Virginia Commercial Building Contractor (CBC) Exam
1. CBC classification scope and limits
2. Commercial code and permit requirements
3. Sitework, foundations and structural systems
4. Concrete, masonry and steel construction
5. Commercial roofs and building envelope
6. Interior construction and finishes
7. Accessibility and life-safety coordination
8. Plans, specifications, estimating and scheduling
9. Safety, quality control and subcontractor management
10. Virginia contractor law and business requirements
1. In a routine inspection, which choice best explains expansion joint when dealing
with Commercial roofs and building envelope, and the main reason the item is used
on the project on this particular project?
A. increase electrical current in this case
B. remove roof drainage
C. replace foundations
D. allow controlled movement between portions of a structure or pavement
Correct Answer: D
Rationale: Allow controlled movement between portions of a structure or pavement is the
main concept that applies in this construction situation.
,2. After checking the project documents, which answer correctly identifies expansion
joint when dealing with CBC classification scope and limits, and the main reason the
item is used on the project on this particular project?
A. allow controlled movement between portions of a structure or pavement
B. increase electrical current in this case
C. remove roof drainage
D. replace foundations
Correct Answer: A
Rationale: Allow controlled movement between portions of a structure or pavement is the
main concept that applies in this construction situation.
3. While planning the work, which choice most accurately explains inspection when
dealing with Concrete, masonry and steel construction, and the best reason this
requirement matters for safe construction on this particular project?
A. replace the contract in this case
B. set wages
C. verify covered work against applicable code or approved requirements
D. approve zoning
Correct Answer: C
Rationale: Verify covered work against applicable code or approved requirements is the
main concept that applies in this construction situation.
4. During a project, which simple answer best explains punch list when dealing with
Interior construction and finishes, and the function that should guide the contractor's
,decision?
A. identify incomplete or corrective work near project completion
B. estimate excavation volume in this case
C. replace the site plan
D. calculate electrical load
Correct Answer: A
Rationale: Identify incomplete or corrective work near project completion is the main
concept that applies in this construction situation.
5. While planning the work, which choice most accurately explains inspection when
dealing with Concrete, masonry and steel construction, and the best reason this
requirement matters for safe construction on this particular project?
A. verify covered work against applicable code or approved requirements
B. replace the contract in this case
C. set wages
D. approve zoning
Correct Answer: A
Rationale: Verify covered work against applicable code or approved requirements is the
main concept that applies in this construction situation.
6. During project closeout, which option correctly describes Qualified Individual when
dealing with Safety, quality control and subcontractor management, and the basic rule
or concept that applies to this work on this particular project?
A. serve as the project owner in this case
, B. issue permits
C. demonstrate required competency for the classification or specialty through applicable
qualifications
D. set tax rates
Correct Answer: C
Rationale: Demonstrate required competency for the classification or specialty through
applicable qualifications is the main concept that applies in this construction situation.
7. During a project, which simple answer best explains subcontractor when dealing
with Interior construction and finishes, and the purpose of the item or requirement in
this situation on this particular project?
A. perform specialized work under contract while the prime contractor remains
responsible within applicable duties
B. replace the owner in this case
C. issue building permits
D. approve zoning changes
Correct Answer: A
Rationale: Perform specialized work under contract while the prime contractor remains
responsible within applicable duties is the main concept that applies in this construction
situation.
8. For this construction situation, which answer most clearly describes punch list
when dealing with Virginia contractor law and business requirements, and the
function that should guide the contractor's decision on this particular project?
1. CBC classification scope and limits
2. Commercial code and permit requirements
3. Sitework, foundations and structural systems
4. Concrete, masonry and steel construction
5. Commercial roofs and building envelope
6. Interior construction and finishes
7. Accessibility and life-safety coordination
8. Plans, specifications, estimating and scheduling
9. Safety, quality control and subcontractor management
10. Virginia contractor law and business requirements
1. In a routine inspection, which choice best explains expansion joint when dealing
with Commercial roofs and building envelope, and the main reason the item is used
on the project on this particular project?
A. increase electrical current in this case
B. remove roof drainage
C. replace foundations
D. allow controlled movement between portions of a structure or pavement
Correct Answer: D
Rationale: Allow controlled movement between portions of a structure or pavement is the
main concept that applies in this construction situation.
,2. After checking the project documents, which answer correctly identifies expansion
joint when dealing with CBC classification scope and limits, and the main reason the
item is used on the project on this particular project?
A. allow controlled movement between portions of a structure or pavement
B. increase electrical current in this case
C. remove roof drainage
D. replace foundations
Correct Answer: A
Rationale: Allow controlled movement between portions of a structure or pavement is the
main concept that applies in this construction situation.
3. While planning the work, which choice most accurately explains inspection when
dealing with Concrete, masonry and steel construction, and the best reason this
requirement matters for safe construction on this particular project?
A. replace the contract in this case
B. set wages
C. verify covered work against applicable code or approved requirements
D. approve zoning
Correct Answer: C
Rationale: Verify covered work against applicable code or approved requirements is the
main concept that applies in this construction situation.
4. During a project, which simple answer best explains punch list when dealing with
Interior construction and finishes, and the function that should guide the contractor's
,decision?
A. identify incomplete or corrective work near project completion
B. estimate excavation volume in this case
C. replace the site plan
D. calculate electrical load
Correct Answer: A
Rationale: Identify incomplete or corrective work near project completion is the main
concept that applies in this construction situation.
5. While planning the work, which choice most accurately explains inspection when
dealing with Concrete, masonry and steel construction, and the best reason this
requirement matters for safe construction on this particular project?
A. verify covered work against applicable code or approved requirements
B. replace the contract in this case
C. set wages
D. approve zoning
Correct Answer: A
Rationale: Verify covered work against applicable code or approved requirements is the
main concept that applies in this construction situation.
6. During project closeout, which option correctly describes Qualified Individual when
dealing with Safety, quality control and subcontractor management, and the basic rule
or concept that applies to this work on this particular project?
A. serve as the project owner in this case
, B. issue permits
C. demonstrate required competency for the classification or specialty through applicable
qualifications
D. set tax rates
Correct Answer: C
Rationale: Demonstrate required competency for the classification or specialty through
applicable qualifications is the main concept that applies in this construction situation.
7. During a project, which simple answer best explains subcontractor when dealing
with Interior construction and finishes, and the purpose of the item or requirement in
this situation on this particular project?
A. perform specialized work under contract while the prime contractor remains
responsible within applicable duties
B. replace the owner in this case
C. issue building permits
D. approve zoning changes
Correct Answer: A
Rationale: Perform specialized work under contract while the prime contractor remains
responsible within applicable duties is the main concept that applies in this construction
situation.
8. For this construction situation, which answer most clearly describes punch list
when dealing with Virginia contractor law and business requirements, and the
function that should guide the contractor's decision on this particular project?