T/F: A subcontract is a contractor working under the prime contractor to do some
phase of the construction onsite. - Answers True
T/F: A prime contract is one that always involves the prime contractor - Answers
True
T/F: The four broad categories of construction are residential, commercial, industrial,
and heavy highway civil. - Answers False
Which one of the following contracts is more likely a bid contract as opposed to a
negotiated one?
• Cost plus percentage fee
• Cost plus fixed fee
• Cost plus incentive fee
• Guaranteed maximum price
• Lump sum - Answers Lump Sum
Which one of the following is not an advantage of using pre-engineered metal
building?
• Speed of Construction
• Design Flexibility
• Reduced Liability Exposure
• Minimal Maintenance
• Relative Ease of Future Expansion - Answers Reduced Liability Exposure
A Proprietorship is:
• Simplest Form of Business
• Always Owned by One Person
• Business Where All Risks are Assumed by its Owner
• All of the Above
• A, C, not B - Answers All of the above
"LLC" stands for:
• Louisiana Liability Company
• Limited Liability Company
• Louisiana Limited Corporation
• Louisiana Limited Company
• None of the Above - Answers Limited Liability Company
Which one of the following is not a characteristic of a corporation?
• Limited Liability of its Owners
• Perpetual Life of Company
• Ease of Raising Capital
• Decentralized Management
• Transferability of Ownership - Answers Decentralized Management
A construction manager may be required to be licensed:
• As an Architect
• As an Engineer
• As a Contractor
• None of the Above - Answers None of the above

,T/F: A partnership is an association of two or more entities to carry on a business for
mutual profit - Answers True
T/F: A partnership agreement must be in writing - Answers False
T/F: A general partner is an agent of the partnership - Answers True
T/F: In a dissolution of a partnership, a commercial lender gets paid before a partner
lender - Answers True
T/F: A partner may assign some rights to profits from the partnership to an outsides;
sub partnership - Answers True
T/F: "Duty" is a specifically defined task that cannot be delegated to another person -
Answers True
T/F: "Authority" is the ability to act or make a decision without having to gain
approval - Answers True
T/F: "Authority" not be delegated to others - Answers False
T/F: "Responsibility" implies the accountability of supervisor for assigned function or
duty - Answers True
T/F: A list of duties for a construction company should be as detailed as necessary
and appropriate considering the size of the company and the number of employees
involved. - Answers True
T/F: The list of duties for a given position in a company is called the Job Description -
Answers True
T/F: Organization Charts show every position of responsibility and all lines of
supervision and authority - Answers True
T/F: Vertical division in a company organization refers to the establishment of lines
of supervision - Answers True
A positive environment and favorable work atmosphere is created by all but one of
the following, which one?
• Motivation
• Personnel Development
• Overtime Work
• Training of Replacements
• Decision Making - Answers Overtime Work
Which one of the following is not one of the Louisiana civil code requirements for a
contract to be valid?
• A Certain Object
• Consent Legally Given
• Parties Legally Capable of Contraction
• A Lawful Purpose
• All of the Above are Requirements - Answers All of the Above
T/F: An offer is a conditional willingness to enter into a contract - Answers False
T/F: Consideration is the value given by the parties to a contract - Answers True
T/F: An acceptance is an unconditional agreement to an offer - Answers True
T/F: A counter offer is a conditional agreement to an offer - Answers True
T/F: A counter offer requires an acceptance by the original offeror to have an
agreement - Answers True
T/F: Privity is the existence of a contractual relationship needed for contract liability
to flow. - Answers True
T/F: A "third party" is someone who is not a party to a contract. - Answers True
T/F: A third party may have a beneficiary relationship to the parties of a contract if it
can be shown that there was intent for the third party to benefit from the contract. -
Answers True

, T/F: A contract that requires strict adherence to a schedule is usually sufficient to
prove a third party beneficiary relationship. - Answers True
T/F: Multiple prime contracts never have third party beneficiaries. - Answers False
T/F: Tort liability may be intentional or via negligence. - Answers True
T/F: Contract liability may be express or implied. - Answers True
T/F: Contract liability can only be via negligence and not intentional. - Answers
False
T/F: Statutory liability may be express or implied. - Answers True
T/F: Strict liability is not a source of liability - Answers True
Which one of the following is not an entity affected by construction?
• The owner of the construction project
• The prime contractor on the project
• Subcontractors working on the project
• The general public near the project
• All of the above are affected entities - Answers All of the above
Which one of the following is not an option of the Owner when selecting a design
firm?
• Submissions from interested designers, with selection based on professional
qualifications alone.
• Submissions that include designation of fees, which become a part of the evaluation
criteria.
• Bids for professional services and selection on the basis of price alone.
• As directed by the prime contractor.
• All of the above are options. - Answers As directed by the prime contractor
Contractor input into design is common on all of the following construction contracts,
except one, which one?
• Negotiated contracts
• Design-bid-build
• Design-build
• Construction management
• Design manage - Answers Design-bid-build
Which one of the following is not an important function of the drawings and
specifications?
• To designate the materials to be used or provided
• To designate the quality of the workmanship required
• To show the contractor awarded the contract how the work is to be done
• To show the nature and extent of the construction to be done
• All of the above are important functions - Answers All of the above are important
functions
T/F: An Owner's contract with an architect is for design services only. - Answers
False
T/F: An Architect is usually the lead designer on building projects, both residential
and commercial. - Answers True
T/F: An Engineer is usually the lead designer on industrial and heavy/highway/civil
projects. - Answers True
T/F: An Owner may contract with a construction manager for services before design,
during design, or for representation during construction. - Answers True
T/F: An Owner may contract with a construction company for building services only -
Answers True

Document information

Uploaded on
September 3, 2026
Number of pages
20
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$11.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TutorJosh
3.5
(76)
Sold
498
Followers
16
Items
32947
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions